1 Asia Singapore Building and Construction Authority (Building Engineering Division) Managing Geotechnical Risks – are we learning from our failures 29.

Slides:



Advertisements
Similar presentations
SITE INVESTIGATION.
Advertisements

Foundation Engineering CE 483
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
A2 Unit 4A Geography fieldwork investigation Candidates taking Unit 4A have, in section A, the opportunity to extend an area of the subject content into.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
8. Axial Capacity of Single Piles
Soil & Site Investigation
Internal Audit Documentation and Working Papers
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
INTRODUCTION Session 1 – 2
Design Parameters.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Geological Problems Encountered and Solutions Implemented
2014 National RAC and TRB State Representatives Meeting
1 Asia Managing Geotechnical Risk Learning from the Failures “Issues related to the use of Numerical Modelling in Design of Deep Excavations in Soft Clay”
National Commission for Academic Accreditation & Assessment Preparation for Developmental Reviews.
1 Asia Managing Geotechnical Risk Are we learning from the failures “ The Use of Instrumentation and Monitoring to Verify Design and Control Construction.
Results of January 2007 Meeting of Working Group on the Questionnaire and Indicators 24 January 2007.
The reform of A level qualifications in the sciences Dennis Opposs SCORE seminar on grading of practical work in A level sciences, 17 October 2014, London.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Soils Investigation Soil Investigation
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
SITE WORKS SITE INVESTIGATION AND SOIL INVESTIGATION
Radiopharmaceutical Production
IRSC 2009 Båstad Learning from failure: Research initiatives towards improving safety and reliability of the Swedish railway system Alexander Wilhelmsson.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
1 Asia Singapore Building and Construction Authority (Building Engineering Division) Managing Geotechnical Risks – are we learning from our failures 29.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
Steps in Foundation Engineering Understand project and site Develop design criteria Identify possible foundation alternatives Conduct soil investigation.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
© WRc plc 2010 Agenda item 3b: Summary of WISE electronic delivery: presentation of an example.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
SITE INVESTIGATION.
A KINEMATIC HARDENING MODEL WITH DEGRADATION OF STRUCTURE – APPLICATION TO SOFT NATURAL CLAYS Béatrice A Baudet University College London.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
International Levee Handbook Overview of the handbook Chapter 7 Site characterisation and data requirements.
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Writing and updating strategic and annual plans Richard Maggs Astana September 2014.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Prepared By: Aya Edaly Bara’a Salhab Saja Janem Huda Qaddara Supervisor: Dr. Isam Jaradaneh Site Investigation.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Guidance on approach to beach modelling.
Principal Investigator ESTCP Selection Meeting
Geotechnical Engineering II
Lead discusser: Yu Wang
World Health Organization
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
IRSC 2009 Båstad Learning from failure: Research initiatives towards improving safety and reliability of the Swedish railway system Alexander Wilhelmsson.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Principal Investigator ESTCP Selection Meeting
Soil & Site Investigation
ICAO AFI Plan African ANSP Presented by: ESAF Regional Office
Recommendations for using this ‘framework’ template
Safety Management System Implementation
Project Management Chapter 11.
Principal Investigator ESTCP Selection Meeting
PAT GEOTECHNIC INTRODUCTION TO GEOTECHNICAL ENGINEERING.
Scott McFarlane & Richard Merifield
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

1 Asia Singapore Building and Construction Authority (Building Engineering Division) Managing Geotechnical Risks – are we learning from our failures 29 th September 2006 Andy Pickles & Tom Henderson Geotechnical Consulting Group (Asia) Ltd.

2 Asia Contents Overview of the management of geotechnical risk (Tom Henderson) Overview of the management of geotechnical risk (Tom Henderson) Overview of deep excavation practice in Hong Kong (Tom Henderson) Overview of deep excavation practice in Hong Kong (Tom Henderson) Comment on the scope and reporting of site investigations (Tom Henderson) Comment on the scope and reporting of site investigations (Tom Henderson) Design aspects for deep excavations and in particular the use of numerical modelling (Andy Pickles) Design aspects for deep excavations and in particular the use of numerical modelling (Andy Pickles) Instrumentation to verify design and control during construction of deep excavations (Andy Pickles) Instrumentation to verify design and control during construction of deep excavations (Andy Pickles) Miscellaneous lesson learnt from the investigation into Nicoll Highway collapse (Andy Pickles) Miscellaneous lesson learnt from the investigation into Nicoll Highway collapse (Andy Pickles)

3 Asia Site Investigation Site Investigation is a continuous process - particularly for major projects Site Investigation is a continuous process - particularly for major projects must have multiple phases must be planned and structured for complete duration of project must have adequate budget must be justifiable

4 Asia Site Investigation Onus is on geotechnical engineers to demonstrate the value of continuity of site investigation to project managers Onus is on geotechnical engineers to demonstrate the value of continuity of site investigation to project managers Requires stand alone document introduced at inception of project that is updated as project evolves - relates ground condition uncertainties to elements of design and construction that are particular to project needs - and how these uncertainties will be addressed Should be driven by ground conditions “Risk Register”

5 Asia Site Investigation Principal Objectives Principal Objectives provide adequate information for a safe economic engineering design provide information to plan most appropriate method of construction and how to deal with difficulties anticipated during construction

6 Asia Phases of Site Investigation for Management of Geotechnical Risk Preliminary ground investigation to compliment feasibility studies Preliminary ground investigation to compliment feasibility studies Main ground investigation to provide input to engineering design – and envisaged method of construction Main ground investigation to provide input to engineering design – and envisaged method of construction Allowance for supplementary investigation prior to construction that addresses anomalies/uncertainties arising from the design process Allowance for supplementary investigation prior to construction that addresses anomalies/uncertainties arising from the design process Additional investigation during construction (eg instrument installation - the best site investigation available) Additional investigation during construction (eg instrument installation - the best site investigation available) Collation and interpretation of as-built conditions (pile installation records, slope mapping etc) Collation and interpretation of as-built conditions (pile installation records, slope mapping etc) Essential

7 Asia Optimum Cost of Site Investigation for Major Projects

8 Asia Costing Site Investigation Precedent suggests overall SI costs in Asia rarely exceed 1% of civil construction costs Precedent suggests overall SI costs in Asia rarely exceed 1% of civil construction costs USNCTT (1984) recommends 3% for tunnel projects JLE Costs possibly >4% (not directly comparable) LTA NEL Costs recorded as <0.5% (Shirlaw et al, 2002) Hong Kong – major projects – around 1% Is this total cost – does it include contractor’s SI during construction? Does it include for all interpretation?

9 Asia Examples of Representative Cost/Value of Site Investigations for Major Tunnnelling Projects (Westland et al, 1998) Lower risk of cost over-run

10 Asia Planning Site Investigations for Major Projects Balance spatial constraints with engineering requirements avoid over application of uniform spacing Consider “clustering” approach Be realistic with laboratory testing schedules match the quality of the test with the quality of the sample ensure there is sufficient information on basic properties to allow adequate interpretation of sophisticated tests

11 Asia Uniform Spacing v “Clustering” for SI Use closely spaced “clusters” of SI to obtain continuous samples fully logged profile of ground calibrate in-situ tests (eg CPTs) with fully logged borehole obtain high quality samples for full range of laboratory testing (ie basic indices combined with sophisticated strength tests Benefits Extrapolate results to wider spaced in-situ testing andbasic lab testing using reliable site specific correlations This can often be cost effective on large projects

12 Asia Outcrop of Lambeth Group Jubilee Line Extension - London

13 Asia General Sequence of Lambeth Group in Central London Up to 25m

14 Asia JLE - Issues Associated with Lambeth Group Identified at Desk Study Engineering interpretation was interebedded sands, silts and clays 15 to 25m thick -variable properties oversimplified and too inconsistent for major tunnelling works Previous experience indicated a problematic, high risk material for tunnelling and deep excavations low OCR material and variable K 0 significant lateral and vertical lithological variation localised deposits of cemented material and/or pebble beds evidence of perched water tables Geologists had the basis for a well-developed model based on depositional history but no engineering parameters Project site investigation had to correlate geological model with engineering interpretation to establish reference ground conditions for contract and provide representative parameters for engineering analyses

15 Asia JLE - Actions taken to address risk/uncertainty on Lambeth Group during SI prior to design & construction Selective high quality site investigation Selective high quality site investigation Triple tube rotary coring full depth in Lambeth Group Large number of samples split and logged In situ testing involving piezocones/self boring pressuremeters Definitive classification of sub-units Definitive classification of sub-units Detailed logging of recovered full depth cores BGS logging of full sequence Logging teach-in for all SI contractors Laboratory Testing Programme Laboratory Testing Programme Large number of basic tests for material classification High quality undisturbed samples for advanced laboratory testing Laboratory testing regime to shadow insitu testing

16 Asia JLE - What was achieved in terms of addressing risk/uncertainty associated with Lambeth Group Information available to Designers and Contractors Information available to Designers and Contractors Boreholes logs containing detailed and consistent descriptions of principal lithology Large volume of measurements of engineering properties for each of the sub-units Interpretative Report for permanent and temporary works design Engineering Interpretation Engineering Interpretation Influence of structure and fabric on engineering behaviour highlighted

Axial strain (%) UU triaxial compression tests on Bothkennar Clay, m (Hight, personal com 2006) Destructuring conventional modified Tube type 500mm "ELE" All advanced in borehole Japanese standard Block Sherbrooke Reduction in p' i (  a -  r )/2 (kPa) (  ’ a +  ’ r )/2 (kPa) 15% reduction Example of the effects of sample disturbance – soft clay

18 Asia Effects of sampling method in UU triaxial compression tests on Upper Mottled Clay, Lambeth Group (Hight, personal com 2004) Rotary core samples Driven tube samples Example of the effects of sample disturbance – stiff clay

19 Asia Reporting/Interpretation of site investigation test data

20 Asia Results of engineering study on Lambeth Group (Hight, personal com 2004) Results of engineering study on variable stiff clays

21 Asia Inception/ Planning Factual Report Interpretation and Review of Data Interpretative Report – Detailed Ground Model, Ground Parameters and Engineering Implications Design Recommendations Design Report Construction Monitoring, Maintenance and Decommissioning Validation Report – Geotechnical Structures Manual Ground Investigation, Fieldwork and Laboratory Testing Desk Study Conceptual Ground Model Guidelines for the preparation of the Ground Report (AGS, 2003) Form of Geotechnical Reporting Continuous Review of geotechnical uncertainty/ geotechnical risk register Ground Investigation, Fieldwork and Laboratory Testing & Factual Report

22 Asia Site Investigation & Reporting - Summary Site Investigation is not a one-off exercise on major projects – continuous iterative process Must be driven by “uncertainty” associated with the ground conditions and how this impacts on design and construction – Risk Register Should have flexible approach – avoid blanket application Reporting should reflect increasing level of knowledge and interpretation

23 Asia Thank you