March 14, 2005Chair, IEEE 802.20 802.20 Opening March 2005 Plenary Session #13 Jerry Upton- Chair Gang Wu – Procedural Vice Chair.

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
IEEE / January Interim Joint Opening Session #6 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli.
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /864r0 Submission November 2003 Clint Chaplin, Symbol TechnologiesSlide 1 SG Operating Rules Anybody can vote, present, and make motions.
July18, 2005Chair, IEEE Opening July 2005 Plenary Session #15 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar.
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Jan. 16, 2006 C /09Chair, IEEE Opening January 2006 Interim Session #18 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE b TG4b September 2005 Robert Poor - NBT GRoupSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0755r1 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
C /27 May 15, 2006Chair, IEEE Opening May 2006 Plenary Session #20 Jerry Upton- Chair Doug Knisely – Procedural.
session8_opening_notes.ppt Submission May 2005 Ajay Rajkumar, Chair, Slide 1 IEEE Session #8 Opening Session Ajay Rajkumar.
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /0849r0 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 1 WNG SC Committee Report IEEE , Albuquerque,
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /1149r4 Submission November 2004 Donald Eastlake 3 rd, MotorolaSlide 1 IEEE s: ESS Mesh Networking Task Group San Antonio, Texas.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
September 13, 2004Chair, IEEE Joint Opening September 2004 Interim Session #10 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1149r0 Submission November 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Chair’s Opening Report Notice: This document has been.
Doc.: IEEE /0755r0 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
July 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE / Submission Publicity Committee /.15.
Doc.: IEEE /024r1 Submission Jan 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Vancouver, Canada, Jan 12-16, 2004.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
IEEE s: ESS Mesh Networking Task Group
Siemens, Roke Manor (Recording Secretary )
Opening March 2005 Plenary Session #13
Siemens, Roke Manor (Recording Secretary )
IEEE 802 Handoff ECSG Chair’s Introduction
IEEE s: ESS Mesh Networking Task Group
11k Seattle 3 Agendas Date: Authors: September 2005
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
Instructions for the WG Chair
IEEE s: ESS Mesh Networking Task Group
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
Opening May 2005 Interim Session #14
ADS Study Group Agenda Date: Authors: January 2005
APF Study Group Agenda September 13, 2004 September 2004
WAVE Opening Report September /1068 r0
Siemens, Roke Manor (Recording Secretary )
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
Siemens, Roke Manor (Recording Secretary )
doc.: IEEE /479r0 Mika Kasslin TGh chair
IEEE r: Fast BSS Transition TG Agenda
Submission Title: [WG-TG3b Meeting Report Sept04]
Siemens, Roke Manor (Recording Secretary )
802.11p WAVE Opening and Agenda November p
TGu Ad Hoc Agenda Date: Authors: April 2007 April 2007
Opening Sept Interim Session #16
Siemens, Roke Manor (Recording Secretary )
IEEE ESS Mesh Study Group
IEEE r: Fast BSS Transition TG Agenda
IEEE r: Fast BSS Transition TG Agenda
IEEE IPR Policy Date: Authors: March 2006 March 2006
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
Presentation transcript:

March 14, 2005Chair, IEEE Opening March 2005 Plenary Session #13 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice Chair Rao Yallapragada – Recording Secretary /02

March 14, 2005Chair, IEEE Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. IEEE-SA Standards Board Bylaws on Patents in Standards Approved by IEEE-SA Standards Board – December 2002

March 14, 2005Chair, IEEE Copyright Under the current US copyright law — the author of information is deemed to own the copyright from the moment of creation The IEEE Bylaws require copyright of all material to be held by the IEEE –Must consult with IEEE for re-use of copyright material The IEEE Standards accomplishes transfer of copyright ownership through the Project Authorization Request (PAR) process

March 14, 2005Chair, IEEE Inappropriate Topics for IEEE WG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002

March 14, 2005Chair, IEEE No Electronic sign-in - - Manual Sign In Books has 14 meeting slots you need to participate in 11 meeting slots to get participation credit. Attendees shall state their Affiliation in the manual sign in book per Appendix B of the Version 1.0 Policies & Procedures ( PD-05).This is a requirement for obtaining a voting token and Grant Reciprocal Maintenance Attendance Credit in addition to.18 &.19, please state your home group when signing in Local website: Meeting Room - - Regency VI – Atrium Tower Ballroom Level Logistics

March 14, 2005Chair, IEEE Attendance Sign In and Affiliation Statement You must complete all information requested, sign and date. You only need to complete form once and then initial time slots.

March 14, 2005Chair, IEEE APPENDIX B IEEE WG Policies and Procedures V1.0 Affiliation Statements Per ANSI essential requirements, if there is a requested from an interested party for identification of affiliation it shall be granted. The ANSI rules apply since IEEE 802 does not have any exception speaking to this issue. Per the Chair of IEEE 802 and the Standards Association Board counsel, this procedure will be followed unless there is no request from an interested party. Procedure: 1. All attendees shall state their affiliation using a manual sign in book provided at each Plenary and Interim Session. If the automated/electronic attendance system is updated for the appropriate record field and instructions, the attendees shall use that system. 2. If an attendee is unable to comply with this procedure, the attendee shall notify the WG Chair. 3. Each attendee shall refer to the below ANSI Essential Requirements statement and use the below for guidance in complying with this procedure. Affiliation and ANSI Essential Requirements On the Web at: Activities/American National Standards/Procedures, Guides, and Forms/ER2003.doc “2.1 Openness Timely and adequate notice of any action to create, revise, reaffirm, or withdraw a standard, and the establishment of a new consensus body shall be provided to all known directly and materially affected interests. Notice should include a clear and meaningful description of the proposed activity and shall identify a readily available source of information. In addition, the name, affiliation [2] and interest category of each member of the consensus body shall be made available to interested parties upon request.” “[2] “Affiliation” refers to the entity that the consensus body member represents (which may or may not be that person’s employer). If the consensus body member is serving in an individual capacity, then the name of the individual, that person’s employer, sponsor and interest category should be available. Contact information is not required.”

March 14, 2005Chair, IEEE Objectives for the Session 1.Primary Objective is Closure of Evaluation Criteria, Traffic Models,and Channel Models Documents 2. Consensus on Technology Selection Process

March 14, 2005Chair, IEEE

March 14, 2005Chair, IEEE Proposed Detailed Meeting Agenda as Approved 3/14

March 14, 2005Chair, IEEE Process for this meeting: 1.Review Status of the Document A.Evaluation Criteria Version 14r1- tracking changes B.Channel Models Version 8, if not update then Ver. 7 2.Take New Contributions related to the Document 3.Review each Section of the Document - - reach consensus and approval - - refer to previous Contributions relevant to the section, alert the Chair/Editor if previous Contribution not closed 4.Seek drafting Ad-Hocs if needed 5.Sections with Options will be voted via Straw Polls and then Motions…”July Voting”..move forward. 6.Sections need 75% approval. Overall Document needs 75% approval. 7.Use this process for Evaluation Criteria and Channel Models Documents Closure Process

March 14, 2005Chair, IEEE Next Meetings – May Interim - - Cairns, Australia for May , 2005 Link is now up and available for May Interim session in Cairns, Australia for May , Please go to We are in a state of the art convention facility in Cairns and spread out over several nearby hotels for accommodations. Hotel information and distances are on the sign-up page. There is also included information on tour packages for the Great Barrier Reef. Please be sure to read and understand the cancellation policy as it is a little different than US meetings. It is also important you register before April 4 to get the early bird rate. You will be reminded frequently. During the month of April the rate will be US$150 additional and during May and on site it will be US$300 more! Book now before you forget and get the US$500 early bird rate. July Plenary - - July in San Francisco September Interim - - Sept in Orange Co. CA November Plenary - - Nov in Vancouver Canada January Interim - - Jan in Hawaii Inputs needed for May/Sept Interim outside US: Instanbul______ China______ Seoul______ Other Europe TBD______