MP was known for bad roads. Improper design based on traditional approach. Budget driven construction methodology in place of demand driven. Poor fund.

Slides:



Advertisements
Similar presentations
CFO – MANUFACTURING SECTOR
Advertisements

Estonian Road Administration overview of tasks related to public transport management 6 May 2013.
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.
MPRDC 1 MANAGING PPPs Institutional Framework for Contract Management and Monitoring Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure.
Vivek Aggarwal Managing Director, MP Road Dev. Corporation
PRESENTATION ON PUBLIC PRIVATE PARTNERSHIP (PPP) IN NATIONAL HIGHWAYS BySECRETARY, DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS GOVT. OF INDIA Conference of.
MPRDC 1 PPP in Madhya Pradesh Success Story of Roads Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure.
Showcasing Progress of Innovation in HIMACHAL PRADEH Himachal Pradesh Planning Department March 19, 2014.
THE OHIO RAIL DEVELOPMENT COMMISSION + THE CSX NATIONAL GATEWAY FHWA Talking Freight Webinar April 17, 2013.
Brief Overview of the Passenger Transport Sector in the Philippines Gilberto M. Llanto C.P. ROMULO HALL, NEDA SA MAKATI BUILDING May 7, 2013.
Public Transport in Saudi Arabia
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
1 Tanzania National Roads Agency TANROADS BRIEF OVERVIEW OF TANROADS Tuesday 29 th March 2011 Thursday 17 th June
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
Financing Urban Public Infrastructure
ECONOMIC & RISK ANALYSIS
Public Transport Investment financing
CROST FOR LONDON Presentation to GLA and TfL Thursday 4th Dec. By CROST Group.
MPRDC 1 Operation, Maintenance & Tolling in Road Sector : Potential, Progress & Way Forward Perspective of Madhya Pradesh Vivek Aggarwal MD MPRDC Connecting.
Commissioner, Indore Municipal Corporation
1 INSTITUTIONAL ARRANGEMENTS REFORM PROPOSALS AND DISCUSSIONS National civil society consultation August 2008.
Information Seminar on the Framework for Public Private Partnerships in Ireland Alexander Hotel, Dublin 3 rd June 2003.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
PPP in Lithuania March, 2011.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
Ease of doing business in Madhya Pradesh Ease of doing business in Madhya Pradesh
CPSMS Project Cell O/o Controller General of Accounts Ministry of Finance, New Delhi Welcome all Participants to the Workshop.
10 May 2015 Planning for BRT in Giza and New Cairo.
DMITREY MEDVEDEV PRESIDENT OF THE RUSSIAN FEDERATION: «Land must be made to serve residential construction». VLADIMIR PUTIN THE PRIME MINISTER OF THE.
Projectsunder JnNURM Scheme Construction of traffic transit management centres Procurement of buses.
REFORMS IN THE ROAD SECTOR IN KENYA Restructuring of Road Sub-Sector: Responding to Future Challenges Eng. Joseph N Nkadayo, MBS Director General, Kenya.
New Town Development and Urban Renewal
STRUCTURAL FUNDS MANAGEMENT IN GREECE: The experience of the Management Organisation Unit of the CSF Presented by: Dex. Agourides Director General M.O.U.
Think Regionally - Act Locally The Development and Evolution of the I-95 Corridor Coalition: Think Regionally - Act Locally John Baniak Executive Director,
Public transport on Estonia Arne Tilk. Public transport on Estonia 1. Is collective transport (in Estonia) considered as a service of general interest?
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Presentation on Strategies for Infrastructure Development in Karnataka By: V. P. Baligar.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
An Overview of the Philippine Ports Authority Atty. Oscar M. Sevilla Philippines 2008/TPTWG30/MEG/02 Agenda Item 12.
H\projects\controls\ekdilosi\tecnoman\ ppt Prospects of drafting Prospects of drafting Black Sea Ring Highway Black Sea Ring Highway Master Plan.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Sustainable public transport – electric transport development project for the capital.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
1 Department of Transport Report on the 2008 Local Government Budgets and Expenditure Review 2003/04 – 2009/10.
Aid for Trade Progress on the Initiative in 2007 and Report on the Mandate to ECA Stephen N. Karingi Chief, Trade and International Negotiations Section,
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Infrastructure Development Corporation Limited Risk Mitigation through Project Development Focus on Safer Airplanes in addition to better Parachutes Pradeep.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
1 Trends and Challenges of Local Finance Management in Malaysia by National Budget Office Ministry of Finance Malaysia 1 st Asian Public Governance Forum.
Telephone: Indian Roads and Highways: Trends & Opportunities ( )
Restructuring of the Finnish Infrastructure Administration Draft
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
Public Financial Management System
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
Committee on Climate Change
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
ASEAN PPP Summit The Public-Private Partnership Model and
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
European PPP Expertise Centre (EPEC)
Building a secure Home Affairs
Presentation transcript:

MP was known for bad roads. Improper design based on traditional approach. Budget driven construction methodology in place of demand driven. Poor fund flow for projects – low budget outlay. Result - Poor Connectivity, low industrial investment, sluggish business growth. 2

Government-embarked on program to revamp road sector. M.P. Bridge Corporation Ltd.  revived in December 2000 and  given mandate to upgrade highways on PPP Considering poor traffic, grant was made bidding parameter. Madhya Pradesh Infrastructure Investment Fund Board (MPIIFB) created to arrange funds for grant. Rs. 500 Crore (US $ 125M) outlined for the purpose. Approx km. Road length identified to be developed in phases. 3

Incorporated as wholly owned State Govt. Company under Companies Act 1956, in July State Highway Authority under the State Highway Act Mandated to develop, regulate and maintain highways with focus on PPP. The Chief Minister is the chairman, Minister of Public Works Department & the Chief Secretary are the Vice Chairmen, the Secretaries of the PWD, Finance, Forest, Urban Affairs and Mining Dept. are members on the Board. MD, MPRDC is also a director. 4

5

Invite private investment by providing grant to/ premium by / the concessionaire on competitive bidding 6

DetailsNo. of RoadsLengthCost BOT Projects Completed State Highways Completed State Highways (Toll + Annuity) Completed National Highways Completed MDR (Toll, Toll + Annuity, Annuity) In Progress State Highways In Progress State Highways (Toll + Annuity & Annuity) In Progress National Highways Proposed State Highways Proposed National Highways Annuity (MDR) Border Check PostsOne ROB Group IOne ROB Group IIOne-674 Length in km and Cost in Cr Rupees 7

Length in km and cost in Cr Rupees 8

Length in km and Cost in Cr Rupees 9

Takeover of entire state highway network including maintenance. To overcome the limitations of existing PPP model new financial models introduced. All remaining state highways were taken for development in different stages. Important Major District Roads also taken up to complete the network under PPP. Performance based maintenance introduced through OMT. MOU signed with MORTH for reconstruction of National Highways. 10

BOT (Toll) Model BOT (Toll + Annuity) Model BOT (Annuity) Model Deemed Shadow Fee Model OMT Model 11

Up-gradation and integration of 24 Border Check Posts in MP covering all State border crossings An integrated, real time system for Transport, Commercial Tax, Forest, Mandi & Mining departments Purpose of the project To increase the revenue of State Government. To control overloading & damage to state roads. To reduce leakage & corruption. To use technology for reduction in transaction time and ensuring complete transparency. Check posts to serve as facilitation centres 12

13 Automatic Vehicle Classifier Automatic Number Plate Reader Electronic Weigh Bridge Automatic Boom Barrier and Traffic Light

Airport at Singrauli is proposed with private participation. SPV – Singrauli Airport Corporation Ltd. Incorporated. Implementation Agency- MPRDC. 46 hectares land is available & 27 hectares is under acquisition. Consultant appointed. MCA of Planning Commission for Greenfields Airports will be adopted. 14

15

Concessionaire’s faith in MPRDC due to transparency in bidding process. Lender’s faith in MPRDC ensuring Financial Closure of BOT Projects. Deployment of Supervision and Quality Control Consultants with international expertise. Adequate Budget provision for Annuity &VGF payments by the State Government. Annuity payment along with bonus on due date. Experts like Legal Advisor, CA, CS, Environment expert, MIS expert, Road Data System Engineer are engaged in house. 16

Political commitment & support. Concessionaires are treated as partners. Bills are cleared in 2 to 4 working days. Land Acquisition and Environmental Clearances are planned and executed well in advance. Chief General Manager at Head Office & Divisional Manager coordinate with District Administration. NOC of State Forest Department, permissions for utility shifting, tree cutting permission etc are procured before Appointed date. 17

3-tier system of checking PMC of Concessionaire Independent Quality Control Engineer Officers of MPRDC Quarry approval after thorough testing. Field & lab testing is mandatory as per the norms of MORTH. Use of Graders for maintaining the camber at sub grade/GSB level. Crushed GSB Layer -1 (drainage) Coarse graded. Layer -2 Close graded. WMM in place of WBM with pavers. Use of Sensor Paver in place of mechanical paver for BT works. Use of RMC plant in place of normal concrete mixers. 18

During VFM analysis of MDRs, 22% Annuity for BOT (Annuity) Projects was envisaged. After bidding, the projects awarded on Annuity of 18.30% under BOT (Annuity) projects & 12.88% as on average under BOT (Toll+ Annuity) projects. 19

Project Details Total Project Cost $ Million Total Length of the Projects Km Average Annuity (actual) 18.30% of Project Cost 20

21

Implementation of ARS system on PPP mode. Technical Assistance through ADB for capacity building in road safety. Accident Response System & Traffic Management Centre including operation & maintenance for 5 years with estimated cost of Rs Crore (US $ 2.5 M) is being set up. ARS includes centralized call centre, GIS based automatic vehicle tracking system (AVTS), Computer aided dispatch system, Traffic Management Centre. Trial run started from 24 th Dec State wide number 1099 and Citizen portal available for assistance. 22

State Highway fund established under an Act for investment in highways & infrastructure projects. Executive Committee under the Chairmanship of Chief Secretary to administer the fund. 23

24

25

High travel demand, traffic congestion, accidents, pollution, rapid growth of city. No concept of bus stops and time schedules. To create a specialized and effective agency to monitor and provide intra-city public transport system. PPP model with Private investment in buses, ticket vending, O&M and ancillary services. Self-financing and revenue generating model for bus stops. Fully computerized ‘Ticket Vending system’. Every bus is fitted with GPS based tracking device with online data transfer facility. Upgraded to BRTS under PPP mode itself. Free from subsidy. Passenger information system is introduced for the first time in the country. Benefits : Savings in travel time. Reduction in congestion on roads. Reduction in road accidents. Reduction in environmental pollution. 26

“ “ “ “