NETPDTC Hosting Support for AIM Tools NETPDTC Hosting Support for AIM Tools Peg David, NETPDTC N621, Tech PM Roy Hoyt, NETC N74 Functional PM/Resource.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

AIM Enterprise Central Site Planning
Internet Information Services 7.0 and Internet Information Services 7.5 Infrastructure Planning and Design Published: June 2008 Updated: November 2011.
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
AIM Toolset Interfaces with Authoritative Technical Data
DoD Information Assurance Certification and Accreditation Process (DIACAP) August 2011.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
AIM – CeTARS Web Service Interface: Course Master Schedule and Other Possibilities November 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
Christopher P. Cabuzzi CS 591 DEFENSE INFORMATION ASSURANCE CERTIFICATION & ACCREDITATION PROCESS (DIACAP) Chris Cabuzzi, DIACAP, 12/8/10 1.
AIM Program Software Status
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
Microsoft ® Application Virtualization 4.5 Infrastructure Planning and Design Series.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
Cost Effort Complexity Benefit Cloud Hosted Low Cost Agile Integrated Fully Supported.
Esri International User Conference | San Diego, CA Technical Workshops | Intro to ArcSDE for SQL Server Tony Wakim & Jim Gough July , 2011.
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Microsoft ® Application Virtualization 4.6 Infrastructure Planning and Design Published: September 2008 Updated: February 2010.
Customer Forum OTech’s New Web Publishing Service Web Services Section – April 29, 2015.
Lessons Learned from NETPDTC Central Site Implementations Lessons Learned from NETPDTC Central Site Implementations 23 Aug 11 Peg David, NETPDTC Project.
Alphabet Soup: PSS Contribution April 3, 2013 Jamie Wyant |
Enterprise Peg David AIM Technical Program Manager NETPDTC N APRIL 2013.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Server Virtualization: Navy Network Operations Centers
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
NETPDTC AIM Enterprise Centralization NETPDTC AIM Enterprise Centralization Peg David, NETPDTC N621, AIM Tech PM Roy Hoyt, NETC N74 Functional PM/Resource.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
Review of NWS IT Consolidation Efforts For HIC Meeting July 2006 Tom Schwein Team Leader of Desktop Management Tiger Team SOD CRH.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
May 8, 20071/15 VO Services Project – Status Report Gabriele Garzoglio VO Services Project – Status Report Overview and Plans May 8, 2007 Computing Division,
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
May 6, 2015 Session 10:00am – 12 Noon. Agenda 2 TopicPresenter / FacilitatorTimeframe  Welcome Michael Chen5 min.  CA Web Publishing Richard Lehman55.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Rob Davidson, Partner Technology Specialist Microsoft Management Servers: Using management to stay secure.
System Center Lesson 4: Overview of System Center 2012 Components System Center 2012 Private Cloud Components VMM Overview App Controller Overview.
State of Georgia Release Management Training
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Overview of the BI Tools – Enterprise CoE Scope of Services
Office of Administration Enterprise Server Farm November 2004 Briefing.
Office of Administration Enterprise Server Farm March 2006 Briefing.
NETC Authoring Instructional Materials (AIM) Roadmap February Bruce Bare.
SP Business Suite Deployment Kick-off
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Description of Revision
20409A 7: Installing and Configuring System Center 2012 R2 Virtual Machine Manager Module 7 Installing and Configuring System Center 2012 R2 Virtual.
Executive Project Kickoff
{Project Name} Organizational Chart, Roles and Responsibilities
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

NETPDTC Hosting Support for AIM Tools NETPDTC Hosting Support for AIM Tools Peg David, NETPDTC N621, Tech PM Roy Hoyt, NETC N74 Functional PM/Resource Sponsor Bruce Bare, NETC N62 AIM Team: Tiffany Dombrowski, AIM PM / Ron Zinnato / Jamie Stewart 3 Apr 12

Overview Central Site AIM I/AIM II implementation for all NETC Centers plus non-NETC communities CPM Rel 5.0 hosting at NETPDTC Implementation Issues

AIM Central Site Hosting at NETPDTC NETC N74, N6, and NETPDTC have a plan and schedule to migrate most AIM content and processing to NETPDTC Citrix Metaframe-based servers thru end FY12 Benefits Include: ‒ Simultaneous access by geographically dispersed Center and contractor personnel for collaborative development and maintenance ‒ Support for future centralized enterprise data mining for reuse, repurpose, and reference (R3) ‒ Significantly faster access to software updates ‒ Potential for automated workflow

AIM Central Site Implementation Points of contact: ‒ NETC N74: Leslie Desenburg ‒ NETPDTC: Peg David/Virginia Lovett/Chris Stark/Charlie Odom (Metaframe Sys Admin) ‒ AIM team: Ron Zinnato/Steve Wicinski/Jim Ferrall Implementation resources including planning document templates and narrated help videos available on AIM information Web page: AIM Central Site Hosting at NETPDTC

Schedule and Center POCs * TBD Date - CNATT/CSFE Migration to AIM 5.0

Center Transition Planning Kick-Off Meeting with each Center POCs Centers review/assist draft Transition Plan, roles and responsibilities, POAM, Test Plan, Q/A’s Identify data transfer method; data quantity Review and understand ESS/CITRIX Account Creation Process – Form, SAAR, Center IAM role Review templates, lessons learned, forms, user guides – all found at:

Notional Implementation POA&M

AIM Central Site – eDMZ standup Current NETPDTC central site migrating to eDMZ; benefits AIM as whole when Application migrates to NOLA eDMZ Centers/data on central site will migrate inside the eDMZ Functional Test Plans will be done; code freeze, Production Release Reviews prior to go-live ‘ESS’ CITRIX accounts transition to ‘NTSS’ CITRIX accounts; no new form required; Centers will validate their users/info on spreadsheet ; PM office to maintain SAAR repository Remaining Centers if any have not transitioned by go-live – will transition directly into eDMZ w/ NTSS accounts

AIM eDMZ Milestone Timeline 9 19 Mar - Start Server Builds 04 Jun - Complete Server builds/all Scans and STIGS 3 Jul - Complete NETPDTC IA Doc Build and review 25 July NETC IA Review Server Builds and Security Test (19 Mar – 04 Jun) Note: IATT will be 11 Apr – 04 Jun NETPDTC IA Doc Build/Review 05 Jun – 3 Jul (22 Work days) NETC IA Review 05 – 25 Jul (15 Work Days) 05 Oct Complete ODAA Review and Receive ATO Operational/Functional Test and Prod Readiness Review 05 Jul – 15 September Effort includes new server builds : ‒ Average builds/STIGS/SCANS - 50 days ‒ 2 SQL DB Servers for SQL DB clusters (Physical); 4 ESX Host Upgrades for VMWARE Farm; 1 CPM Web Interface Server (Virtual); 5 AIM Citrix Servers (Virtual)  Interim Authority to Test (IATT) period 16 May – 10 AUG

AIM I RLO Performance Issue Identified potential login issue - CPU utilization – consensus: does not represent performance issue Identified disconnect issue with EDE update by AIM I ‘super’ user – saturating system, breaking after 4.5 hours; conducting stress test with realistic data this week Affects traditional AIM I and ‘may’ affect LO module; debugging code being added, duplicate process(es), see impacts – isolate coding and/or configuration issues Testing to see if applicable to CSCS AIM I processes; test with both Columbia-hosted production version of CPM & re-pointing via.ini file to NETPDTC CPM test instance NETPDTC: deploy Windows Server 2003 R2 x64 (64-bit) Enterprise Edition to legacy and eDMZ servers; allows additional CPUs and memory to be added as needed; handle more load per server Establish performance baseline; compare/contrast baseline configuration with identified mitigations for current environment and planned eDMZ

AIM Certification and Accreditation NETC/ODAA treating Central AIM as ‘new’ System standing up inside eDMZ As such, Interim Authority to Test (IATT) granted for 16 May – 10 Aug 2012 eDMZ has dependency on CSA Accreditation Plan; ATO imminent Apr timeframe As IATT test period draws to close, C&A package, STIGs, SCANs, mitigations, POAMs are updated, and any other deltas added – for ODAA submission for full ATO approval

Implementation Issue: NOFORN NNPI Affects primarily non-SWS undersea community – NAVSEA 07TR, SLC, SLC learning sites Stringent data handling controls for unclassified No Foreign Dissemination Navy Nuclear Power Information, mandated by NAVSEA 08 NETC/NETPDTC standing up SLC enclave on TRANET_C (NAS PCOLA) to host: ref matl, e-library, IETMs, NNPI content, course curriculum info, AIM content, NNPI/NOFORN, used by SLC DETs ‒ How does this fit into AIM program from enterprise view? ‒ Requirement to host AIM Application on TRANET_C? For SLC / others? ‒ Is TRANET_C interim option until NOLA data center migration? SSC New Orleans (NOLA) currently certified for NOFORN data

CPM Hosting at NETPDTC NETC N74/N6 and NETPDTC in process of migrating production version of CPM to NETPDTC ‒ NETPDTC installed test instance of CPM Rel 5.0 on new server; conducted formal GAT as arranged by AIM SSO ‒ Full IA Certification & Accreditation process underway by NETPDTC/AIM team; IATT in hand may allow.com ports to open during eDMZ test period; full IATO/ATO allows.com access ‒ CeTARS Web service, AIM enterprise data environment Web service, and PPP Repository integrated into CPM on NETPDTC server ‒ Production CPM remains hosted by AIMEREON until ODAA grants IATO/ATO for NETPDTC hosted eDMZ

CPM Hosting at NETPDTC (cont’d) Benefits Include: ‒ Enterprise production hosting and support vs. current contractor environment with limited server configuration and bandwidth ‒ Leverages NETC domain sys admin, database management, and information assurance expertise at NETPDTC ‒ Co-located with rest of NETC enterprise IT applications and off-site COOP support ‒ Secure access from both.mil and.com domains

CPM Hosting POCs NETC N74: Leslie Desenburg NETPDTC: Peg David / Virginia Lovett / Bob Rayburn (Web Apps BH/CPM assist) AIM team: Ron Zinnato / Steve Wicinski / Jamie Stewart / Jim Ferrall

Non-NETC Implementation 1 Oct 11 - SSP TRIDENT AIM I Central Site instance transitioned from NAWCTSD to NETPDTC – fully operational - AIM I and LO Module production work NAVSEA 07TR AIM I Central Site instance TBD per decision on support for NOFORN NNPI data Other interested communities: ‒ Navy Medicine ‒ NAVSPECWARCEN (hosted by NAVSOC) ‒ NAVRES ‒ DANTES ‒ Regional Maintenance Centers – Norfolk / San Diego

Implementation Issue: Privilege Levels 5 levels implemented in AIM II per CNATT request 3 levels implemented in AIM I per SSP request CPM-style role/privilege structure in queue for discussion development for AIM I/AIM II based on CNATT working group ACR and new software task order All user communities need to review current business process and adapt for Central Site environment Many lessons learned from CNATT AIM II and SWS AIM I implementation including request for 6 th level in AIM II to support limited contractor visibility into AIM production instance

Current AIM II Privilege Levels

CNATT AIM Central Site Process Flow

Implementation Issue: ‘ancillary data’ Prospective users have requested NETPDTC establish an ‘ancillary data’ (i.e., not really AIM stuff) storage area in conjunction with their AIM I/II Central Site instances Need better definition of how ‘ancillary storage’ will be used and NETC N6/N7 approval of business process and IT infrastructure loading Also may be impacted by resolution of Information Assurance Category 1 issue mitigation for Metaframe systems

Implementation Issue – Initial Discussions: Jobs Server approach A number of processes in AIM I/II take a long time to complete: e.g., Trainee Guide print preview, large course export, large course import Current NETPDTC implementation requires Central Site user to remain logged into Citrix session with CAC inserted in local workstation until process completed Jobs Server concept developed by NETPDTC and AIM teams would permit user to begin long-running process, transfer process to Jobs Server, end Metaframe session, and then log back into Metaframe later to retrieve product of long-running process completed on Jobs Server

Implementation Issue: Job Server approach (contd)

AIM Central Site Architecture

Questions?