Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS.

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

KEK : Novel Accelerator TYL Workshop M. Yoshida, M. Nozaki, K. Koyama, High energy research organization (KEK) -Collaboration -IZEST (CEA) :
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Coherent Radiation from High-Current Electron Beams of a Linear Accelerator and Its Applications S. Okuda ISIR, Osaka Univ Research Institute.
Cooling Accelerator Beams Eduard Pozdeyev Collider-Accelerator Department.
The Siberian Snake Kai Hock Liverpool Group Meeting, 12 August 2008.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
PST05 Workshop, Nov 14-17, 2005 M. Farkhondeh 1 Polarized Electron Sources for Future Electron Ion Colliders M. Farkhondeh, Bill Franklin and E. Tsentalovich.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Thomas Roser NSAC subcommittee April 4, 2005 Facility Strategy RHIC performance overview Luminosity and polarization evolution (towards “enhanced luminosity”)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Low Emittance RF Gun Developments for PAL-XFEL
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
A. Doyuran, L. DiMauro, W. Graves, R. Heese, E. D. Johnson, S. Krinsky, H. Loos, J.B. Murphy, G. Rakowsky, J. Rose, T. Shaftan, B. Sheehy, Y. Shen, J.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Summary of Accelerator System (WG2) 김귀년 경북대학교. Presentations for WG2 -Polarized Electron Source for ILC in Korea - ( 김귀년 ( 경북대 ), 박성주 (PAL)) - ILC Bunch.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
+ - Concluding remarks on the R&D for a Magic Proton Ring for e  cm. Yannis K. Semertzidis, BNL The bottom line Funding request Possible action.
1 Studies of electron cooling at DESY K. Balewski, R. Brinkmann, Ya. Derbenev, Yu. Martirosyan, K. Flöttmann, P. Wesolowski DESY M. Gentner, D. Husmann,
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Overview of BNL’s Accelerator R&D Program Vitaly Yakimenko April 18, 2006 DOE Annual High Energy Physics Program Review Brookhaven National Laboratory.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
JLEIC and Electron Cooling: An Introduction Yuhong Zhang JLEIC Discussion Forum, August 3, 2016.
UK Neutrino Factory Conceptual Design
eRHIC Design and R&D From RHIC to eRHIC
Beam-beam effects in eRHIC and MeRHIC
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
Electron Polarization In MEIC
Superbeams with SPL at CERN
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Electron Source Configuration
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
MEIC New Baseline: Part 10
MEIC New Baseline: Performance and Accelerator R&D
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS Complex NP –RHIC Complex

Accelerator R&D at BNL - HEP Program Accelerator Test Facility(Vitaly & Bob will describe in more detail) Hands-on User facility Experimental Program via proposals & program committee High brightness electrons (75 Mev) + High powered synchronized laser 4 beam-lines with ~ 10 experiments at any given time Facility Support via HEP & BES (20%) (~$2.5M) Moved from the Light Source to the Physics Department (3 years ago) ~ 8 FTE’s Issues Flat-flat funding over past several years Enhanced safety requirements increase demands on in-house staff

Accelerator R&D at BNL - HEP Program Muon Collider/Neutrino Factory R&D Strong BNL presence since the inception of these studies. Bob’s group have been “high profile” in both the Neutrino Factory and Muon Collider design studies, and continue to play such a role BNL takes the lead in the targeting studies FFAG based designs Home of the ICOOL simulation code ~ 6 FTE’s Issues After several years of benign neglect of the muon collaboration, the recent activity in neutrino super-beams has injected some interest into high power targets/horns Progress in other areas is slow

Accelerator R&D at BNL - HEP Program Superconducting Magnet Division LHC -> LARP (NbSn magnet development) ~$2M in FY06 ILC final focus R&D ~$600K in FY06 (mini-magnets, vibration, IP design) SC materials development - NbSn, MgB2, BSSCO, YBCO ~$700K ~ 14 FTE’s Issues: Cable test facility closed this year (lack of operating funds)

300 MeV S-Band Linac Titanium Sapphire Laser BNL Photoinjector IV Chicane Compressor 10 m NISUS Wiggler Accelerator R&D at BNL - BES Program NSLS Source Development Lab: A Platform for FEL R&D (ONR funds)

Cutting Edge SDL 400 nm 0.23 nm FWHM SASE x10 5 Wavelength (nm) HGHG HGHG 266 nm Beam Dynamics XUV Photochemistry Electric Field (kV/cm) High Intensity THz High Brightness Beams Accelerator R&D at BNL - BES Program

VUV Ring Coherent Emission Studies n Bursts of Coherent IR n Interferometer studies P coherent /P incoherent > 10 4 (at ~40 GHz) n Microbunching ? n Streak camera studies Frequency agrees with Z || (  ) n Microbunching due to microwave instability B.Podobedov, G.L.Carr, S.L.Kramer and J.B. Murphy Accelerator R&D at BNL - BES Program

Accelerator R&D at BNL - NP Program The RHIC complex is a major accelerator facility. In a few years it will be the only US high energy hadron collider and together with the LHC one of two in the world. The polarized proton program is unique. The R&D is mostly what this Committee would call short/medium term: largely determined by the operation of the RHIC complex (with a surprising degree of synergy with the LHC) Numerous beam dynamics issues are under study. –PLL tune & coupling feedback (real time coupling signal) –Beam-Beam (present proton limit) Long range beam-beam compensation (with wires) Head on beam-beam compensation (with an electron lens) –E-cloud studies (present heavy ion limit) –Non linear IR corrections –Polarized beam dynamics (low energy spin flip, cold & warm partial snakes in the AGS, full snakes in RHIC, polarized source, polarimeters, polarized beam simulations) –HI collimation and beam loss studies

Accelerator R&D at BNL - NP Program Short luminosity lifetime (few hours) for heavy ion collisions due to IBS cries out for beam cooling. IBS goes as ~ (Z/2) 2 so Au ions ~ 3 orders of magnitude worse than protons. For polarized protons cooling both enhances polarization lifetime and luminosity. Cooling R&D: –Microwave stochastic cooling (HI up to 100 GeV) –High Energy (50 Mev) e-cooling ( HI up to 100 GeV, Proton inj) –Optical stochastic cooling (protons 100 GeV and above). Possible test at Bates with MIT.

Accelerator R&D at BNL - NP Program The e-cooling R&D program in itself is major activity: SCRF Gun development (with ONR & AES) – 703 MHz CW, I av = 0.5A, Q bunch 1.4 nc, E kin 2 Mev, Emit 4 mm- mrad rms –First tests June 2007 ? Energy Recirculating Linac R&D –Prototype ring under construction –703 MHz SC cavities from AES

Accelerator R&D at BNL - Summary HEP supports specialized R&D activities at BNL which take advantage of the talents of the staff and facilities developed during the long HEP tenure as landlord. HEP accelerator R&D has been on a slow decline during the past decade. Although BES and NP do not obviously engage in R&D with the goal of developing the next generation of high energy facilities they do support accelerator R&D at BNL which does share a non-negligible synergy with HEP. It certainly helps support the gene pool and maintain the intellectual vitality.