ATF/ATF2 R&D status in JFY2009 Nobuhiro Terunuma (KEK) ICB meeting, ILC2010, Beijing, 2010/3/29 R&Ds reported at the last TB meeting  next talk. Overall.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Compton Experiment at ATF LCWS10 28-March-2010 T. Takahashi (Hiroshima) / T. Omori (KEK) for collaborators.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
1 Multi-Optical Transition Radiation System for ATF2 A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White,
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
Compton Experiment at ATF DR 2009 Summary and Plan ATF2 Project Meeting 15-Dec-2009 T. Omori (KEK) for collaborators.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Status N.Terunuma, KEK
Special ATF Session - ATF/ATF2 day on 28th September -
Expected hardware status and Priority of the commissioning task
ATF collaboration activity and 2016 beam schedule
Oversea collaborators
Status of ATF/ATF2 and machine schedule in this fall
Junji Urakawa ( for collaborators ) March KEK at LNF
Multi banch generation Experiment at ATF
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

ATF/ATF2 R&D status in JFY2009 Nobuhiro Terunuma (KEK) ICB meeting, ILC2010, Beijing, 2010/3/29 R&Ds reported at the last TB meeting  next talk. Overall activity R&Ds not reported at last TB meeting Updates since last TB meting Beam extraction by the Fast Kicker 1

CERN DESY IN2P3 LAL LAPP LLR John Adams Inst. Oxford Univ. Royal Holloway Univ. Cockcroft Inst. STFC, Daresbury Univ. of Manchester Univ. of Liverpool University College London INFN, Frascati IFIC-CSIC/UV Tomsk Polytechnic Univ. SLAC LBNL FNAL Cornell Univ. LLNL BNL Notre Dome Univ. ATF International Collaboration KEK Waseda U. Nagoya U. Tokyo U. Kyoto U. Tohoku Univ. Hiroshima U. IHEP PAL KNU RRCAT 2

ATF International Collaboration Oversea 25 Institutes, ~70 people, ~2000 people- days + KEK and Japanese Universities(6) 3

GDE TF request Necessary Deliverables from TF for BDS and DR 4 Test FacilityDeliverableDate Hardware development, Optics and stabilisation demonstrations: JFY ATF Demo. of reliable operation of fast kickers meeting the specifications for the ILC damping ring Generation of 1 pm-rad low emittance beam2009 ATF2 Demo. of compact Final Focus optics (design demagnification, resulting in a nominal 35 nm beam size at focal point) Demo. of prototype SC and PM final doublet magnets2012 Stabilisation of 35 nm beam over various time scales.2012 Electron cloud mitigation studies: CESR-TA Re-config. (re-build) of CESR as low-emittance e-cloud test facility. First meas. of e-cloud build-up using instrumented sections in dipoles and drifts sections (large emittance) Achieve lower emittance beams. Meas. of e-cloud build up in wiggler chambers Characterisation of e-cloud build-up and instability thresholds as a func. of low vertical emittance (≤20 pm) 2010 DAΦNEFast kicker design and pulser reliability check2010 Characterisation of e-cloud build-up and instability thresholds2010 SLAC/LLNLFast kicker pulser development2010

Running R&Ds ATF low emittance beam Tuning, XSR, SR, Laser wire,… 1pm emittance (DR BPM upgrade,…) Multi-bunch Instability (Fast Ion,…) extraction by Fast Kicker Others Cavity Compton SR monitor at EXT ATF2 35 nm beam size Beam tuning (Optics modeling, Optics test, debugging soft&hard tools,…) Cavity BPM (C&S-band, IP-BPM) Beam-tilt monitor IP-BSM (Shintake monitor) Multi-OTR Beam position stabilization (2nm) Intra-train feedback (FONT) feed-forward DR->ATF2 Others Pulsed 1um Laser Wire Cold BPM Liquid Pb target Permanent FD Q SC Final doublet Q/Sx 多くの R&D が密接に関連 有限のビーム時間 サブグループ間での相互理解・交通整 理 Improve the R&D efficiency  LINAC/DR Stabilization 多くの R&D が密接に関連 有限のビーム時間 サブグループ間での相互理解・交通整 理 Improve the R&D efficiency  LINAC/DR Stabilization 5

ATF 長期計画 ( 案 ) ATF2 35nm beam size (Single Bunch) Low emittance (1pm) ATF2 2nm Stabilization (Multi Bunch) Fast Kicker R&D ( Multi bunch Extraction ) Multi Bunch Stabilization Short term beam tests Steady Operation Verification Beam tuning R&D (2nmBPM, Fast FB) IP-BSM R&D 2nm Stabilization R&D DR BPM upgrade R&D 10 pm  1 pm 35nm steady operation 2nm Operation LINAC/DR Improvements ATF2 SC FD-Q Design Manufacturin g SC-Q Cryo Cooler ( KEK) Beam Insta ll ATF long term plan 6 GDE TF Request

7 Fast kicker R&D Initial test of Pulser performance Fast kicker R&D Beam extraction study

8 Fast kicker Experiments JFY2009 Dedicated beam time need to swap the kicker in DR (pulse magnet fast kicker) avoid the waste of beam time, especially for ATF2, due to the lack of the experience of the ATF2 beam tuning with the fast kicker Jan. (1 week) Two pulsers were broken by the radiation damage during only a few hours June (1 week) The beam did not come out to the extraction line for lack of the kick angle. Kicker electrode deformation Oct. (2 week) The first beam extraction by the Fast Kicker. The beam extraction have succeeded up to 17 bunches Mar. (2 week) Stability measurements The beam extraction have succeeded up to 27 bunches.

9 Pictures of the installed components(2009Jan) Strip-line electrodes Aux. Septum FDI pulsersBump PS and Septum PS The radiation level at the location was >10msv/h(gamma) and 100u sv/h(neutron).

10 Beam Extraction succeeded from DR to ATF Oct. 22. Beam profile at MS1X screen monitor, which is located at the downstream of the septum magnets.

11 Kick angle jitter measurement The kick angle jitter was estimated from the BPM measurement of the ATF2 beamline. The fit from the measured positions and the R12 of each location shows the angle distribution of the kicker. Figure shows the result of two set of the data. Each data used 700 shots and 400 shot, respectively. The measured angle jitters were 1.3micro-rad and 1.05micro-rad, respectively(preliminary). The angle jitters of the kicker were 4.3x10^-4 and 3.5x10^-4, respectively. Fast Kicker ATF2 Cavity BPMs

We could minimize the beam size to 1.5um at MW1IP (post-IP Carbon WS) by KEK multi-knob. It reached the measurement limit of this WS / 3 / 19 Owl Shift T. Okugi (KEK) Post-IP Beam size measurement under the Fast Kicker operation 12

13 Multi-bunch beam extraction by the Fast kicker in DR: 3 Trains, 9(max 10) bunches/train with 5.6 nsec spacing Extracted: 27(max 30) bunches with 308 ns spacing bunch-by-bunch profile follows that in the DR. bunches were extracted from the last bunch to the first bunch. Further R&D for the uniform extraction should be done.

Compton e + : Two Prototype Cavities 4-mirror cavities w/LAL 2-mirror cavity high enhancement small spot size complicated control moderate enhancement moderate spot size simple control (Hiroshima / Weseda / Kyoto / IHEP / KEK) demonstration of  ray gen. accum. exp. w/ cavity and acc. 14 Installation of LAL cavity will be summer 2010

Compton e + : Summary 2 mirror cavity to demonstrate photon generation and to accumulate experience w/ beams – Before summer 2009 enhancement of 250, 27 gammas / crossing – Higher reflection mirror installed summer (99.6%, 99.6%) ->(99.6%, 99.9%) collision experiment on going with enhancement ~750 4 mirror ring cavity for higher enhancement and small spot size – Basic test on optical table – First prototype at KEK and being tested – Installation of LAL cavity will be summer

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09 ATF2 FB system: FONT5 (Oxford,KEK) Dedicated system: 2 stripline kickers + fast drive amplifiers 3 stripline BPMs + fast analogue front-end electronics 9-channel digital FB processor

17 New BPMs and kickers installed + working FONT5 FB board fabricated and commissioned FB loop closed Beam quality is a serious issue: banana-train can be tuned away (or corrected) large jitter and lack of correlation between bunches are major problems. Plans: 2010 Install Valencia movers (January) Provide ‘turn-key’ bunch-by-bunch FB system for achievement of ATF2 goals Plan to replace LO-based BPM processor scheme FONT5 summary 2009

relocation of the laser room and the collision chamber 2010 commissioning of the laser system commissioning of the laser transport and collision system (2010/Mar/22~) beam study will be resumed after April Laser Wire (JAI,KEK)

Challenges toward the 1pm emittance Simulation: BPM offset error should be εy ~ 2 pm Magnet re-alignment, εy ~ 1 pm DR BPM upgrade (FNAL, SLAC, KEK) a high resolution BPM system a broadband turn-by-turn mode (< 10 µm resolution) a narrowband mode with high resolution (~ 100 nm range) Electronics for all DR BPM (96) is under preparation at FNAL. Installation will be done around the IPAC10 (May). 19

20 Multi-Optical Transition Radiation System for ATF2 1.Most parts were arrived at ATF. 2.Two persons from IFIC are visiting ATF in this month and are working to assemble OTRs on the test stands. 3.Control cables were put between the beamline and a control hut. 4.Installation of OTR will be done after the full control becomes available. After IPAC? A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC and KEK team Focus adjuster slide adaptor plate Focus adjuster slide Focus adjuster Slide angle plate X and Y target position viewing adjusters Mitutoyo 10X lens And 1x tube lens 90de g mirro r Newport MV120 mover English version NEMA 23 frame actuator for Newport MVN120 Vertical actuator Mounting brackets OTR body and optics Support plate Target inserter MDC part # Prosilica camera Optics extension tube and mounting rings One each of all parts with RED arrows have been purchased or are in fabrication by SLAC for testing. for Fast Emittance Measurement

21 Major Hardware Installation in 2010 LCLS digital readout system digital readout system Fast emittance measurement

22 Summary 1.ATF/ATF2 was operated under the higher international activity. 2.There are many progress on the R&Ds. The beam extraction by the fast kicker was successfully done. Kick angle stability was confirmed as low as that of the conventional double kicker system. < ILC requirement. 3.Installation of new instruments are scheduled. They will improve the efficiency of R&Ds.

23 backup

24

25

26

27