The NASA Ames PhoneSat Project Mike Safyan DCC 2011, Baltimore 9/16/11.

Slides:



Advertisements
Similar presentations
1 CAN WE TURN A PHONE IN TO A SATELLITE? Android Open 2011San Francisco,10th Oct
Advertisements

AMSAT-NA FOX Satellite Program Review, Status, and Future JERRY BUXTON, NØJY AMSAT VP-ENGINEERING.
LightSail.
Amateur Radio on the International Space Station (ARISS)
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
Team: Jessica Avitia Mary Begay Daniella Eriksson Bryce Fox Mentors: Jack Crabtree Dr. Ronald Madler ASGC Symposium 4/18/2009ASGC Symposium.
Michael Segalla and Cole Skinker Advisor: Bob Bruninga AIAA YPSE Conference November 7, 2014.
Watch the following video and answer the questions on your question sheet. Importance of Testing.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
CASTOR Jr. MIT 2LT Corey Crowell 2LT Matt McCormack Lucas de la Garza Spenser Parra.
1 May 18, 2007Team # 7103: METEOR Instrumentation Platform M.E.T.E.O.R. Instrumentation Platform Matt Lipschutz Rashmi Shah Adam Gutterman Jessica.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
EEE440 Modern Communication Systems Satellite Systems.
Icarus Student Satellite Project Hannah Goldberg Dr. Brian Gilchrist BT Cesul Student Space System Fabrication Lab (S 3 FL) University of Michigan, College.
1 SHOT II Communication System Experiment University of Minnesota Max Schadegg, Cole Christensen, Ian Macmillen, Steve Haviland June 10 th, 2010 University.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
1 November 10, 2006Team # 7103 M.E.T.E.O.R. Instrumentation Platform Sponsor: Harris Corporation Matt Lipschutz Rashmi Shah Adam Gutterman Jessica.
Icarus Student Satellite Project
Improving the Reliability of GPS Tracking Beacons Clayton Jacobs Mentor: Jack Crabtree.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Aerosonde User’s Workshop Wallops Aerosonde UAV Facility Mission Proposing And Costing Factors Chuck Williams.
University at Buffalo GLADOS SHOT II Balloon Payload Presentation June 29, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Tony Monteiro, AA2TX VP, Engineering AMSAT Forum Dayton Hamvention 2011 AMSAT FOX.
Dr. Jennifer Rochlis. Overview Build a technology testbed for future rover concepts Develop and demonstrate operations and mission concepts.
May06-17 – StratoLink Spacecraft Bus Design Review StratoLink Spacecraft Bus Senior Design Project May06-17 Adam Allison Robert Bond Hai Duong Alan Johnson.
High Altitude Scientific Ballooning (Near Space Engineering)
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
Page 1 of 35 Achieving Over-The-Horizon Requirements Using Low Earth Orbit Satellites (LEOS) Presented by Eric Saikin.
By P.Pranavi Beyond Night Sky. 1957TILL DATE Beyond Night Sky.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
1 University of Maryland DYMAFLEX SHOT II Pre-Flight Presentation June 29, 2012.
ESA’s GSTB Programme GSTB-V1 is a ground system to test Galileo’s key algorithms using GPS data GSTB-V2 consists of a pair of satellites: –GSTB-V2/A (SSTL)
Boston University Daniel TaylorNima Badizadegan R. Terry BlackPantelis Thomadis.
REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2519S02 FOR
Communication, Navigation, and Networking reConfigurable Testbed (CoNNeCT): An International Space Station National Lab Ann P. Over Project Manager NASA.
NASA Operational Simulator for Small Satellites (NOS 3 ) NASA IV&V Independent Test Capability (ITC) Team Mr. Scott Zemerick
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
1 SOARS Matt Edwards Arseny Dolgov John Shelton Johnny Jannetto Galina Dvorkina Nick Driver Eric Kohut Kevin Eberhart Self Organizing Aerial Reconnaissance.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester.
University at Buffalo GLADOS SHOT II Balloon Launch Results Presentation July 1, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
EagleSat-1 Continuing Embry-Riddle’s CubeSat Satellite Development Program
Tracking Ground Station Progress and Future Work
Lecture 1: Getting Ready
QIKcom-2 re-configurable Transponder module
Simulation-to-Flight 1 Additional Resources:
USNA Next Generation Ground Station
The Koehler Sounding Rocket Launched Carrying Interesting Student-Developed Payloads The sixth flight of a RockSat-X education payload launched on a suborbital.
Space Express Sub-Orbital Mission
PROJECT METEOR: RITSAT1 P08102
Hardware Systems Review
Michael Fusco AZ / NASA Space Grant Scholar
AMSAT Engineering Program
HA1L High Altitude 1U Laboratory
HA1L High Altitude 1U Laboratory
EagleSat-1 Project: Mission Synopsis
Technician Licensing Class
CubeSat vs. Science Instrument Complexity
Mark Suder
Steve Alvarado Max Bezold Alex Clements Mary Fralick Jason Rexroat
Sub-Orbital CubeSat Experimental Mission
The FUNcube Project – the background
Charles Sommer October 21st, 2019
Presentation transcript:

The NASA Ames PhoneSat Project Mike Safyan DCC 2011, Baltimore 9/16/11

Why use a phone? Increase on-orbit processor capability by a factor of Decrease cost by a factor of Free up cubesat volume for additional payload through avionics miniaturization Demonstrate COTS approaches to all subsystems (power, attitude determination, comms)  Produce high-capability spacecraft for $1-10k

Nexus One Android OS 1 GHz Processor 500 MB RAM 16GB Data Storage 3-axis accelerometer, 3-axis magnetometer 5MP Camera/VGA Video Camera GSM, WiFi, Bluetooth, FM radio GPS (restricted)

Environmental Testing 1.Thermal-Vac testing to 10-5 Torr, -35C to +40C 2.Suborbital Rocket Testing to 10,000m readiness 3.Launch vibe and shock to NASA GEVS standards 4.Balloon flights for system level qualification (30km altitude)

PhoneSat 1.0: Requirements 1.Work for > 1 orbit 2.Send minimum health data and 1 image taken by the phone to the ground 3.Parts cost << $10,000, leading towards $1,000 unit cost 4.Schedule < 3 months from ATP to flight readiness

Phone (Nexus One) Core UHF Radio 440 MHz Likely Core Extra Battery Bank (12 x V cells, 2800 mAh) Legend Monopole Antenna RBF and Deploy. Switches (Custom PCB) Spacecraft 1.0 Concept A With UHF radio & Hardware battery override & Watchdog/Lazerus Watchdog/ Lazerus (Arduino) Power Data PhoneSat 1.0: System Architecture

Radio Range Tests

Balloon Flights

Balloon Flight Motivation Analog to space, no ITAR restrictions, low-cost Useful radio tests – Long distance, simulate tumbling – Clean RF environment Operationally similar to orbital flight – Organizing the team, getting flight experience – Ok to fail Useful software tests Deadlines help get things done!

Balloon Procedure In-lab dress rehearsal 1-3 days before Launch site selection and flight path prediction using Flight tracking using separate APRS beacon* and Recovery *requires licensed amateur radio operator

Balloon Launch #1, February 2011 Key results: received several packets from the UHF beacon phone took 98 images during flight gained balloon launching and operations experience Key issues identified: had a power failure in mid-flight post-flight analysis revealed loose wire connection was the cause discovered software bugs

Balloon Pic

Balloon Launch #2, March 2011 Key results: progress in software since last balloon flight received several packets from the UHF beacon Key issues identified: mid-flight failure extreme low temperature caused by air convection thought to be the cause

Balloon Launch #3, June 2011 Key results: continuous operation for the duration of the flight consistently decoded packets at an equivalent attenuation of a 500km circular orbit between 25 and 45 degree elevation pass met all requirements for flight Key issues identified: Image packetization scheme needs tweaking

PhoneSat 1.0: Major Challenges Addressed Software: – Getting access to low level functionality – Emulating stock battery to allow boot-up without one Hardware – Clean power supply to the radio – proper antenna design/tuning – Wiring and connector reliability

Image Downlink Challenge Get a “desktop sized” image to the ground 640x480 rgb24 = 200,000 bytes 200 byte AX.25 packet transmissions 1-week of battery, approx. 10,000 transmissions Every 5 th transmission is a health packet Reach out to HAM operators and volunteer organizations… …but not all stations are automated and ½ of them are sleeping And 2/3 of the world is ocean And no way to command which packets to downlink

Autonomous Vehicle Control System (AVCS) Software Release Approved July 2011 (8 months of paperwork) Apache 2.0, instead of NASA Open Source Agreement (NOSA) Git hub release end August 2011 Hope is to stimulate an open source toolkit for satellites Get the hacker community involved in space

Conclusions Produce a highly capable spacecraft for <$10k using only COTS hardware Series of ground tests and orbital missions to iteratively build capability Work with what you have Release early, release often Don’t be afraid to take risks Next steps: final environmental testing for PhoneSat v1 and begin outreach campaign

Questions? Contact:

PhoneSat 2.0 +New phone +2 way communications +Solar cells +Magnetorquers (coarse pointing) +Reaction Wheels (fine pointing)