Exploring solutions to challenges on financing and certification on locally produced renewable products Johan van den Berg Chair: Steering Committee South.

Slides:



Advertisements
Similar presentations
COMMONWEALTH YOUTH PROGRAMME AFRICA CENTRE COMMONWEALTH SECRETARIAT Youth Enterprise Development and Youth Employment Experiences and Lessons from Commonwealth.
Advertisements

RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
Beyond MDGs: an African perspective Abebe Shimeles, Principal Research Economist Department, African Development Bank.
Dr. Bader Eddin Al-Majali
Overview of the Global Fund: Guiding Principles Grant Cycle / Processes & Role of Public Private Partnerships Johannesburg, South Africa Tatjana Peterson,
Aluminium Beneficiation Initiative [ABI]
PANEL DISCUSSION ON RENEWABLE ENERGY PROCUREMENT FOR INDEPENDENT POWER PRODUCERS BIDDING: WINDOW 1 Johan van den Berg Chair: Steering Committee South African.
Renewable Energy in Islamic Republic Of Iran
East Midlands Councils Regional Retrofit – a model Emily Braham, LHA-ASRA Ellie Horwitch-Smith, NCH.
PRESENTATION: Energy Consultative Meeting DATE: 7 June, 2012 PRESENTATION BY: Stephen Forder.
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Personal Finance Benchmark Demonstrate an understand that personal spending, saving, and credit decisions have significant implications for the.
Concentrated Solar Power in Middle East and North Africa 9 June 2011 Philippe Roos
Renewable Energy in Africa: UNEP’s Initiatives Climate Change Kiosk, UNEP Event, COP12/MOP2 Sami Kamel, UNEP RISOE Centre Nairobi, Kenya November 17t h,
Renewable Energies in Germany at a Glance - Focus on Geothermal Energy János Büchner, energiewaechter GmbH Consultant.
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
+ DOING GOOD WIND BUSINESS IN SOUTH AFRICA – EWEA 2014 Johan van den Berg CEO, SAWEA.
Copyright 2009 IDC. Reproduction is forbidden unless authorized. All rights reserved. The Economic Impact of IT, Software and Microsoft in South Africa.
ACTIVITIES OF SUPPORTING SMES DEVELOPMENT IN VIETNAM
SOLAR PARK TP Nchocho Group Executive: Investment Banking Division 28 October 2010 Development Bank of Southern Africa.
State Policy & Green Jobs 1.0: Economic and Workforce Development EARN Annual Conference December 9, 2008 Jeannine La Prad, President & CEO.
“Wind Power for Local Economic Development: South Africa leading the Way”
Is there a market for clean technology SMEs? The opportunity for SMEs in cleantech industries in developing countries James Rawlins, Associate Director.
South Africa Solar Energy Technology Road Map SA SETRM PROCESS Eskom/ CSP Solar Augmentation Conference Pretoria, South Africa August 27, 2013 Michael.
Micro Renewables The Future of Plumbing? March 11, 2010 David McKenzie Scottish Microrenewables Working Group World Plumbing Day.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
European Economic and Social Committee EUROPEAN INDUSTRY AND MONETARY POLICY The role of the European Investment Bank MAIN PROVISIONAL CONCLUSIONS (To.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
Sustainable Energy Society of Southern Africa Creating a Sustainable Solar Water Heating Industry in SA.
Calculating Costs. Costs Aim: Understand what a business costs are. HW: Ch 16 Q. 1 & 2 pg 65 & 67.
REALISING THE VISION PACKAGING & PAPER INDUSTRY WASTE MANAGEMENT PLAN 24 MARCH 2015 Charles Muller EXECUTIVE DIRECTOR PACSA ( PACKAGING SA )
SMEs in Canada Facts Federal Role. 1 Outline Overview of SMEs in Canada Roles of Government.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Economic Instruments Expert Group Meeting on Enabling Measures for Inclusive Green Economy in Africa 23 and 24 September 2014, UNCC, Addis Ababa, Ethiopia.
Commissioning Self Analysis and Planning Exercise activity sheets.
Chapter 2 Economic Resources and Systems. Factors of Production  Just as individuals have to deal with a shortage of resources, so do societies  A society.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
Back to Table of Contents pp Chapter 2 Economic Resources and Systems.
Business Development RESEARCH & DEVELOPMENT CONTRIBUTION TO POLICY DEVELOPMENT Lerato Mmutlana CSIR Strategic Business & Relationship Manager: Government.
1 Transformation in the Petroleum Industry – The Journey Presentation to the Parliamentary Portfolio Committee for Minerals and Energy 10 MAY 2007 Prepared.
Status: Confidential Economic Development Department to Select Committee MTEF allocations to Infrastructure PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION.
Driving towards Impact through Development Goals Washington, DC 04/13/2011.
SANEA/NPC dialogue on energy in the NDP: Innovation and investment by the private sector Johan van den Berg Chair November 2014.
Skills development in the Renewable Energy Sector in South Africa Johan van den Berg Chair: Steering Committee South African Renewable Energy Council 11.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
M-WERC Overview 3/14/16 Alan Perlstein Executive Director & CEO Midwest Energy Research Consortium.
REIPPP Bidders Conference 16 August 2012 Green Industries, Department of Trade and Industry.
MGT601 SME MANAGEMENT Lesson 02 The Regional Concept of SMEs.
Small Business Development Programme 19 May 2016.
Commission 2: Manufacturing S.Sakoschek Gauteng Economic Indaba, 8-9 June 2016.
Werner Weiss AEE - Institute for Sustainable Technologies (AEE INTEC) A-8200 Gleisdorf, Feldgasse 19 AUSTRIA SOLTRAIN Targets and Results.
IN SUMMARY The ultimate aim of discussion about MYPD3 should be to ensure the long term well-being and sustainability of the people of SA – renewables.
Massachusetts Clean Energy Center Budget Overview
DEPUTY CEO, BUSINESS UNITY SOUTH AFRICA
COMPANY BACKGROUND IL MOLINO is situated in Johannesburg South, within close proximity to the Johannesburg CBD. IL MOLINO is the ONLY non-white small scale.
Johan van den Berg Chair: Steering Committee
Portfolio Committee- Trade and Industry – 11 March 2015
Egypt’s Electricity Subsidy Removal and the Unified Electricity Law; Paving the Way for Renewables SME Growth.
Commission 2: Manufacturing S
Developing a Solar Roadmap Tapping every ray of the sun
PRESENTATION: Energy Consultative Meeting
PRESENTATION TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITEE ON ENERGY
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

Exploring solutions to challenges on financing and certification on locally produced renewable products Johan van den Berg Chair: Steering Committee South African Renewable Energy Council 31 August 2012

IN SUMMARY 1 SAREC fully supports the localisation drive and Green Economy Accord A concerted effort with a long term focus is required for success, with inputs from industry, government, the banking sector and the development agencies If we take the right steps now, the good results will be visible in 2-3 years and will stay with us for many years Skills development is an important, related subject but not discussed here due to the narrower topic of the day

STATUS QUO – LOCALISATION THRESHOLDS 2 Solar PV – Round 1 was 35%, round 2 was 40% (both reached), round 3 will be higher Solar Thermal with storage - Round 1 was 25%; round 2 was 25% round 3 will be higher 40%; Solar Thermal without storage was higher: 35%; 35% and then rising. So far thresholds were exceeded Wind – the local content thresholds for round 1 and 2 (25%) were achieved by civil works and balance of plant. Round 3 target will be higher and implies local towers/blades - not yet certain if this can be met (see below)

SOLAR PV: WHAT’S BEING DONE – STUDIES 3 SAPVIA together with DTI have commissioned a study into solar PV localisation and the study is under way The study will provide a road map towards optimal localisation for Solar PV

SOLAR THERMAL: WHAT’S BEING DONE – STUDIES 4 SASTELA have commissioned a study on localisation with DTI and GIZ that will commence within days The study will aim to create a road map towards optimal localisation in the Solar Thermal Industry – due mid- December Individual companies have started to investigate the local manufacturing of key components, including studies of international manufacturing plants

WIND: WHAT’S BEING DONE – STUDIES 5 SAWEA co-hosted with IDC a Localisation Indaba in June 2012 Discussion have taken place with IDC and DTI to identify blockages and find solutions A workshop followed by bilateral discussions between manufacturers and DTI was hosted in May 2012 SAWEA has engaged the Department of Science and Technology on a Localisation Road Map and supplied DST with a Terms of Reference for such a study An RFP from DST is expected

STATUS QUO – SESSA COLLABORATION WITH GOVERNMENT 6 SESSA in collaboration with the DST & CSIR is building a platform that would be able to monitor, measure and report on actual job creation, enterprise development and skills development growth in the RE sector. Simultaneously building relationships with municipalities to monitor, create and set standards for installations of varied RE technologies through selected accredited training institutions.

THE LONG TERM VISION REQUIRED ACROSS TECHNOLOGIES 7 The Green Economy Accord and IRP envision a large roll out of renewables to 2030 At the moment however, all that is certain is the Minister’s first determination of 3,725 MW’s - which will start to run out soon; IRP is revisited/adjusted every two years and a factory takes 6 or more years to pay off Minimum allocation to each technology is required to draw manufacturing plants to SA (say for 6 – 10 years into the future); This implies that the IRP should only be amended within certain bounds to unlock local manufacturing

Minimum thresholds for each technology to unlock manufacturing (definite annual procurement in MW’s, medium term) 8 Each renewable technology requires a minimum annual procurement for a number of years (medium term) to activate local manufacturing Suggesting exact figures may be premature and the answer is different for different technologies A collaborative investigation between government and industry will assist to refine these figures The various studies being undertaken now are likely to assist in finding these figures There has been a clear and rapid response by local manufacturing firms in investigating localisation potential based on the 3 725MW allocation This will stall if further medium term certainty is not provided

Certification and guarantees (1) - Project finance 9

Certification and guarantees (2) - Project finance 10 In project finance, the equity providers (developers) do not guarantee or sign surety to the bank for the very large loans (can be more than ZAR 1 billion); If the project does not perform, the bank must be able to sue someone who has the money to pay - or the public’s deposits at the banks might ultimately be jeopardised For this reason each piece of equipment must be certified and guaranteed by a financially strong company Certification of new equipment involves testing and takes time (eg 12 months or more for wind) Guarantee is essential – big balance sheet needed

Certification and guarantees (3) - Project finance 11 It is possible to provide other kinds of finance through development institutions (eg IDC) If no bank loans are used and developers are asked to provide everything themselves, there may not be enough money and the cost of renewable energy will go up, as this kind of money is more expensive than bank loans

Certification and guarantee issues - PV 12 PV industry is confident that local manufacturing of certain components can take place affordably in South Africa Currently 3 module assembly plants exist in South Africa with a capacity of approx 120MW/yr Several more plants for module assembly and inverter manufacture are under development but require clear procurement roll-out plan

Certification and guarantee issues – Solar Thermal 13 Steel, glass piping, tanks, construction materials, cement and cooling equipment can be sourced locally There is no local manufacturer of turbines and receiver tubes If a manufacturer came it would have to be international coming with certification and guarantees otherwise time and a balance sheet would be required Appropriate certification would allow local manufacturers to compete in the growing global market for CSP

Certification and guarantee issues – Wind 14 No local turbine manufacturer at commercial scale to buy from No certified and guaranteed local blade manufacturer to buy from One un-guaranteed, local turbine assembler and blade manufacturer closing its doors due to guarantee requirements of banks and the bid rules Certification will take about 12 – 18 months after erection of pilot plant – thus perhaps 2 years away If a certified and guaranteed intern. firm comes to SA, this shortens to the time required to complete the local factory

SOLUTIONS (1): CHANGE THE SCORING SYSTEM 15 At present the scoring is 70:30 for Price: Socio-economic Strong localisation success may save money even if prices rise a little – more employment, money stays in the country SAPVIA suggests for PV: scoring needs to be analysed per technology and per component. The actual number of jobs created for each component manufactured locally must be quantified and balanced against increased costs. Increased costs will lead to higher energy costs, less installed capacity (there is a limited budget available for government to procure) and fewer jobs through installation and operation – a balance is required

SOLUTIONS (2): Lure international manufacturing firms 16 Lure international firms with existing certifications and guarantees to SA This shortens the delay before A made technology will be bankable This requires clarity on the IRP and medium term procurement

SOLUTIONS (3): DEVELOP NON-RECOURSE FINANCE PACKAGES 17 IDC and DBSA can choose to apply project finance rules differently to serve a development objective So they can choose to “bank” unproven South African technology without certification or guarantees In time the certification issue will disappear and the companies may be able to provide some of the guarantees themselves

SOLUTIONS (4): Allow bids at varying levels of local content 18 If firms are allowed to submit two bids with two prices corresponding with two different localisation levels, it will be clear to government what localisation really costs Government could allocate bids at both levels and achieve the optimum, blended levels of price and local content In this manner the target is achieved at industry level not project level and projects can indirectly “help” each other Government could make an informed decision

SOLUTIONS (5): LOOK AT THE REGIONAL POTENTIAL 19 SA firms have a competitive advantage in Southern Africa, due to lower transportation costs The regional market will be bigger than the local market If we can access the regional market, the feasibility of local firms will be strengthened

SOLUTIONS (6): PROMOTE TRAINING AND R&D 20 Facilitate funding for Training, Research and Development in universities and businesses, specifically as part of the project Socio Economic Development spend in REIPPP This would create the intellectual component to SA’s emergence as a power in RE

SOLUTIONS (7): DISTRIBUTED SOLUTIONS 21 Mostly in PV but also in wind, facilitate the roll out of the smaller- scale distributed generation (own use and Net Metering). Smaller projects allow local companies to provide technology more easily and bolsters their track record and ability to provide guarantees (project finance not required)

SOLUTIONS (8): WORKSHOP THE WAY FORWARD 22 The present PPC initiative is exactly what is required Similar initiatives with all role players to unify “SA Inc”

A collaborative role division 23 Steps requiredGovRE IndustryIDC/DBSAAcademia IRP visibility√ Studies/localisation road maps √√√√ Reconsider scoring system REIPPP √√√? Lure international manufacturing firms √?√ Develop non- recourse finance packages √?√? Allow bids at varying levels of localisation √?√ Promote training and R&D √√√√ Promote self- generation and off- grid solutions √√√√ Look at the regional potential √√√√ Workshop the way forward √√√√

AN EMERGING GLOBAL PLAYER: SA’S POSSIBLE PLACE IN THE 2015 GLOBAL PECKING ORDER (PV AND WIND) 24

THANK YOU 25 Johan van den Berg Interim chair