QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO

Slides:



Advertisements
Similar presentations
AWARENESS OF ISO 9000 (2000) By C. Das Additional Director
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Environmental Management System (EMS)
Understanding the Requirements Qimpro Standards Organization
Draft BY QI organization June 2014
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Preparing for Quality System Certification
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition November 2008.
ISO 9001:2008: Key changes and transition process
4. Quality Management System (QMS)
4. Quality Management System (QMS)
An Overview of the International Quality Management Standard
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
Annex 1 – Changes in the detail
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
13th &14th July 2010 Gaelle Rousseau-Lamour
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Quality Management System
Quality Management Systems
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Occupational Health and Safety
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Quality Management System
Introduction to ISO 9001:2000.
Visit us at E mail: Tele:
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
QUALITY MANAGEMENT STATEMENT
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
QUALITY MANAGEMENT SYSTEM
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
Quality Management Quality management systems 6th March 2014.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
10 June 2016 | Proprietary and confidential information. © Mphasis 2013 Overview of ISO 9001:2008 Mar Internal Auditor Training.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
External Validation of Quality Programs
Quality Management Systems – Requirements
ISO 9000 Dr. S. Thomas Foster, Jr..
Operationalizing Export Certification and Regionalization Programmes
Medical Device Design and Development
ISO 9001:2000 Awareness & Implementation Course
How to conduct Effective Stage-1 Audit
ISO-9001:2000 Quality Management Systems
External Validation of Quality Programs
Presentation transcript:

QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO 9001-2000 Product Realization (II) by Dr. Anwar El-Tawil Director ISO Programme for Developing Countries

Customer-related processes Design & Development Customer-related processes Planning of Product Realization Control of measuring devices Design & Development Realization Purchasing

Design and development (7.3) Design review User requirements Design input Design process Design output Product Verification Validation

Design and development planning (7.3.1) The organization shall determine design and development stages review, verification and validation activities for each stage responsibilities and authorities for design and development The organization shall manage the interfaces between different groups involved in design and development! According to ISO 9004, the life cycle, safety, maintenability, dependability, durability, ergonomics, product disposal and identified risks should be taken into consideration

Design and development inputs (ISO 9004) Design and development inputs include: external inputs such as customer needs and expectations needs and expectations of other interested parties statutory requirements supplier’s contribution user input to achieve robust design international or national standards industry codes of practices

Design and development inputs (ISO 9004) (cont.) Internal inputs such as policies and objectives competence requirements technological developments feedback information from past experience records and data on existing products and processes outputs from other processes

Design and development inputs (ISO 9004) (cont.) Other inputs, such as operation, installation and application storage, handling and delivery physical parameters and the environment requirements for the disposal of products

Design and development inputs (ISO 9001 – 7.3.2) The organization shall define and document: functional and performance requirements regulatory requirements information derived from previous similar designs other essential requirements Inputs should be reviewed; incomplete, ambiguous and conflicting requirements shall be resolved

Design and development outputs (ISO 9001 – 7.3.3) E.g.: product specifications, requirements for training, methodology, purchasing and acceptance criteria Outputs shall: meet input requirements provide appropriate information for purchasing, production and service provision contain (or reference) product acceptance criteria specify the characteristics of the product essential for its safe and proper use Design and development documents shall be approved before they are made available

Design and development verification (7.3.5) Verification shall be performed to ensure that design and development outputs satisfy design and development input requirements Records of the results of the verification and any necessary actions shall be maintained Verification activities include, for example: comparative methods, such as alternative design and development calculations evaluation against similar products tests, simulations or trials to verify conformity to specific requirements

Design and development validation (7.3.6) Design and development validation shall be performed to ensure that the product is capable of fulfilling the requirements for the intended use Validation shall be completed prior to the delivery or implementation of the product whenever parcticable. Otherwise, partial validation should be performed Validation activities may include: validation of engineering designs prior to construction or installation validation of software outputs prior to installation validation of customer services prior to widespread introduction

Design and development review (7.3.4) Design review shall be conducted: to evaluate the ability to fulfill requirements to identify problems and propose solutions Participants in such reviews shall include representatives of design and development funcitons Results of the reviews shall be recorded According to ISO 9004, design and development review should also take into consideration: potential hazards or failure modes in product use potential impact of the product on the environment

Control of design and development changes (7.3.7) Design and development changes shall be identified and recorded The effect of changes on constituent parts and delivered product shall be evaluated Changes shall be reviewed, verified, validated and approved before implementation Records of the results of the review of changes shall be maintained

Customer-related processes Purchasing Customer-related processes Planning of Product Realization Control of measuring devices Design & Development Realization Purchasing

Purchasing (7.4) Purchasing processes shall be controlled to ensure conformity of purchased products Suppliers shall be evaluated and selected based on their ability to supply a product in accordance with requirements Criteria for selection, evaluation and reevaluation shall be established Results of evaluation and selection shall be recorded

Purchasing Processes (ISO 9004) Purchasing processes include Timely and accurate identification of needs and purchased product specifications Cost evaluation of purchased product (taking into account performance, price and delivery) Verification criteria Unique supplier processes Contract administration Warranty replacement for nonconforming purchased products Logistic requirements

Purchasing Processes (ISO 9004) (cont.) Product identification and traceability Preservation of product Documentation, including records Control of purchased product deviation form requirements Access to supplier’s premises Product delivery, installation or application history Supplier development Identification and mitigation of risks associated with the purchased product

Supplier Control Process (ISO 9004) The organization should establish processes to identify potential suppliers develop existing suppliers evaluate their ability to supply the required products

Supplier Control Processes (ISO 9004) (cont.) The supplier control processes includes evaluation of relevant experience review of purchased product quality, price, delivery performance and responses to problems audits of supplier’s QMS checking supplier references and customer satisfaction financial assessment of supplier viability supplier’s response to inquiries, quotations and tendering supplier service, installation and support capability supplier’s logistic capability including locations and resources

Purchasing Information (7.4.2) Purchasing information should include Requirements for apporval of product procedures processes equipment Requirements for qualification of personnel Requirements of supplier QMS

Verification of Purchased Product (7.4.3) The organization shall establish and implement inspection or other activities for verifying purchased product The level of verification can vary according to the nature of the product and previous performance of suppliers Where the organization or its customer intends to perform verification at the suppliers’s premises, verification arrangements shall be stated in purchasing information