Americas Region High Availability Electronics R&D Program FY06-07 DOE/NSF ILC Americas Program Review FNAL April 4-6 2006 Ray Larsen SLAC For Controls,

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Americas Region ILC Electronics Manufacturing Opportunities Linear Collider Industrial Forum of America (LFCOA) SLAC, May 1-2, 2006 Ray Larsen.
Americas Region Inductive Adder Modulators for ILC DR Kickers Craig Burkhart SLAC For SLAC-LLNL Team Ed Cook, C. Brooksby LLNL R. Cassel, T. Beukers, C.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Power Supply Controller Architecture
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
ILC Control and IHEP Activity Jijiu. Zhao, Gang. Li IHEP, Nov.5~7,2007 CCAST ILC Accelerator Workshop and 1st Asia ILC R&D Seminar under JSPS Core-University.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Redundancy. 2. Redundancy 2 the need for redundancy EPICS is a great software, but lacks redundancy support which is essential for some highly critical.
R. Kass US LC Conference 1 Design and Fabrication of a Radiation-Hard 500-MHz Digitizer Using Deep Submicron Technology R. Kass The Ohio State University.
ILC Electronics Manufacturing Opportunities ILC Industrial Forum at Fermilab September 21-22, 2005 Ray Larsen for SLAC ILC Electronics Group.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Tunnel Electronics Baseline Issues Snowmass Workshop August 25, 2005 Ray Larsen for SLAC ILC Group.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
SLAC ILC High Availability Electronics R&D LCWS IISc Bangalore India Ray Larsen, SLAC Presented by S. Dhawan, Yale University.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Operations, Test facilities, CF&S Tom Himel SLAC.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
SLAC High Availability Electronics Architectures & Standards for ILC The Case for Five 9’s Ray Larsen SLAC ILC Program.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
The recent history and current state of the linac control system Tom Himel Dec 1,
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Standard electronics for CLIC module. Sébastien Vilalte CTC
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
1 PEBB-based Power Electronic Systems to Support MVDC Studies Herbert L. Ginn III, Mississippi State University.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
HA Electronics Progress December R. Larsen For the Team.
ATF/ATF2 Control System
The ILC Control Work Packages
EDR HLRF Work Packages Draft Summary
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
General presentation about recent status of DRFS
Fast Kicker R&D in the Americas Region
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Junji Urakawa (KEK) for ATF International Collaboration
ATF project meeting, Feb KEK, Junji Urakawa Contents :
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

Americas Region High Availability Electronics R&D Program FY06-07 DOE/NSF ILC Americas Program Review FNAL April Ray Larsen SLAC For Controls, Instrumentation & Power Systems Collaborators

Americas Region April 4, 2006Electronics R&D Summary2 rsl HA Electronics Topics Control System Design Power Supply Systems w/ ATF Damping Ring Kicker w/ ATF Diagnostic Processor for Power Systems Controls & Instrumentation Standards Universal Accelerator Parser* Radiation Hard 500 MHz Digitizer** Radiation Damage Studies Electronics** *LBNL-Cornell Collab. ** University based Programs

Americas Region April 4, 2006Electronics R&D Summary3 rsl Control System Design [Argonne, SLAC, FNAL, DESY, KEK, Universities] Description –Evaluate High Availability designs for central computing, remote nodes, multi-gigabit serial communication systems based on dual redundant star configurations –Develop hardware, software models for top level, intermediate (sector) nodes and front-end applications Motivation –Controls BCD calls for High Availability design of hardware, software, networks, timing, RF reference, LLRF system for ILC to meet uptime goals.

Americas Region April 4, 2006Electronics R&D Summary4 rsl Controls Functional BD

Americas Region April 4, 2006Electronics R&D Summary5 rsl Controls Integrated System BD

Americas Region April 4, 2006Electronics R&D Summary6 rsl LLRF System BD

Americas Region April 4, 2006Electronics R&D Summary7 rsl Progress in FY06 Strong C&I collaboration established Controls lead at Argonne, LLRF lead at DESY & FNAL, Instrumentation lead at SLAC –Architectures studied versus block models of control system, LLRF, BPM, timing & RF reference applications –ATCA is platform for HA cost model; ATCA kits, memberships in PICMG (Standards Org.) purchased –Multi-tier software architecture development led by ANL –Planning in progress for cost modeling, estimates for RDR –Weekly Webex meetings with participation by ANL, FNAL, SLAC, DESY, KEK, Universities FY06 Budget –0.8 FTE, 132K$, funds available.

Americas Region April 4, 2006Electronics R&D Summary8 rsl Summary Plan

Americas Region April 4, 2006Electronics R&D Summary9 rsl HA ATF2 Modular Power Supply System [SLAC, KEK] Program –Phase 1 (FY06) – Demonstration Prototype 4/5 prototype capable of A>0.99 for ILC, hot swap w/ATF –Phase 2 (FY06-07) - 40 Magnet System for ATF2 SLAC provides engineering, coordination, test Parallel R&D on Redundant Bulk, Controller w/ failover –Phase 3 (FY08) – Installation & Training for ATF2 SLAC supports KEK installation, documentation, training Motivation –Non-HA Power Supplies chief source of downtime –Demonstration of technical, cost viability of HA design vital to achieving ILC up-time goals.

Americas Region April 4, 2006Electronics R&D Summary10 rslBulk Supply & Modules Ethernet Controller Test Magnet 100mΩ Resistive Load Phase 1 5kW HA Supply Test Setup P. Bellomo & B. Lam

Americas Region April 4, 2006Electronics R&D Summary11 rsl Frequency Response Transient Recovery 1 Module Switched Off B. Lam 5ppm8 Hrs Top: Resistive Load, 10 ms/cm Bottom: Magnet Load +100mΩ, 40 ms/cm Top: Resistive Load, A, Φ Bottom: Magnet Load + 100mΩ, A, Φ 20 ms 100 ms 8-Hour 10V/15V 9A/150A Module Current Sharing 1 Percent

Americas Region April 4, 2006Electronics R&D Summary12 rsl System Architecture ATF2 Phase 2 P. Bellomo

Americas Region April 4, 2006Electronics R&D Summary13 rsl Progress Summary Phase 1 initial tests successful, on budget, report in progress –Failure recovery of failed channel in 20 msec (resistive load) and 200msec (inductive load), stability over 8 hours 5 ppm –Hot swap feasible if needed. –Need to add diagnostics to power modules for failover, repair management Phase 2 development starting –40-unit system proposal pending KEK decision –Continuing development of redundant bulk (easy) and controller (harder) –4/5 Modules, A=0.88; add 1 of 2 Bulk, A=0.92; add 1 of 2 Controller, A=0.99 Budget –Phase 1 completed on budget [$30K] –Phase 2 beginning [$255K]

Americas Region April 4, 2006Electronics R&D Summary14 rsl R&D Summary Proposal

Americas Region April 4, 2006Electronics R&D Summary15 rsl HA ILC Kicker w/ATF [ SLAC, LLNL/Bechtel, KEK] Description –Demonstrate High Availability DR Kicker System Architecture Multiple units, system control of timing, background calibration, fast diagnostics, reliability, failover Motivation –Many groups working on kickers to optimize pulse shape, but overall system problems need attention. –Reliability/Availability of System ~ or more pulsers in series critical. –Induction modulator ideal balanced output (+/- 10kV) architecture but needs optimization for rise & fall time, impedance matching, stability of calibration, HA service features.

Americas Region April 4, 2006Electronics R&D Summary16 rsl Original Prototype Tested at KEK Pulse needs faster Tr, Tf, tail compensation E. Cook LLNL 20 nsec Integrated Driver & Power MOSFET

Americas Region April 4, 2006Electronics R&D Summary17 rsl HA Kicker System Topology pulsers will be needed in a High Availability topology with auto-failover and access for replacement C. Brooksby BN/LLNL Shield Wall Control/Timing/ Calibration Serial Links

Americas Region April 4, 2006Electronics R&D Summary18 rsl Program – Progress - Plans Program –FY06: Design 2 nd prototype with 5 nsec pulse width for 6 km ring operating at 3 MHz (330 nsec bunch spacing for 1 msec every 5 Hz), +/- 10 kV balanced output. –FY07: Build 3 rd prototype for full power 3 MHz operation; test ATF –FY08: Build multi-unit prototype system with control of precision timing, calibration, diagnostics; test at ATF2 Progress in FY06: –Help with Marx 2 nd order pulse flattening awaiting MOSFET-drivers –New Power MOSFET w/ drivers work starting –Higher voltage upgrade for KEK test in Fall 06

Americas Region April 4, 2006Electronics R&D Summary19 rsl Diagnostic Processor for Power Systems [SLAC, Pohang Accelerator Dept. (PLS)] Description –Generate trigger delays, pulse width for modulators, multi-phase rectifiers –Capture diagnostic waveforms via fast, slow ADC’s, on-board memory for fault diagnosis, set trip points via precision DAC –Monitor interlocks, temperatures, pulsed and DC V,I levels Motivation –Experience with multi-cell solid state induction modulators showed need for remote diagnostics and control at the cell level. –Traditional manual methods inadequate for the ILC. –Diagnostics in control room can predict, take actions needed to protect boards, prevent unnecessary machine trips

Americas Region April 4, 2006Electronics R&D Summary20 rsl Diagnostic Processors Marx Cell Front View 1 of 14 Marx Cell Rear View DP Mounting Ground Control Station (16 Ch)Control Computer Fiber Optics Pohang Prototype Marx Prototype

Americas Region April 4, 2006Electronics R&D Summary21 rsl Diagnostics Progress in FY06 First prototype designed, built to specifications; testing underway at PLS under MOU collaboration established SLAC refocused on Diagnostic Controller for Marx modulator –Cell voltages up to 120kV, very low power, small footprint –Marx units in production; firmware, testing underway; controls software engineer due to start in May. New Redundant Diagnostic Controller for HA power supplies –Conceptual design starting.

Americas Region April 4, 2006Electronics R&D Summary22 rsl HA Instrumentation Standards [Argonne, SLAC, FNAL, DESY, KEK, Universities] Description –Develop HA standard architectures for hardware and software, controls and front end instrumentation –Test critical features of hardware, applications software –Evaluate key applications, e.g. LLRF, BPMs, against candidate standard platforms –Main candidate: Advanced Telecom Computing Architecture (ATCA), A=0.999 at crate level. Motivation –Instrument standards essential for engineering, maintenance efficiency, low cost –New gigabit serial technologies provide opportunities to move designs to next generation technologies embraced by industry Progress –Working groups established, examining problems, opportunities for HA design in LLRF, BPM’s. ATCA evaluations getting underway.

Americas Region April 4, 2006Electronics R&D Summary23 rsl ATCA Starter Kits 5-Slot Crate w/ Shelf Manager Fabric Switch Dual IOC Processors Rear View 16 Slot Dual Star Backplane 4 Hot- Swappable Fans Shelf Manager Dual IOC’s Fabric Switch Dual 48VDC Power Interface

Americas Region April 4, 2006Electronics R&D Summary24 rsl Instrument Standards Plan & FY06 Budget Labor funds unused to date due to lab Engineering priorities.

Americas Region April 4, 2006Electronics R&D Summary25 rsl Development of Universal Accelerator Parser, D. Bates, LBNL Develop tool for parsing lattice analyses data from different codes into standard format for information exchange. FY06 Budget $21K Program Goals (LBNL MOU Addenda, Collab w/Cornell) –Prototype converter to/from Accelerator Markup Language AML – March 06 –Distribute Parser – Sept. 06 Progress –AML Draft distributed Sept 05 –MAD to AML translator developed –Project proposed to continue at same level in FY07

Americas Region April 4, 2006Electronics R&D Summary26 rsl _03: Design and Fabrication of a Radiation- Hard 500-MHz BW Digitizer Using Deep Submicron Technology, K.K. Gan, Ohio State U FY2006 Award: $75,000, FY07 Request $64,000 Program: Develop 500 MHz BW 12 bit (11 Effective bit) 2 GS/s digitizer in deep submicron technology Pipelined approach four 3-bit stages with interleave Progress: –3-bit cell designed and simulated –To date could not achieve 12 bits with rad-hard cells. Without correction limited to 6-8 bits. Hardware correction gets 10 bits precision. Calibration needed beyond. Continuing cell development. –Plan 1st silicon submission in 06, rework, 2 nd run in 07.

Americas Region April 4, 2006Electronics R&D Summary27 rsl _09: Radiation Damage Studies of Materials and Electronic Devices Using Hadrons David Pellet, UC Davis Hadron irradiation of NdFeB permanent magnets, electro-optical devices in detector readout, CCD’s for vertex detector, accelerator control devices FY04-FY06 program; FY 2006 Award: $38,000 Progress –Testing NdFeB 3-block sample field degradation, 3 manufacturers, 10kGy gammas & 1 kGy 1 MeV neutrons; series of 1 MeV neutron exposures –Starting electro-optics exposures - transmission vs. wavelength irradiated and standard samples –7 runs done, 5 more planned for NdFeB next 6 months

Americas Region April 4, 2006Electronics R&D Summary28 rsl RDR Status Controls & LLRF Converging on Cost Models –LLRF will draw from DESY, SNS design, cost experience –Cost, technical guidance needs to be prescriptive & clear – Standard worksheets –Main issue - Converge quickly on new models for HA hardware, software; select cost strategies Power Systems Cost Models –HLRF – Have firm manufacturing models for klystrons, modulators. –Distribution - Problematical to optimize manufacturing assemblies to avoid expensive off-the-shelf components –Power Supplies – HA models with industry quotes or actual pricing on key components. –Controls - Unique adaptation of existing Ethernet control designs. –Kickers – Use induction model.

Americas Region April 4, 2006Electronics R&D Summary29 rsl RDR Plans, Resources Roadmap to RDR –Each subsystem group develops cost models –Data collected by standard rules, formats for WBS rollups –DCB designated team does top-level rollup –Additional key people assigned subsystem writing tasks for RDR Resources –RDR support drawn from high-level engineers in Technical Systems & Global Groups –Will impact R&D work –Not specifically called out as line items in budgets –Estimate 1 FTE per major system Regional Differences –Assume Region-specific comprehensive estimates with communication, sharing of information between Technical, Global groups. However must agree on BCD models.

Americas Region April 4, 2006Electronics R&D Summary30 rsl Summary R&D Programs for FY06 on track for most important cost drivers – Modulators, power supplies Lagging in applying resources for controls and instrumentation standards –In-house help promised soon –Exploring outside university collaboration assistance –Need close support of additional people in Controls architecture & software. New resources in FY07 proposal for this purpose. RDR Roadmaps being developed for major systems –Models still under development; guidelines still in development, no costing started. Meeting RDR fast track costing very challenging, needs tight collaboration & will impact key R&D resources.