Dec. 2005E-upgrade GDE Frascati1 “Energy Upgrade Scenario TG” Report L.Lilje, T.Raubenheimer and N.Toge Full Report:

Slides:



Advertisements
Similar presentations
NLC - The Next Linear Collider Paul Czarapata Engineering Test Facility What is it and what does it do?
Advertisements

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
1 Collaboration%20Meetings/SMTF%20Collaboration%20Meeting.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Proposed machine parameters Andrei Seryi July 23, 2010.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
1 Tunnel implementations (laser straight) Central Injector complex.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Date Event Global Design Effort 1 GDE CCB Remarks on  GDE Meeting, Vancouver, July, 2006 Nobu Toge (CCB/KEK)
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
NCC meeting Aug 5, 2008 richard seto. doe report received /
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Main Linac Issues for RDR 1/20/2006 Area group H. Hayano From Linac Area discussion posted on the web:
1-2 May 2006 LCFOA Mtg Global Design Effort 1 The Baseline Configuration and the Reference Design Report Tor Raubenheimer SLAC.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
S2 Progress Report for EC H. Padamsee and Tom Himel For the S2 Task Force.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Cost Optimization Models for SRF Linacs
ILC - Upgrades Nick Walker – 100th meeting
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Staging in the TDR.
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Accelerator Layout and Parameters
XFEL Project (accelerator) Overview and recent developments
Cost Optimization Models for SRF Linacs
Electron Source Configuration
W. T. Weng Brookhaven National Laboratory
BDS civil construction Single IR upgrade scenarios discussion
LAL meeting on e+ studies, Oct. 2010
MEIC Cost Estimate Overview
Bunch Compressor Beam Line Optics
Presentation transcript:

Dec. 2005E-upgrade GDE Frascati1 “Energy Upgrade Scenario TG” Report L.Lilje, T.Raubenheimer and N.Toge Full Report: e_papers:white_papers_home e_papers:white_papers_home Additional info:

Dec. 2005E-upgrade GDE Frascati2 Option 1234  1 Tunnel ~41km ~22km~41km  1 Linac Installation ~22km Upstream Half ~24.4km Upstream Half ~22km Whole ~22km Sparcified  1 Nominal Gradient w. full current 31.5MV/m28MV/m31.5MV/m  1 Energy Reach 500GeV500GeV (~560GeV w. reduced current) 500GeV Options that were considered

Dec. 2005E-upgrade GDE Frascati3 Option 1Option 2Option 3Option 4 Can the RF sources and cryogenics for Phase-2 be installed during Phase-1 operation? Yes NoYes During Phase-1, is significant flexibility still reserved for the details of the Phase-2 RF and cryosystems? Yes Yes, but mildly limited, because of the fixed geometry. Setup of machine in initial phase (machine protection, quench handling etc) -Easier than Options 1, 3, 4 -- CMS Energy with 20% margin on accelerating gradient (i.e. 28 MV/m) 450 GeV500 GeV450 GeV Do impacts of Phase-2 tunnel excavation during Phase- 1 operation need to be evaluated? No YesNo Is recommissioning needed for e- sources (and likely DRs) in Phase-2? No YesNo Can the benefits of diagnostic section be accommodated? Yes Yes, also built-in rooms during Phase- 1. Any issues with 31-36MV/m hybrid operation?OK Any issues with ~40MV/m hybrid operation?OK

Dec. 2005E-upgrade GDE Frascati4 Option 1Option 2Option 3Option 4 Cost Ratio (reported at Snowmass 2005) - Phase-1 Construction - Phase-2 Upgrade - Phase-1 & 2 Total Construction Cost Ratio (when linac costs for linac cavity systems, including the cryostats, and tunnels are independently varied by up to 40%) - Phase-1 Construction - Phase-2 Upgrade - Phase-1 & 2 Total Construction 1.13~ ~0.79 ~ ~ ~0.73 ~ ~0.92 ~ Ratios of the “Guesstimated” construction cost for the linac HW and the linac tunnels. Note 1: No costs included for FFs and Inj, DR ! Note: 2: No costs included for possible RF rework in Phase 1  Phase 2, for instance, with Option 2 !!

Dec. 2005E-upgrade GDE Frascati5 Recommendations as submitted to GDE EC Recommend Option 1 –Option 1 offers good operability during Phase-1, adequate provision for beam diagnostic capabilities and ability to accommodate upgraded SRF hardware components relatively seamlessly. –Option 1, being conceptually the simplest among the schemes considered here, helps GDE develop the solid understanding of the practical fundamentals of the engineering designs and the cost analyses the most rapidly. –Much of the understanding on the engineering and the cost, to be gained from the exercise with Option 1, can be readily applied to examine the technical and cost implications of other Options soon thereafter, if deemed adequate.

Dec. 2005E-upgrade GDE Frascati6 Remarks to GDE EC (1) Concerning Option 3: –Option 3 offers the lowest cost for Phase-1 yet it requires the highest cost for the whole Phases 1&2, because of the staged civil construction and relocation of the injector systems. –Phase-2 upgrade for Option 3 is likely to take the longest time period, because of, again, the staged civil construction and the fact that the installation of RF source components cannot start till the extension tunnels are complete. –The relative merit of Option 3 will have to be looked at in the context of the project acceptance from the political or long-term financial standpoint. Such analysis can be done after the complete Option 1 study is done. (NT comment: Implications on the prospects for physics programs also need to be looked at, but our TG report did not specifically touch on it).

Dec. 2005E-upgrade GDE Frascati7 Remarks to GDE EC (2) Concerning Option 4: –Option 4 offers the operability and upgradeability similar to those of Option 1, plus substantially more diagnostic sections during Phase-1. –At this point, however, the task group does not see convincing technical justification for this option.

Dec. 2005E-upgrade GDE Frascati8 Remarks to GDE EC (3) Concerning the Energy and Acc Gradient: –Assumed accelerating gradient of 31.5MV/m for Phase-1 and 36MV/m for Phase-2 are a major challenge. –Vigorous, coherent and organized international collaboration programs are mandatory to establish especially the quality control measures which reduce the performance scatter currently observed. –A detailed list of R&D topics has been established in the WG5 Snowmass reports, as well as in BCD.