03 November 09 NRW Program Negeri Sembilan Experienced (Hatimuda Sendirian Berhad) 031109 NRW Program Negeri Sembilan Experienced (Hatimuda Sendirian Berhad)

Slides:



Advertisements
Similar presentations
Intelligent Pressure and DMA Management
Advertisements

APPLYING GIS FUNCTIONS IN NRW REDUCTION ACTIVITIES
TILDE DST & DMS Software Decision Support Tool & Data Management System for Leakage and Water Loss Management.
Quality Water, Quality Life CURRENT AND FUTURE DEVELOPMENT PLANS PRESENTED BY Willy K. Kamau.
NONREVENUE WATER - Current and Future Remedies Gary Harstead Director – Asset Management United Water NARUC Winter Meeting February 2013.
A BETTER TOMORROW made possible Canadian Utilities Learn to Fly through Benchmarking of Water Loss Management Christine McCormack, P.Eng. September 13.
1 Budget Compliant Water Management SECOSYS Water Management Products.
Technology that optimises water distribution networks.
NRW TECHNIQUES & SMART METERING TO IMPROVE OPERATIONAL EFFICIENCIES ACWUA, AMMAN – JORDAN, JANUARY 2013.
Contractual Issues of Non-Revenue Water Contracts David Ehrhardt, Nils Janson, and Traci Kuratomi 6 November 2013.
THE DEVELOPMENT OF LABUAN WATER-SUPPLY GIS (LWS GIS)
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
IBM Smarter Cities Challenge City of Tucson Award Recipient for 2013 November 14, 2012.
A Workshop for Communities Implementing Water Loss Management Prepared for Columbia Basin Trust by IKEN Services Ltd. May 2013 Leak Detection Methods.
Non-Revenue Water Management : The Case of Entebbe , Uganda
Energy Management in Brazil August 9th, 2011 Rio de Janeiro | RJ By: Pedro Paulo da Silva Filho | Grupo SAGE Desenvolvimento: SAGE US – Brazil Industrial.
Leaders in Sustainable Energy Stewart Conway & Prakash Patel.
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
1 Investor 27 Oct Overview i2O offers a solution to huge problem of water leakage Managed service with recurring revenue Seeking £4m to reach.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Power Line Carrier Communication based Automated Meter Reading System
GEOGRAPHICAL INFORMATION SYSTEM (GIS)
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Water Loss BMP Revision Jim Metropulos Andrew Chastain-Howley.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
Department of Water Affairs Water Requirements and Availability Reconciliation Strategy for Mbombela Municipal Area Water Conservation and Water Demand.
Hawkin s Delafield & Wood LLP PARTNERSHIP GUARANTEES TO ENHANCE WATER CONSERVATION Presented by Rick Sapir (973) Presented.
Luxor, Egypt, April 2013 Utilization of ICT for Enhanced Water Resources Management &Monitoring Networks at MWRI Ayman Ibrahim, General Director.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Developing a Non- Revenue Water Strategy
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Energy Policy Act - BLM Cadastral Support Strategy 1 CADASTRAL PLANNING CADASTRAL SERVICES Consultation for Effective and Efficient Land Management: National.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
Water Audits: A simple “How To…”
ILembe District Municipality Municipal Water Infrastructure Grant Projects and Project Readiness 13 TH SEPTEMBER 2013 iLembe District Municipality Municipal.
The Smart Network: NRW, Pressure and Asset Management
Benchmarking Water Loss Performance:
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Illinois Water Audit and Loss Control Training Workshop Fall 2014 Intro Fall 2014 Intro.
Water Loss Seminar Ankara January 21st 2009 PROWAT’s PRODUCTS: THE BASIC WATER LOSS BOOK AND LATEST TECHNIQUES FOR REDUCING AND CONTROLLING WATER LOSS.
ETHEKWINI WATER & SANITATION: NON REVENUE WATER BRANCH YOUTH INNOVATION CHALLENGE Simon Scruton, Pr Eng, MSc. eThekwini Water and Sanitation Manager Non-Revenue.
Pyramids A pyramid's design has most of the weight closer to the ground -creating a stable structure Julian Thornton.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
What is the Cost of Lost Water? AWWA / RCAP Small Systems Operator Training Columbus, Ohio May 24, 2016 AWWA / RCAP Small Systems Operator Training us,
-1- 游叡研幫工程司 Water Leakage Improvement Ray-Yen, YU Assistant Engineer Taipei Water Department 2013 Seoul Study Workshop.
WATER SYSTEM WORKSHOP February 27, 2012
| Performance Based NRW Reduction Contracts The case of HoChiMinh City Bill Kingdom.
Case study of Velika Kladusha (B&H), Lipjan (Kosovo) and Kochani (Macedonia) Vienna, 13 May 2016.
Non-Revenue Water: The cornerstone in delivering efficient and effective water services by Bambos Charalambous Past Chair of the IWA WLSG Chair of the.
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
SC Rural Water Conference 2016
4/14/2018.
Provincial Blue Drop challenges
By Dr Mohammed Al-Waqfi Technical Monitoring & Auditing Manager
Water Loss Audit Findings (FY 13-14)
AMI Hidden Costs and Hidden Values
City of Sisters, OR 2017 Water & Sewer Rate Study
DATA for ACTION Edna Yohei Malaisé
Model of block distribution system (Fukuoka City Waterworks Bureau)
Pipe Patrol – Leak detection and localisation system for Water Networks
Organisational NRW Management
Introduction to NRW Introduction to IWA Water Balance, NRW components and Performance indicators.
District Metered Areas
Commercial NRW Reduction
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
Professor Vasilis Kanakoudis
Presentation transcript:

03 November 09 NRW Program Negeri Sembilan Experienced (Hatimuda Sendirian Berhad) NRW Program Negeri Sembilan Experienced (Hatimuda Sendirian Berhad)

Non Revenue Water is The Difference Between Volume of System Input and Billed Authorized Consumption August 15

August 15 - Malaysian Context - Why High NRW Levels? Not Difficult - Boring Subject (Never Mind Attitude) No Complains – Consumers Have Sufficient Supply No Incentives and Recognition Money Spend Not for the Root of the Problem (Rehabilitation Projects Only) Insufficient Allocation Unsustainable and non Committal (No Follow Through After Project) Ineffective Monitoring System False NRW Calculations and Data Interpretations Non Committal on Commercial Losses MOST IMPORTANT : Repetitions on Wrong Doings During New Water Supply Project Implementations and Substandard Materials and Poor Quality Workmanship

Key Conditions for Sustainable NRW Program Key Conditions for Sustainable NRW Program Pressure to develop NRW reduction strategy to show effectiveness in managing water loss management. Commitment from key decision maker within utility. Adequate technical understanding Organization and Information System (requires long term NRW strategy to reach an economic level and constantly monitored to maintained the level) August 15

August 15 KEY BENEFITS OF NRW PROGRAM Improving management of water supply distribution system Improving Customer Services & Revenue Collection Improving asset management system for maintaining, operating and upgrading the network components Reduce Operational Cost & Unscheduled Interruption Implementation of Water Audit Development of long term pipe replacement programme Deferment in Capital Expenditure

August 15 What we cant measure we cant manage Requires Through A diagnostic approach followed by the implementations of practicable and achievable solution to Reduce and Sustain NRW levels. Holistic NRW NRW! i.Not Technically Difficult but ii.Complex ii. Reflects Efficiency iii. Effects Financial Iv. Requires Commitment Because

August 15 Holistic NRW Difference Between Actual Volume of System Input and Detailed Volume Measurement of Billed Authorized Consumption i. Detailed Measurement & Monitoring of High Quality Data ii. Use of Latest Technology in IT & Communication iii. Traditional NRW Approach iv. MNF Monitoring by SCADA as tool to prioritize ALC Through

August 15 Negeri Sembilan 6646 kilometer persegi Penduduk 925,000 Anggaran Panjang Paip : 6500km 330,000 meter pengguna - 12 % pengguna komersial- 38% penggunaan 25 Loji Rawatan Air - Kapasiti Rekabentuk : 730 mld - ( Dari 0.1 mld hingga 30.4 mld) 468 Kolam dan Tangki Air simpanan Anggaran NRW 2005= 53%

August 15 Perbandingan % NRW

August 15 Negeri Sembilan Water Supply Demand

August 15

August 15

Negeri Sembilan NRW Projects 1.Holistic NRW Seremban RM 14 million Completed Feb Holistic NRW Seremban Service & Maintenance Contract RM 10.3 million April 2009 – Mac Holistic NRW Kuala Pilah / Jempol RM 25 million Feb 2008 – Feb Holistic NRW Port Dickson RM 15.3 million April 2009 – Mac Seremban NRW Program RM 43 million July 2007 – June 2010 August 15

August 15 PROJEK HOLISTIK NRW Seremban Kawasan Senawang meliputi: Mukim Ampangan dan sebahagian Mukim Bandar, Rasah dan Rantau

August 15 SEREMBAN HOLISTIC NRW PILOT PROGRAM (Project Overview)  Project Cost  Original at RM 10.5 million (USD 3.0m) for 40,000 acc.  Danish Govt. DANIDA Grant of RM 1.2 m  Budget Addition of RM 4.5 m for 62,000 acc.  Payment Terms  RM 2.5m Tied to NRW Reduction  Balance Based on Bill of Quantities  Leak Repairs at Actual Cost plus Management Fee  5% Performance Bond – Penalty if 15% NRW Reduction not achieved

August 15 Seremban Holistic NRW Pilot Project Guarantees15% NRW Reduction Source of supply 2 No 900 mm 58.5 km.sq 0.8% km pipes 11% 64,385 metered Consumers 19% 55 DMZ’s 40 DMZ’s Modeled 11 Fixed Time & 9 Time Modulated PMA’s 3456 leaks detected And repaired

August 15 SEREMBAN HOLISTIC NRW SCOPE OF WORKS 1.GIS PIPE REGISTRATION 2.DESIGN & ESTABLISHMENT OF DMZ 3.BASELINE NRW CALCULATIONS & SETTING TARGETS 4.PRESSURE MANAGEMENT CONTROL 5.SCADA & AMR 6.LEAK DETECTION / RESERVOIR OVERFLOW & REPAIRS 7.CONSUMER METER MANAGEMENT & REPLACEMENT 8.ESTABLISHMENT OF CONTINUOUS NRW MONITORING MECHANISM. 9.ESTABLIMENT OF PIPE REPLACEMENT PROGRAM

August GIS Pipe Registration

August 15 Cadastral Map / Satelite Image Cadastral Map (UPI of lots used as ID ) Satellite Image (as back ground map for reference)

August 15 Verification & Digitizing of Pipelines Black: Pilot Area Red: Hardcopy Green: AutoCAD Blue: Field

August 15 PIPE REGISTRATION No.Pipe Material (KM)Softcopy (KM)Field Verification (KM)Hardcopy (KM) Total Digitize Pipe (KM) 1AC HDPE MS UPVC CI DI GI SI No Data/Others0.000 Total

August 15 Satelite Image

August 15 Satelite Image Overlay With Cadastral Map

August 15 Digitizing of Pipelines & Atributes

August 15 Geo-coding (Geo referencing) of Consumer Accounts

August DMA Design

August 15 External pressure loggers No reaction at the pressure, which means they are supplied from another source Internal pressure loggers Pressure drop at the same time at at P1 and P2 Zero Pressure Test (ZPT)

August 15 Model Building and Calibration for DMZ

3. BASELINE CALCULATION Top Down NRW measurement based on actual volume of system input and detailed volume measurement of billed authorized consumption. For the purpose of establishing the present NRW level in order to put up an agreed NRW reduction target. August 15

4. Pressure Management Real Loss Management Strategy for Background Losses August 15

August 15 Box HQ 5. SCADA – (web hosting) 5. SCADA – (web hosting) -For reduction of time & cost of operation and real time data availability-

August 15 SCADA & Data Hosting

August 15 MNF Monitoring -Prioritizing and Localizing- MNF Monitoring -Prioritizing and Localizing- High MNF detected MNF back to normal Repair works Abnormal flow

6. Leak Detection & Repairs (Find and Fix) 1.ALC 1. 1.Monitoring 2. 2.Prioritizing 3. 3.Localizing 4. 4.Locating 5. 5.Pinpointing 2. Speed & Quality Repair 3.Good & Quality Material 1. 1.Monitoring August 15

August 15 Registration of Leak Locations Registration of Leak Locations

RESERVOIR OVERFLOW Contributes a significant % to overall NRW due to: –Over pumping (pumping fed reservoirs) –Faulty altitude / float valves (gravity fed reservoirs)

Overcome By: 1.Control of pumping operations 2.Maintenance of altitude valves or float valves (but scheduled valve maintenance inefficient and ineffective i.e.. too early or too late.) 3.Reliable and cost effective monitoring system with minimal maintenance Battery powered devices GPRS & SMS communication Web-based monitoring with SMS alert

August Consumer Meter Management Customer Meter Inaccuracy 1.Meter changing program 2.More accurate meters at low flow 3.Installation procedure Unauthorized Consumption 1.Enforcements Meter Reading Errors 1.Minimize human errors 2.AMR Data Handling and Accounting Errors 1.Enhancement of CIBS softwares and hardwares

August NRW Reduction & Monitoring Alarm Fast Detection Fast Repair

August 15 Seremban Inflow & Metered Consumption

August 15 Hue water distribution management training Seremban Billed Consumption (m3/day)

August 15 Seremban NRW % Development

August 15 Monthly Water Saved With October 2006 as Baseline Reference

August 15 Accumulated Water Saved during Contract Period

August 15 Payback RM1.18 / cu.m RM saved during project period = RM3,325,985 RM saved per month after project = RM 642,240/month Repair work and monitoring cost per month = RM 370,000/month Project Cost = RM 14,000, Payback Period= (14,000,000 – 3,325,985) / (642, ,000) = 39.2 months

August 15 Water Balance ( % )

August 15 ILI Comparison

August 15 Cadangan Masa Panjang NRW Negeri Sembilan. Pengawalan berterusan zon kawalan selepas projek siap dilaksanakan. Meningkatkan jumlah & kecekapan kakitangan bahagian NRW SAINS Meningkatkan sistem aduan dan pembaikan kebocoran. Melaksanakan program NRW untuk seluruh Negeri Sembilan bagi mencapai NRW 15% menjelang tahun 2020 seperti yang disasar oleh Kerajaan Pusat. Penekanan kapada kualiti kerja dan bahan didalam projek projek bekalan air baru

August 15 TERIMA KASIH