1 Jawhar Sircar Additional Secretary & Development Commissioner Ministry of Micro, Small & Medium Enterprises Government of India NMCP SCHEMES Micro, Small & Medium Enterprises (MSME) 09 May 2008 MEETING OF DIRECTORS OF MSME DIs New Delhi
2 Marketing Support/Assistance to MSMEs BAR CODE Support for Entrepreneurial and Managerial Dev INCUBATORS Enabling Manufacturing Sector to be competitive thru Quality Mgt. Standard & Quality Tech. Tools QMS/QTT National Campaign for Investment in Intellectual PropertyIPR National Programme on Application on Lean Mnf. LEAN Mini Tool Rooms proposed to be set up by Min. of MSME MTR Promotion of ICT in Indian Manufacturing Sector ICT Technology & Quality Upgradation Support TECH UP Design Clinic Scheme for design expertise to Mnf. sector DESIGN Marketing Assistance/SMEs and Technology Upgradation Activities - Ministry of SSI in co-operation with TIFAC/CSIR MARKETING NATIONAL MANUFACTURING COMPETITIVENESS PROGRAMME - COMPONENTS Full Name of the Scheme Short Name
3 NMCP – New Activities (Over next 4 years) No Name of the Component 4 years GOI Share (BE) Total Project Cost GOI Share 1 BAR CODE INCUBATORS QMS / QTT IPR LEAN MTR ICT TECH UP DESIGN MARKETING TOTAL Rs. Crore
4 STATUS OF NMCP SCHEMES S. No. Name of Scheme (Cost of Scheme / Rs Cr.) EFCClearanceRE BE i Bar Coding (1. 5) Operational from 01/6/ ii Incubators (79.45) iii QMS / QTT (50) iv IPR (55) v Lean (280.80) vi MTR (210) vii ICT (100) viii TECH UP (93.50) ix Design (50) x C Watch (53) Total Rs. in Crore
5 Existing MDA Scheme modified to popularize Bar Coding Existing MDA Scheme modified to popularize Bar Coding Bar Coding an effective Tool to improve marketability Bar Coding an effective Tool to improve marketability Reimbursement allowed : Reimbursement allowed : One Time Registration Fee 75% of Annual Fee for 1 st 3 years (Bar Code Certificate) 1400 SMEs to be Benefitted during 11th FY Plan 1400 SMEs to be Benefitted during 11th FY Plan Need to Ramp-up Scheme Need to Ramp-up Scheme In the Context of Retail Boom / Exports Guidelines on Guidelines on 1. BAR CODE
6 Object : Object : Assist Incubation of Innovative Ideas Encourage Ideas to Become SMEs Total Project cost – Rs cr Total Project cost – Rs cr GOI Share – Rs cr BE – Rs cr Final Approval Awaited Final Approval Awaited Guidelines on Forms under Issue Rs. 80 cr Project for 100 Business Incubators (BIs) Rs. 80 cr Project for 100 Business Incubators (BIs) 2. INCUBATORS (E & MD) 1 / 2
7 100 BIs to be Located in R&D 25 p.a 100 BIs to be Located in R&D 25 p.a Govt. Grant (Max. 85%) = Rs. 4 to 8 lakhs per Idea Govt. Grant (Max. 85%) = Rs. 4 to 8 lakhs per Idea Each BI to Assist 10 Ideas / Units Each BI to Assist 10 Ideas / Units R&D Institutions and BIs to Suggest & Nurture R&D Institutions and BIs to Suggest & Nurture Can also be Dovetailed with other Schemes Can also be Dovetailed with other Schemes Tie Up ‘Successes’ with VC / Angel Funds Tie Up ‘Successes’ with VC / Angel Funds Publicity & Proposals Essential for Success Publicity & Proposals Essential for Success 2. INCUBATORS (E & MD) 2 / 2
8 10 Major Tool Rooms set up - German, Dutch, etc. 10 Major Tool Rooms set up - German, Dutch, etc. They are essential for MSMEs for Tools & Industrial Trng. They are essential for MSMEs for Tools & Industrial Trng. Tooling & Training Needs of MSMEs rising rapidly Tooling & Training Needs of MSMEs rising rapidly As Govt. Funding is Limited, PPP is Emphasised Total Project cost – Rs cr. Total Project cost – Rs cr. GOI Share – Rs cr. BE – Rs cr. EFC and FM have Cleared. CCEA Note with CAB SECT EFC and FM have Cleared. CCEA Note with CAB SECT ILFS appointed Transactional Advisor ILFS appointed Transactional Advisor Guidelines by early June 3. MINI TOOL ROOMS ON PPP MODE 1 / 2
9 MTR cost may range from Rs. 2 cr. to Rs. 25 cr. MTR cost may range from Rs. 2 cr. to Rs. 25 cr. Govt’s 40% maximum Expected Govt. Funding = Rs. 135 cr. Expected Govt. Funding = Rs. 135 cr. Total Cost of Projects : Rs. 350 cr. in 4 years To be Managed by Private Partners only To be Managed by Private Partners only Local Industry to gain from Services / Skills Local Industry to gain from Services / Skills Traditional Centre-State Option also open Traditional Centre-State Option also open GoI - Rs. 9 cr. and State - 6 cr. Another Option Another Option GoI – Rs. 9 cr. and State + Pvt. (Rs. 6 cr.) 3. MINI TOOL ROOMS ON PPP MODE 2 / 2
10 IPR Tools Trade Secret Indl. Design G.I. IPR Tools Trade Secret Indl. Design G.I. Patents Copyrights Trademark Patents Copyrights Trademark Most MSMEs unaware of IPR Benefits / Norms Most MSMEs unaware of IPR Benefits / Norms Total Project cost – Rs cr. (GoI = Rs cr.) Total Project cost – Rs cr. (GoI = Rs cr.) BE – Rs cr. EFC has Cleared. Details Thrashed with Stakeholders EFC has Cleared. Details Thrashed with Stakeholders Scheme Ready. Guidelines Awaiting Approval Scheme Ready. Guidelines Awaiting Approval 7 FOCUSSED ACTIVITIES : 7 FOCUSSED ACTIVITIES : Immediate Publicity Required 4. IPR CAMPAIGN 1 / 3
11 1) 150 Awareness & Sensitization Programmes Rs. 1 lakh per Programme, by Assn etc. = Rs. 1.5 cr. 2) 30 Pilot Studies with Assns./Clusters = Rs. 75 Lakh Rs. 2.5 lakh each for Diagnosis & Actions 3) 50 Interactive Seminars / Workshops To Discuss Study Reports and Implementation Rs. 2 lakh = Rs. 1 cr. 4) Short / Long Term Training of IPR Cadre for MSMEs 50 ST (2-3 weeks) and 10 LT (6 months) Rs. 6 lakh (ST) and Rs. 45 lakh (LT) = Rs. 7.5 cr. 4. IPR CAMPAIGN 2 / 3
12 5) 40 IP Facilitation Centres by SPV on PPP For Handholding SMEs in IPR, on Low Fees Rs. 65 lakh = Rs. 26 cr. 6) Financial Assistance for Patents and GIs (Rs. 10 cr.) Rs. 25,000 for Domestic, Rs. 2 lakh for Int’l GI Regn. – Rs. 1 lakh per case 7) Activities with International Agencies (Rs. 2 cr.) Best Practices, Capacity Building, Exchanges 25 nos. Rs. 5 lakh / 10 Rs. 7.5 lakh 8) Miscellaneous and Contingency (Rs cr) 4. IPR CAMPAIGN 3 / 3
13 MSME’s ISO Reimbursement Scheme Successful MSME’s ISO Reimbursement Scheme Successful QMS: ISO (Food), ISO (Health) etc. QMS: ISO (Food), ISO (Health) etc. QTT: Introduce proven Tools like 6-Sigma, 5-S, Kaizen, TPM, TQM etc. QTT: Introduce proven Tools like 6-Sigma, 5-S, Kaizen, TPM, TQM etc. Total Project cost – Rs cr (GoI = 80%) Total Project cost – Rs cr (GoI = 80%) BE – Rs cr Scheme Ready. Guidelines Awaiting Approval Scheme Ready. Guidelines Awaiting Approval 5. QUALITY MGT. SYSTEMS / TOOLS ( QMS / QTT ) 1 / 3
14 5 Activities to Further Propagate Quality Mgt: 5 Activities to Further Propagate Quality Mgt: 1) Compulsory Courses in ITIs / Polytechnics QCI/NPC to prepare Course Curricula 1800 ITIs / Rs cr p.a = Rs. 17 cr 2) Assist International Study Missions For Detailed Study of Best QM Institutions 2 missions / Rs. 1 cr p.a = Rs. 4 cr 3) Special Programmes for Threatened Products Detailed Analysis of Selected Imports Leading to Improved Indian Products 2 Sectors / Rs. 0.6 cr p.a = Rs. 4 cr 5. QUALITY MGT. SYSTEMS / TOOLS ( QMS / QTT ) 2 / 3
15 4) Implement Quality Mgt Techniques in Clusters 400 Units (in Clusters) to be Studied for QM Relevant QMS/QTT to be Implemented 100 Units / Rs. 2.5 cr p.a = Rs. 10 cr 5) QM Awareness Programmes among MSMEs 400 Programmes in 4 years in Selected Areas To Address Both Middle Mgt. & Shop Floor Levels 100 nos. Rs lakh x 4 years = Rs. 5 cr 5. QUALITY MGT. SYSTEMS / TOOLS ( QMS / QTT ) 3 / 3
16 Lean Manufacturing (LM) is Production of Goods Lean Manufacturing (LM) is Production of Goods Using less of all Inputs SMEs either Don’t Know or Can’t Afford SMEs either Don’t Know or Can’t Afford This, Flagship Scheme of NMCP This, Flagship Scheme of NMCP Total Project cost – Rs cr. Total Project cost – Rs cr. GOI Share – Rs cr. Rs. 224 cr. for 700 Mini Clusters (80% by GoI) Rs. 2 cr. Admn./Monitoring Rs. 4 cr. For Awareness/ Publicity BE – Rs cr. EFC Cleared. Discussion with FM (?) EFC Cleared. Discussion with FM (?) 6. LEAN MANUFACTURING 1 / 2
17 LMP to Cover 7,000 to 10,000 units in 4 years LMP to Cover 7,000 to 10,000 units in 4 years Thru Mini 10 units per LM Consultant Thru Mini 10 units per LM Consultant 100 to 300 LM Consultants required p.a. – Expensive 100 to 300 LM Consultants required p.a. – Expensive Govt : Private Funding = 80 : 20 (1st Yr), 0 : 100 (2nd Yr) Govt : Private Funding = 80 : 20 (1st Yr), 0 : 100 (2nd Yr) Rs. 32 lakh per Mini Cluster / Rs. 24 lakh per Consultant Rs. 32 lakh per Mini Cluster / Rs. 24 lakh per Consultant Industry Associations to Execute, thru IAs & SPVs Industry Associations to Execute, thru IAs & SPVs Lead / Locate / Appoint / Pay / Monitor IAs to be paid Rs. 8 lakh for Project Management Services IAs to be paid Rs. 8 lakh for Project Management Services Industry to Drive & Create Capacities in Private Sector Industry to Drive & Create Capacities in Private Sector EFC has ordered Review/Stop Work after 1 st 100 ! EFC has ordered Review/Stop Work after 1 st 100 ! 6. LEAN MANUFACTURING 2 / 2
18 7) TECH UP Scheme under Total Redrafting 8) MARKETING Scheme under Total Redrafting 9) ICT Scheme under Total Redrafting 10) DESIGN Adviser appointed. Guidelines by June 08 3 / 3 OTHER NMCP COMPONENTS: UNDER FORMULATION
19 THANK YOU
20 RGUMY to Handhold New Entrepreneurs RGUMY to Handhold New Entrepreneurs Support thru Lead Agencies – Udyami Mitras, i.e: -- To Link Entrepreneurs, Projects, Banks & Admn. UMs to assist Project Selection & Preparation UMs to assist Project Selection & Preparation Pursue with Banks and Government Agencies UMs to Receive Payment Per Case – Rs & above UMs to Receive Payment Per Case – Rs & above Support to 1.5 lakh entrepreneurs Support to 1.5 lakh entrepreneurs Awareness & UM Identification are Essential. Awareness & UM Identification are Essential. RAJIV GANDHI UDYAMI MITRA YOJANA OTHER SCHEMES
21 Total Project cost – Rs cr. Total Project cost – Rs cr. GOI Share – Rs cr. BE – Rs cr. Revised EFC Finalised. Under Submission Revised EFC Finalised. Under Submission Focuses on Energy and Certification Focuses on Energy and Certification 6 Activities Proposed: 6 Activities Proposed: 1) Renewable Energy : 5 Demonstration Projects in 4 yrs UNIDO / GEF Programme on Bio Fuel / Gas R&D Centre of Excellence at IISC Bangalore Training / Website / Propagation Rs. 1 cr. p.a = Rs. 4 cr. GEF Funding – Rs. 0.8 cr. 7. TECHNOLOGY UPGRADATION 1 / 3
22 2) Implement Energy Audit Advice in 1200 units Based on PCRA’s Audit of 2000 units (own cost) Rs. 9 cr. (on 60% Government Aid) p.a. = Rs. 36 cr. 3) Assessment Study & SPV for CDM To set up 4 SPVs p.a Rs cr. per SPV = Rs. 2.4 cr. for 16 SPVs 4) Awareness Progs. For CER/CDM (Carbon Credits) 150 Progs. Rs. 33,000 each = Rs. 2 cr. (4 yrs) May revise CDM Intervention, if successful 7. TECHNOLOGY UPGRADATION 2 / 3
23 5) Voluntary Product Cert. Reimbursement (Rs cr.) 800 Units/Licences (ISI Mark) p.a Rs. 1 lakh (max.) per Unit/Licence = Rs cr. (4 yrs) 325 Units/Licences for Int’l Cert. for CE, ANSI etc. p.a Rs. 2 lakh (max.) per Unit/Licence = Rs cr. (4 yrs) 6) Continuous Appraisal & Miscellaneous (Rs. 2.0 cr.) For Mid-Course Changes Outsourcing / Hiring Experts etc. 7. TECHNOLOGY UPGRADATION 3 / 3
24 To Survive competition, Indian MSMEs need To Survive competition, Indian MSMEs need Modern Packaging & Marketing Techniques To Technically Study Competitors’ Products and Counter-respond NER Requires integration in Mainstream Markets NER Requires integration in Mainstream Markets Wide Ranging exposure to be Encouraged Total Project cost – Rs cr. Total Project cost – Rs cr. GOI Share – Rs cr. BE – Rs cr. Preparing Revised EFC by 15th April 8. MARKET ASSISTANCE & TECH. UPGRADATION (MARKETING) 1 / 3
25 Activities Proposed (Still under Preparation): Activities Proposed (Still under Preparation): 1) Tech. Upgradation in Packaging with IIP, NID, IITs Exposure to Best Technologies Cluster-based Studies for Status/Actions Unit-based Interventions on Cost Sharing 2) Study Competition for Self-improvement Exposure to Competitors’ Products in India & Abroad Detailed study of specific ‘Defeats’, with reasons Enterprise-led Improvement Programmes 8. MARKET ASSISTANCE & TECH. UPGRADATION (MARKETING) 2 / 3
26 3) Modern Management Techniques Adoption Basically Skill Development in Latest Technologies 4) NER Exposure and Marketing Assistance Connect NER Entrepreneurs to Mainstream Through Subsidised Exposure Visits to India’s best Participation in National Fairs, Study Missions and Workshops 8. MARKET ASSISTANCE & TECH. UPGRADATION (MARKETING) 3 / 3
27 Low ICT Usage by SMEs – A Cause of Concern Low ICT Usage by SMEs – A Cause of Concern Most ICT Cos. Focusing on SMEs – but Slow Progress Most ICT Cos. Focusing on SMEs – but Slow Progress Intensive Discussions with Stakeholders of Major ICT Cos. Intensive Discussions with Stakeholders of Major ICT Cos. Final EFC Draft being Finalised – Costing being Worked Out Final EFC Draft being Finalised – Costing being Worked Out Total Project cost – Rs cr. Total Project cost – Rs cr. GOI Share – Rs cr. BE – Rs cr. Original Project Cost – Rs cr. Original Project Cost – Rs cr. GOI Share – Rs cr. BE – Rs. 10 cr. Proposal for PPP / Cost-sharing on Most Activities Proposal for PPP / Cost-sharing on Most Activities 9. PROMOTING ICT IN SMEs 1 / 2
28 Activities under Consideration: Activities under Consideration: 9. PROMOTING ICT IN SMEs No.ActivitiesGoICluster 1 25 Clusters a. Diagnostic Studies a. Diagnostic Studies b. E-Readiness Infrastructure (25 locations) b. E-Readiness Infrastructure (25 locations) c. Web Portals (25) c. Web Portals (25) d. HRD d. HRD e. Training e. Training Sub Total (Rs cr) Association Websites Rs. 8L per Assn for 40 Assn.) E-Catalogue Building & Hosting (10,000 units) SME Networking Portals (PPP) Project Office TOTAL (Rs. 100 cr.) / 2 Hosted Models & Rolling Fund – Under Consideration
29 Designs make SME Products Competitive Designs make SME Products Competitive Ballpoint Pens, Tooth-brushes, etc. Design Input Essential for Survival of MSMEs Design Input Essential for Survival of MSMEs Cluster-based Design “Clinics” Proposed Cluster-based Design “Clinics” Proposed Suggestions / Specific Packages Required Need to Work Out Cost and Sharing Formula Previous Proposal mainly Governmental Previous Proposal mainly Governmental One National Centre with NID 6 Regional Centres and 225 Design Clinics 10. DESIGN CLINICS / SUPPORT 1 / 2
30 Total Project cost – Rs cr. Total Project cost – Rs cr. GOI Share – Rs cr. BE – Rs cr. Scheme held up due to lack of Specificities Scheme held up due to lack of Specificities Discussions with FICCI, CII etc. on DPR has been Insisted. Bids called. DPR has been Insisted. Bids called. Thereafter, EFC and CCEA to follow 3 months target 10. DESIGN CLINICS / SUPPORT 2 / 2