DAPC Program Update Seminar December 6, 2011 DAPC R ULES U PDATE.

Slides:



Advertisements
Similar presentations
S.L Part 1, Section 3.(b) G.S. 150B-21.3A: PERIODIC REVIEW AND EXPIRATION OF EXISTING RULES.
Advertisements

DAPC Program Update Seminar December 7, 2010 DAPC R ULES U PDATE.
Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
Montana Safe Digging Law 2014 Joint Engineers Conference Thu - Nov :00am-11:30am.
Development of Guidance Documents Jennifer Scharpf, M. P. H
Chapter 56 Workgroup Orientation Session The Road to Chapter 60 June 30, 2007.
Breach of a Requirement of the Code Marisa Orbea New York 19 June 2012.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
Railroad Commission of Texas Pipeline Safety Division.
EP REVIEW OF INTERIM “POLICY ON POLICIES ”
Acceptable Means of Compliance & Alternative Means of Compliance Margit Markus Moossen Legal department 31 January 2013.
Thomas K. Fidler Deputy Secretary for Waste, Air and Radiation Management Department of Environmental Protection Commonwealth of Pennsylvania Proposed.
Regulatory Coordinator Training Guiding you through everything that’s new. Sponsored by the Virginia Department of Planning and Budget on 7/29/2011.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
California and Washington Copper Requirements Friction Materials Standards Institute June 4-6, 2011 Nelson Garcia Director, Federal and State Policy Motor.
Taking Action Before or After a Rulemaking or Bill is Proposed Warren Hoemann Senior Vice President – Industry Affairs American Trucking Associations.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Last Topic - Constitutions of United States and its silent Features Silent Features 1.Preamble 2. Introduction and Evolution 3. Sources 4. Significance.
UNIVERSITY GOVERNANCE: Where We’ve Been Where We Are Where We Need To Be.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
1 Asset Management Steering Committee Briefing on Senate Bill 408 (Access Management) August 2013 Harold Lasley, P.E. Access Management Program.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
VI. Developing a VSMP Program General Stormwater Training Workshop.
4. Regulatory Measures and Procedures 1. General measures Include regulations or administrative rules of general applicability aimed at implementing or.
Horizon West Village Planned Development Code Update Adoption Public Hearing Board of County Commissioners February 11, 2014 Chapter 38, Article XIII,
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
By Michelle Hoang Period 2 APES April 30, 2012 The Toxic Substances Control Act of 1976.
Voluntary Action Program Updates Certified Professional Training October 27, 2015.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Section 24 Pipeline Safety Standards Incorporated Into the Federal.
Administrative Rules 101 A Presentation for the 2013 New Board Member Orientation 1/8/2013.
Work Related to Senate Bill 2202 (effective January 1, 2001)
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Temporary Assistance for Needy Families Part 265: Data Collection and Reporting.
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education September 2010.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Overview of the Surface Mining and Reclamation Act and Designation Process County of San Luis Obispo Office of the County Counsel January 8, 2015.
Strengthening Erie County’s Ethics Law and Board of Ethics MARK C. POLONCARZ ERIE COUNTY EXECUTIVE.
1 Presented by David Thompson, TIA December 14, 2005 NFPA 1600 and Emergency Communications.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education Updated: June 2012.
Department of Environmental Quality
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
An Overview of the Small Business Advocacy Review Panel Process
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Industry Guidance on Part 21 Evaluation and Reporting
How does OHCA’s budget become
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Presentation on the Joint Standing Committee on Financial Management of Parliament 07 September 2016.
The Rulemaking Process
Changes to Exempt Categories
Department of Environmental Quality
CAIR Replacement Rule and Regional Haze
Groundwater and Waste Management Committee November 9, 2016
Updates to Expedited Review Procedures
Julie Woosley, Division of Waste Management
Department of Environmental Quality
IMPLEMENTATION OF THE SOUTH AFRICAN LANGUAGE PRACTITIONERS COUNCIL ACT, 2014 (Act No. 8 of 2014) PRESENTED TO THE SELECT COMMITTEE ON EDUCATION & RECREATION.
Julie Woosley, Division of Waste Management
Roles and Responsibilities
TRTR Briefing September 2013
Julie Woosley, Division of Waste Management
Periodic Review and Expiration of Existing Rules (G.S. 150B-21.3A)
Presentation transcript:

DAPC Program Update Seminar December 6, 2011 DAPC R ULES U PDATE

T ODAY ' S T OPICS  The Rule Process – an Overview  Senate Bill 2/Executive Order K  2011 – Year in Review  In the Hopper  SIP Conduit

T HE R ULE P ROCESS – AN O VERVIEW  Ohio Revised Code = Laws/Statutes  Ohio Administrative Code = Rules/Regulations DAPC Makes Rules! 469 Rules in Chapter 3745 of the Administrative Code

T HE R ULE P ROCESS – AN O VERVIEW  Two Paths – 5 year review and Non-5yr  5 Year Review  What is it? – ORC  Determine if rule is.... Necessary: Changes or No Change Unnecessary: Rescission  Must review whole rule. Make content changes, but also; Fix Typos, Admin Data, IBR’s, etc...  Non-5yr: typically just a content change

T HE R ULE P ROCESS – AN O VERVIEW  Typical Rule Schedule (180 – 255 Days)  Content Development – Prior to rule path  Draft Rule (IP) Comment Period  Proposal Period Public Hearing JCARR jurisdiction - 65 days Regular, 90 Days No-change  JCARR = Joint Committee on Agency Rule Review  JCARR jurisdiction includes JCARR hearing  No public hearing for no-change rules

T HE R ULE P ROCESS – AN O VERVIEW  Typical Rule Path – continued  Final File Package Package Review and Sign-off (15-30 days) Final file (can be done first day after JCARR jurisdiction is over) First possible effective date is 10 days after final filing  Revising (if necessary) If change necessary within the first 35 days of JCARR jurisdiction Does not lengthen timeframe  Refiling (if necessary) If change necessary after the first 35 days of JCARR jurisdiction Could lengthen timeframe considerably (30 day JCARR extension)  Also Emergency and No-Change

G UIDANCE D OCUMENTS  DAPC has developed many guidance documents  “Rule Generating and Processing Guidance”  “Rule Drafting and Formatting Guidance”  Rule package document templates  Additional outside guidance available  LSC Rule Drafting Manual  RAS/ERF Training Manuals

E XECUTIVE ORDER K  Became effective on January 10, 2011 and will remain effective even after the SB 2 CSI provisions apply  Created the Common Sense Initiative (CSI)  Under the EO, agencies are to “promote transparency, consistency, predictability, and flexibility in regulatory activities.”  The Executive Order directs agencies to continually evaluate regulations to ensure the regulatory objectives are being accomplished. Agencies are also instructed to “amend or rescind rules that are unnecessary, ineffective, contradictory, redundant, inefficient and needlessly burdensome, have a negative unintended consequence, or unnecessarily impede business growth.”

E XECUTIVE ORDER K  Rule Drafting  The Executive Order specifically calls for agencies to establish business regulations via rule-making procedures and to write rules, regulations, and related communication in plain English so that they may be easily understood.  Determining Impact on Small Business  The Executive Order further requires that, before filing a rule that economically impacts small business with JCARR, agencies must determine the rule’s real or potential impact on small business and comply with CSIO requirements for determining that impact.

E XECUTIVE ORDER K  Balancing Rule Objectives  The EO specifies that the objectives of rules should be properly balanced with the costs of compliance by regulated parties, and that the perspectives of small businesses should be considered as early as possible in the rulemaking process.  Agencies must respond to any recommendations for improved regulations issued by the Lieutenant Governor through the CSIO. Recommendations that are adopted should be identified, and an explanation should be provided for those recommendations the agency elects not to implement.

S ENATE B ILL 2  Subsequent to the issuance of the Executive Order, the Ohio Legislature enacted Amended Substitute Senate Bill 2 (SB2).  SB2 more broadly seeks to identify and limit adverse impacts on businesses regardless of size.  Although SB2 itself was effective beginning June 7, 2011, many provisions will not be effective until January 1,  SB2 codifies the creation of the CSIO, alters the procedure for promulgation of agency rules, and expands the jurisdiction of JCARR.  Under SB2, a rule that might have an adverse impact on business is subject to additional analysis by the agency proposing it, the CSIO, and JCARR.

C OMMON S ENSE I NITIATIVE O FFICE  Under SB2 the CSIO has three primary tasks:  the creation of a process for people to comment on a proposed or effective rule’s adverse impact on business,  the development of an instrument to be used to evaluate rules that may have an adverse impact on business, and  the evaluation of draft rules and transmission of recommendations to eliminate or reduce any adverse impact on business.

S ENATE B ILL 2  For purposes of these requirements, a rule has an adverse impact if it…  requires an authorization before engaging in or operating a business;  imposes a penalty or sanction (criminal or civil), or creates a cause of action for failure to comply; or  requires specific expenditures or the reporting of information as a condition of compliance.

JCARR P ROCESS  All processes will remain the same, except for the addition of the Business Impact Analysis being added to the original filing package on the ERF.  If JCARR finds that a rule should have a Business Impact Analysis and one has not been filed with the rule, then JCARR can reject the rule, and it is like the rule filing never happened. The agency will have to start again.  JCARR will be determining the balance between the rule objective and the adverse impacts, the added 6th prong.

2011 – Y EAR IN R EVIEW  New Rules  Greenhouse Gas Tailoring Rules – OAC Rules and  Notable Adoptions  OAC Chapter – 5yr Review, Removal of Limits for Permanently Closed Facilities  OAC Rule – Return of 240 Allowances to Affected Sources  OAC Chapter – Phase 3 VOC RACT; 3 new CTG Rules  Hundreds of Minor Changes due to 5-yr review of 7 Other Chapters

R ULE A CTIONS – 5 YR R EVIEWS

R ULE A CTIONS – N EW R ULES

T OTAL R ULE A CTIONS

C OMING U P IN 2012  5 Year review: Time to Reset, however.....  2011 was largest Year yet (300+ Rule Actions)  Still 3 Chapters that aren’t done from old cycle ( , , )  Rules in 9 Different Chapters, 50+ rules, set to start in is not going to be a slow rule year!

I N THE H OPPER – W HAT ARE WE WORKING ON AS OF 12/6/11  Asbestos Emission Control ( ): Public Hearing on January 9, 2012  PM Rule Fix ( ): Adopting minor rule change in Early December to make rule federally approvable  Small Business Assistance ( ): Public Hearing on January 9, 2012  Open Burning Rules ( ): Public Hearing in Mid January, 2012

SIP A PPROVALS IN 2011  OAC Rule : Approved 7/13/11, 76 FR 41086, Federally effective 8/12/11 – VOC RACT for Reinforced Plastic Composites Industry  OAC Rule : Approved 8/19/11, 76 FR 51091, Federally effective 9/19/11 – Photo Reactive Materials. Replaces 1999 version of the rule in the SIP.  Cincinnati Redesignation to Attainment for 1997 PM 2.5 Annual Standard: Approved 10/19/11, 76 FR 64825, Likely Federally Effective 12/19/11