6S Simulation - K. Berry 1/29/2010 1 6S Simulation.

Slides:



Advertisements
Similar presentations
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Advertisements

5S training Office Environments.
Lean 6S Training Mercy Medical Center Welcome to Lean 6S Training.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Reminders about Binders September 4, Objective By the end of today’s session, you will be able to identify the components of the AVID binder system.
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
Housestaff Lean Academy Module 3: Examining the Current State (Process Mapping, Observations, and Waste) Robert Martin, PsyD Performance Excellence UCLA.
Preparing Student Records for Retention Procurement Services May 20, 2013.
Process Mapping. Why Process Map? To create a visual diagram of a process To establish a common language Assists in discussing improvement The end result.
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
A fun and exciting way to present the 5S concepts to our team!
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean Training Standard Work. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
Fluorescence Vanderbilt Student Volunteers for Science Spring 2007.
Tools To Make Waste Visible. 2 FOR INTERNAL USE ONLY Module Objectives By the end of this module, the participant should be able to:  Develop a Spaghetti.
Six Sigma Simplicity 1 Facilitator Notes for Simulation.
Simple Process Mapping Techniques
Detailed Process Mapping
Philosophy and Key Concepts
Instructions for the Facilitator of the game. Please watch this presentation in slideshow mode 2.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Lean Manufacturing Visual Systems XYZ Company.
Organizing Your Research & Files  To be successful in your genealogy research, you must be able to plan each research step and organize the information.
“Without the Cost of Waste …”
Storyboarding The Why and the How…. A set of drawings that represent screen layout sequences First used by filmmakers to plan the sequences of movie scenes.
Newspaper Steps Volume One. Brainstorm Story Ideas Take five minutes for each group member to write a list of 5 topics Share that list one-by-one, as.
Intermediates  Warm-Cool-Analogous Objective: You will mix intermediate colors in order make warm, cool, and analogous colors schemes. DRILL: 1.Get a.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
Preparing Your School’s FCAT WRITING Folders For Return.
English Skills Directions Write your name on the stickers you have been given Write your name on the stickers you have been given In each corner of the.
This is a quick and fun game that you can play with your team or new team members It shows in an interactive way, the benefits of putting things in the.
Outline. Materials needed Your outline A sheet of paper black or blue pen red pen.
 Sign In and find your assigned table  Enjoy breakfast items  You will NOT need a computer until much later  Be ready to share at 9 a.m. a check for.
1.2 How Can We Work Together? Pg. 7 Creating a Quilt Using Symmetry and Investigations.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Training Day 5 Customer Order Processing Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.
Charcoal DRILL: Take out progress report. 1.Title a new page: “CHARCOAL/ CHALK” You may want to make a 2 page spread. 2.What is charcoal? 3.Who were the.
Safety Series Safety Leadership Series 5 S + 1 Safety Makes the Difference!!!
Purpose: To help demonstrate the lean principles Time: 1 hour Airplane Exercise.
Classroom Procedures Ms. Haut.
YOUR FESTIVAL START PLANNING IN MORE DETAIL. WORD DOCUMENT Transferred spider diagram and headings into a word document. Add more details to this document.
Red Table – Station 1 Read instructions carefully and then complete the activity.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Opportunities for Participation (4) Lower 6 th AS level Phys Ed. “SPORT” - Task.
August 29, 2014 Warm Up Please sharpen pencil before you sit down. Please collect file folder before you sit down. Take seat Silently and sit down Take.
Present apply review Introduce students to a new topic by giving them a set of documents using a variety of formats (e.g. text, video, web link etc.) outlining.
Parent ICT Workshop Crystal Hewett. Why PowerPoint? PowerPoint is a high-powered software tool used for presenting information in a dynamic slide show.
Door Monitor and Greeter
Mel Wendell – Mountain Pointe High School
Lean Paper Airplane Game Grades 6 - 8
Vanderbilt Student Volunteers for Science Spring 2007
Session Ten: Communication
7/14/16 CTC-RI IBH Pilot Quarterly Meeting
HIV Drug Resistance Training
Pricing your Products to be Profitable
5S and Visual Control Superfactory Excellence Program™ www
The Academic Writing Process
Using Surfcam to Produce a Numeric Control (NC) Program
Continuous Improvement Coordinator
Quiz 3.
Quiz 3.
Manufacturing Planning
Drive for Safety (6S = 5s +1)
Scottish Improvement Skills
Kanban for Inventory Management
Macbeth Essay Outline.
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
When should root cause analysis be performed?
Waste.
Presentation transcript:

6S Simulation - K. Berry 1/29/ S Simulation

6S Simulation - K. Berry 1/29/ Instructions to the Class Worker  Gather White, Yellow and Blue sheets of paper  Paper clip the sheets together  Place in a folder  Place post-it on the outside of the folder  Place folder and contents on the chair (to be picked up by a delivery person) Manager  Create a spaghetti diagram: Draw a rough draft of the room layout identifying the location of the supplies used in the simulation Draw a rough draft of the room layout identifying the location of the supplies used in the simulation As Participant #1 walks the process, trace his/her footsteps on the spaghetti diagram As Participant #1 walks the process, trace his/her footsteps on the spaghetti diagram

6S Simulation - K. Berry 1/29/ Instructions to the Class  Efficiency Expert #1 Count the number of steps Person #1 travels from beginning to end in the process. Count the number of steps Person #1 travels from beginning to end in the process.  Efficiency Expert #2 Track how much time Participant #1 takes to do the entire process Track how much time Participant #1 takes to do the entire process Track how much time is wasted waiting and/or searching Track how much time is wasted waiting and/or searching  Customer Do a quality inspection on the finished product against the sample provided to you by the Instructor Do a quality inspection on the finished product against the sample provided to you by the Instructor  Co-workers (Rest of Class) Identify the 8 Forms of Waste in our process Identify the 8 Forms of Waste in our process Identify possible ideas for improvement Identify possible ideas for improvement

6S Simulation - K. Berry 1/29/ What Are the Results?  Worker How did the process feel to you? How did the process feel to you?  Manager What does the spaghetti diagram show us? What does the spaghetti diagram show us?  Efficiency Expert #1 How many steps did it take to do the process? How many steps did it take to do the process?  Efficiency Expert #2 How much time did the entire process take? How much time did the entire process take? How much time was wasted waiting and/or searching? How much time was wasted waiting and/or searching?  Customer Did the product meet or exceed the customer’s requirements (quality inspection)? Did the product meet or exceed the customer’s requirements (quality inspection)?  Rest of Class Identify forms of waste in the process Identify forms of waste in the process Include possible ideas for improvement Include possible ideas for improvement

6S Simulation - K. Berry 1/29/ Where is the Waste?  What forms of waste can we identify in our process? Wasted Human Talent – Wasted Human Talent – Defects – Defects – Inventory – Inventory – Over Producing – Over Producing – Waiting – Waiting – Motion – Motion – Transportation – Transportation – Over Processing – Over Processing –

6S Simulation - K. Berry 1/29/ Quantifying the Results BeforeAfterImprovement Number of Defects Excess Inventory Over Producing (scrap) Waiting Motion/Transportation * Capture on Flip Chart Paper

6S Simulation - K. Berry 1/29/ How Can We Use 6S to Improve? 1. Sort – Separate the needed from the not needed 2. Straighten – A place for everything and everything in its place 3. Scrub – Ensure everything is in perfect working condition 4. Standardize – Determine the best method – visual queues, labeling, etc. 5. Sustain – Develop Standard Work 6. Safety – Safety first at all times

6S Simulation - K. Berry 1/29/ Instructions to the Class  Now that you have identified the waste and the opportunities for improvement in the process Put your recommended improvements in place Put your recommended improvements in place We’ll run the simulation a second time We’ll run the simulation a second time Then we’ll measure the results… Then we’ll measure the results… ….and celebrate our success!!

6S Simulation - K. Berry 1/29/  Following slides are Facilitator Instructions

6S Simulation - K. Berry 1/29/ Facilitator Instructions – Set Up  The placement of the materials is probably the most critical piece of this very simple simulation. The entire simulation takes minutes max.  Spread the paper, file folders, post-its, supplies (boxes of paper clips) randomly around the room. Make certain nothing is in the sequence that it will be used. For example, don’t place the pieces of paper together in one location (motion).  The red folders are mixed in with various other colored folders (excess inventory) in a pile (searching).  Paper clip boxes are in with various other supplies (searching). However, all of the boxes are empty (defect) so the team will have to ask you to supply them with a new box of paper clips (waiting).

6S Simulation - K. Berry 1/29/  Have a quality check at the end of the process. This is to show students the value of standard work.  The final product should meet the following criteria:  Sheets of paper (one of each color)must be in the following order: 1. 1 Blue Sheet 2. 1 White Sheet 3. 1 Yellow Sheet  Paper clip sheets together per the example below  The folder must be RED  The post-it must be on the upper left corner of the folder Facilitator Instructions – Set Up

6S Simulation - K. Berry 1/29/ Standard Work – Handout for the Customer Create a sample folder that is given to the “Customer” during the simulation. Ask that the Customer not share this information with the rest of the class.

6S Simulation - K. Berry 1/29/ Quantifying the Results BeforeAfterImprovement Number of Defects Excess Inventory Over Producing (scrap) Waiting Motion/Transportation Create this chart on Flip Chart Paper prior to the start of the class

6S Simulation - K. Berry 1/29/ Facilitator Instructions - Spaghetti Diagram Paper Clips Post its X X Before After Sample – The class should create this during the simulation

6S Simulation - K. Berry 1/29/ Facilitator Instructions - Waste in the Process  Wasted Human Talent – The team wasn’t involved in designing the process The team wasn’t involved in designing the process  Defects – Paper clips were missing; not meeting customer requirements (lack of standard work) Paper clips were missing; not meeting customer requirements (lack of standard work)  Inventory – Excess folders (any folder that isn’t red) Excess folders (any folder that isn’t red)  Over Producing – Having more sheets of paper in the folder than is required Having more sheets of paper in the folder than is required  Waiting – For new box of paper clips For new box of paper clips  Motion – Searching for the right folder; paper clips mixed in with supplies. Searching for the right folder; paper clips mixed in with supplies.  Transportation – Carrying paper, paper clips etc. to where they are needed (at the chair). Carrying paper, paper clips etc. to where they are needed (at the chair).  Over Processing – More pieces of paper in the folder than required. More pieces of paper in the folder than required.

6S Simulation - K. Berry 1/29/ Facilitator Instructions - 6S Improvements  Sort - Purge items that are not needed (i.e. remove colored folders that are not part of the process) Purge items that are not needed (i.e. remove colored folders that are not part of the process)  Straighten - Determine an appropriate place for everything (co-locate) Determine an appropriate place for everything (co-locate) Ensure the supplies are placed in the sequence they will be used. Ensure the supplies are placed in the sequence they will be used.  Scrub - Make certain everything is in working order (paper clips are available, etc) Make certain everything is in working order (paper clips are available, etc)  Standardize - Add labeling & visual controls Add labeling & visual controls Develop work instructions Develop work instructions  Sustain - Develop standard work Develop standard work  Safety -