On-Demand Architecture for Network-Critical Physical Infrastructure Large Data Centers Small & Medium Data Centers Computer Rooms & Closets David Blumanis.

Slides:



Advertisements
Similar presentations
Challenges in optimizing data center utilization
Advertisements

Presented by Paul Almond – Datacentre UK
Data Center Business Overview
Vblock™ Specialized Systems for Extreme Applications
On-Demand Architecture for Network-Critical Physical Infrastructure
Customer Presentation ThinkServer EMC VSPEX Private Cloud Solutions.
Course: e-Governance Project Lifecycle Day 1
G.E. UPS Productline.
MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis Premium Power for Colocation Telecom Power Infrastructure Analysis February 27,
Introduction to DISKLESS PC How to beat the high cost of computing.
1 Vladimir Knežević Microsoft Software d.o.o.. 80% Održavanje 80% Održavanje 20% New Cost Reduction Keep Business Up & Running End User Productivity End.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Introduction to Unitas Global Managed IT Infrastructure Service Provider February 2012 North America Los Angeles, USA
Achieving Data Center Availability along with Efficiency by Management Systems Shimon Katz, Data Center Project Manager ELECTRICITY 2012 – Eilat, Israel.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
InfraStruxure for Small IT Spaces Solution Introduction.
IBM Energy & Environment © 2008 IBM Corporation Energy Efficiency in the Data Centre … and beyond Peter Richardson UK Green Marketing Leader.
PowerPoint +Excel + Stocks = Project 2 Charlotte Anne Wray CGS 1060 Section 001 Lab Section 0024 Instructor Manish Billa.
Citrix Partner Update The Citrix Delivery Centre.
Integrated Power, Cooling, and Rack Infrastructure for Critical Networks Increase Availability While Decreasing Your Total Cost of Ownership (TCO) REV.
Whiteboard Message for Cloud Computing Answering End user questions in 5 minutes with a white board 1.What is Cloud Computing? 2.How does Cloud computing.
Cloud Computing Economics Ville Volanen
Executive Overview. PLEASE READ (hidden slide) To deliver this presentation effectively, you need to be familiar with Windows Server 2008 R2 management.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
All content in this presentation is protected – © 2010 American Power Conversion Corporation InfraStruxure ™ Management Software Eduard Bodor Senior System.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
All content in this presentation is protected – © 2009 APC by Schneider Electric Core | High Density | Rev 0 Build a Better Data Center with APC and Cisco.
Travis, Stephanie, Alex.  Cloud computing is a general term for anything that involves delivering hosted services over the Internet.  These services.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
The Texwrap Difference It's the extra value that's built into every product. It's the ultimate in ease-of-use, reliability and longevity. Every Texwrap.
Selling Consolidation’s Value. Why Consolidate? Reduce Complexity Increase Productivity Reduce TCO Improve End User Experience Improve IT Performance.
1.Training and education 2.Consulting 3.Travel 4.Hardware 5.Software Which of the following is not included in a firm’s IT infrastructure investments?
Data Center Consolidation & Energy Efficiency in Federal Facilities
Motorola Mobility Services Platform
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Product Manager, Windows Client Robert Geller. Need to differentiate from competitors Customer complexity driving cost Need new growth strategies Difficult.
APC InfraStruxure TM Central Smart Plug-In for HP Operations Manager Manage Power, Cooling, Security, Environment, Rack Access and Physical Layer Infrastructure.
Virtualization is only half the battle for efficiency in Data Centers Eduard Bodor System Engineer Romania & Bulgaria.
Energy Usage in Cloud Part2 Salih Safa BACANLI. Cooling Virtualization Energy Proportional System Conclusion.
Building the Infrastructure Grid: Architecture, Design & Deployment Logan McLeod – Database Technology Strategist.
Role of Infrastructure In Enhancing Business Continuity in Banks Tarun Makhija APC.
1 High Density Data Center Assessments. 2 Agenda About APC & what is APC’s value proposition to Cisco? Why are Cisco and APC data center services teams.
LAN Switching and Wireless – Chapter 1
AT & T Cisco Corp. Mitsubishi Electric Time Warner Corp. Boeing Corp. Sprint Communications Hexal AG Deloitte & Touche Cap Gemini Goodyear Walt Disney.
Most organization’s data centers that were designed before 2000 were we built based on technologies did not exist or were not commonplace such as: >Blade.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Hosted by New Frontiers in Network and System Management Jean-Pierre Garbani Research Director Computing Systems Forrester Research, Inc.
Component 8/Unit 9aHealth IT Workforce Curriculum Version 1.0 Fall Installation and Maintenance of Health IT Systems Unit 9a Creating Fault Tolerant.
CLOUD COMPUTING WHAT IS CLOUD COMPUTING?  Cloud Computing, also known as ‘on-demand computing’, is a kind of Internet-based computing,
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
Submitted to :- Neeraj Raheja Submitted by :- Ghelib A. Shuaib (Asst. Professor) Roll No : Class :- M.Tech(CSE) 2 nd Year.
© 2012 Eucalyptus Systems, Inc. Cloud Computing Introduction Eucalyptus Education Services 2.
1 Implementing a Virtualized Dynamic Data Center Solution Jim Sweeney, Principal Solutions Architect, GTSI.
Infrastructure Deployment Services Dell Networking Deployment Services.
Setting up the Zeroth level of a Computational Grid Vincenzo Spagnoletti District Manager
Designing Cisco Data Center Unified Fabric
Data Center Business Overview
Delivering on the Promise of a Virtualized Dynamic Data Center
Avenues International Inc.
Prefabricated power solutions Fast deploying, pre-tested systems that lower total cost of ownership March 2015 sales trainings.
IOT Critical Impact on DC Design
Cloud vs. On-premise 5 Advantages of Cloud Deployment
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Data Center Cooling Market.
Data Center Business Overview
The Brocade Cloud Manageability Vision
Modular Edge-connected data centers
Azure Supports L7 Networking and Security Solutions to Optimize, Secure Web Applications “Microsoft Azure has enabled A10 Networks to offer virtual Application.
Modular Edge-connected data centers
Modular Edge-connected data centers
Presentation transcript:

On-Demand Architecture for Network-Critical Physical Infrastructure Large Data Centers Small & Medium Data Centers Computer Rooms & Closets David Blumanis APC, Data Centre Consultant, Asia Pacific

© 2003 APC corporation. Network-Critical Physical Infrastructure (NCPI) Essential foundation of reliability

© 2003 APC corporation. You have a large NCPI investment Cooling Equipment: 6% Power Equipment: 17% Racks: 3% Engineering & Installation: 19% Space: 17% Electricity: 27% Service: 13% Typical 10 yr lifecycle TCO from $80K to $140K per rack Source: APC White Paper #6

© 2003 APC corporation. Network-Critical Physical Infrastructure Challenges  Rapid changes in IT technology  High density  High operating/service costs  Increasing availability expectations  Server consolidation  Regulatory requirements In response, APC is changing the way the world designs, installs, operates, manages and maintains Network- Critical Physical Infrastructure (NCPI)

© 2003 APC corporation. The Business Value Equation for Network- Critical Physical Infrastructure Availability Agility TCO Value x = What are the barriers to improving value by 10x?

© 2003 APC corporation. 10 X Availability Agility TCO Value x =  Equipment Reliability  Mean-Time-To-Recover  Human Error Your entitlement: Reduce downtime by 90% 80% less 50% less

© 2003 APC corporation. Case Study of Downtime Failures Consistent with Surveys which attribute 60% or more of failures to Human Error

© 2003 APC corporation. Standardisation enables improved availability  Modularise  Pre-test systems in the factory  Hot swappable  Pre-Integrate Power- Cooling-Rack Management & diagnostics  One-Time Engineering  Unique training requirements  On-site assembly  On-site testing  Custom programming StandardiseTo Eliminate Standardisation accelerates learning at all levels, reducing human error and increasing availability

© 2003 APC corporation. Availability TCO Value x =  Speed of Deployment  Ability to Scale  Ability to Reconfigure Your entitlement: As much as 10 x the agility 100% easier 80% less time 100% easier 10 X Agility

© 2003 APC corporation. Traditional Approach (200 days) Design Concept Construction Design Construction Commissioning Operation Custom Parts, Applications and Services “I need more capacity.” “I have more capacity.” Needs Assessment

© 2003 APC corporation. Data Centre traditional design

© 2003 APC corporation.  The Design Concept is built on standardised parts that can be scaled to meet the need?  Construction Design incorporates a “Lego Block” approach of pre-engineered components?  Construction is mainly done in a factory instead of on-site?  Commissioning tests pre-integrated infrastructure systems. What if……

© 2003 APC corporation. 20% less Availability Agility TCO Value x =  Capital Cost  Electricity Costs  Service Costs Your entitlement: As much 20% overall NCPI TCO 10% less 30% less

© 2003 APC corporation. Waste due to oversizing Reference: APC White paper #37

© 2003 APC corporation. The Business Value Equation for Network- Critical Physical Infrastructure Availability Agility TCO Value x =