7 October 2002 - All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.

Slides:



Advertisements
Similar presentations
Mayukh Das 1Louisiana Tech University For the 2004 D0SAR Workshop Activities with L3 and the Higgs By : Mayukh Das.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University ICD Update: January Shutdown Work Lee Sawyer On behalf of Andy White, Mark Sosebee,
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
July 7, 2008SLAC Annual Program ReviewPage 1 High-level Trigger Algorithm Development Ignacio Aracena for the SLAC ATLAS group.
1 Adjustments to D  ’s Run IIa measured luminosity G. Snow / University of Nebraska for the D  Luminosity Group 29 November 2006 OK, you asked for it.
How to Replace Your Desktop PC’s Power Supply Computer Based Training Objectives.
Elastic Scattering at s=1.96 TeV Using the DØ Forward Proton Detector
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
1 Modelling parameters Jos Vermeulen, 2 June 1999.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Lishep06 Gilvan Alves1 Overview of Diffraction from DØ Gilvan Alves Lafex/Brazil  Introduction  DØ RunI x RunII  Special Runs  Outlook.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
Level 3 Trigger Leveling D. Cutts(Brown), A. Garcia-Bellido(UW), A. Haas(Columbia), G. Watts(UW)
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
August 12, 2003ElizabethGallas / TriggerExposureRules 1 Rules for Triggers in Exposure Groups Elizabeth Gallas Fermilab Computing Division Michael Begel.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
CMS Week Sept '07Leonard Apanasevich (UIC) Pedrame Bargassa (Rice) 1 Physics Priorities for Trigger Development Leonard Apanasevich (UIC) Pedrame Bargessa.
Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Penny Kasper Fermilab Heavy Quarkonium Workshop 21 June Upsilon production DØ Penny Kasper Fermilab (DØ collaboration) 29 June 2006 Heavy Quarkonium.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Project Manager’s Report + DC/MoM Report
IC40 Physics Run Preparations
Kevin Burkett Harvard University June 12, 2001
The Silicon Track Trigger (STT) at DØ
Presentation transcript:

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating efficiency –Delivered: 3.6 pb -1 –Recorded: 2.4 pb -1 (~66%) –5.9 million physics events to tape –4.7 hours of downtime Issues caused >20 min downtime –Muon PDT readout problems Controlled Accesses: 15 m on Oct 4 & 20 m on Oct 6 to power cycle crate –Special Runs Study muon detection efficiency Study L2 CAL Jet Algorithm –Tevatron Scraping (Oct 4 owl shift) Accelerator halo –Ok at beginning of store, but Pbar rates steadily rise within ~30 min –Spikes in 1 st hour of Stores 1808 (Oct 2 beginning eve shift) 1823 (Oct 4 beginning owl shift) 1824 (Oct 4 end day shift)

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University2 Data Taking Statistics **Preliminary** Total Data Taking Efficiency  65.5% –325.7 nb -1 or 9.0% Lost due to Downtime – nb -1 or 33.4% Lost due to Deadtime Decorrelated (L2/L3/COOR Disables) Correlated (FEB, SkipNextN) –38.9 nb -1 or 1.1% Lost at L2/L k Events from Physics Runs recorded to tape –global_CMT-8.30: 1924 events through Store 1823 –global_CMT-8.40: 3952 events from late day shift Oct 4 Still developing tools to understand all the sources of deadtime.

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University3 Best Days by Recorded Luminosity

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University4 Calorimeter Preamp Cooling

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University5 Replacement of Cooling Fans Reminder: Week of Sep 23 rd D0 lost cooling in one of the Calorimeter preamp boxes –Temperature of the cooling air increased from 40°C to 69°C –Affected ~4% of calorimeter channels  12% of central calorimeter channels We requested Supervised Access for Wed Oct 2 of hours –4 hours each to open and close 1,000 tons muon magnets –4-8 hours to disassemble box and replace failed fan(s) Began SA at 04:30; South & East EF Open at 06:30 Closed detector from 14:30-16:30 Search & Secured by 19:00 Each Fanout Box has one large fan & two smaller fans near the heat exchanger Large fan was dead – black dust in surrounding area –Probably the source of mysterious VESDA alarm in the recent past Smaller fan mounted on the heat exchanger also dead –We think it failed after the larger fan –Overworked due to large fan failure Replaced other small fan as a precaution Exchangers & fans built as one “unit” –Small fans were tricky & we were missing a special screw & nut –Work delayed by 1.5 hours by special trip into Chicago

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University6 Calorimeter Preamp Fans Postmortem on large fan –Windings opened up – likely a manufacturer defect Both smaller fans were bushing fans –Fans were dry and could not turn! –We had ordered ball bearing fans –Manufacturer sent the wrong fans They were labelled correctly, but the labels were not visible because of the casing All Calorimeter preamp cooling fans were procured & assembled using Columbia Univ. base grant money There are 72 total fans –24 large & 48 small –L10 = 85k hours for small fans & 55k hours for large ones Fanout box put constraints on size and number of fans –Maximally push air through heat exchanger in rectangular volume We may simply need to replace ALL fans every year as a preventative measure –Assuming shutdown > 1 week –New fans have been ordered Still looking through the archiver –Looking at a step function in the temperature –Correlate to VESDA alarm(s)?

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University7 Other System Work 30 New L3 farm nodes installed on Sat Oct 5 th –Double processing power! –This permits us to significantly raise our L2 output rate Back pressure from farms would deny L3 accepts –Increase our L3 rejection on single muons New online Linux PCs & flat screen monitors to be installed –Substantial increase in CPU & Memory –Many old nodes are overloaded FPD Tunnel Access during Wed Shutdown –Installed 6 new TLDS –Previous TLD readings from 10 days in Aug (in REM) –L0 (lime glass) tubes sensitive to levels > 10 8 REM –MAPMTS (Borosilicate window) 10% loss in transmission at levels > 10 5 REM –Helium levels are an issue (~1000 ppm). May need special tunnel access to install air hoses to blow fresh air.

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University8 New Trigger List global_CMT-8.40 – Store 1824 on Fri Oct 4 th end of day shift –L1: Calorimeter EM and JET tower triggers and MUON triggers based on central and forward muon scintillator detectors. –L2: EM, JET, MUON, and angular separation filters. –L3: Electron, Jet, Tau and Muon filters, some of which use the central tracking systems. Changes from global_CMT-8.30: –Muon events at L3 – Changed from mark & pass of 1 to pass all Each time the script ran – whether event passed or failed filter - debug information was added, increasing event size –Expect to see a drop in event size of factor of 2 for these type of events –Added more L2 rejection to 2 tau & 1 top trigger –Removed obsolete jet triggers –Increase L1 output rate by 10%

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University9 Store 1808 L1~450 Hz L1 output Rate in Hz L2 output Rate in Hz L1 FEB Rate in Hz

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University10 Store 1824 L2 CAL & Muon Special Runs Pbar Spikes Store 1824 ended ~05:30 Oct 5th Store 1825 began ~ 08:15 Oct 5th L1~500 Hz

7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University11 Plans for Upcoming Week Continue with trigger list global_CMT-8.40 –We are conservatively increasing our L1/L2/L3 output rates without sacrificing stability Baseline before this past weekend at the beginning of physics run: L1~ , L2~ , L3~40-45 Hz Stores –L1/L2/L3 ~ / /50-55 Hz »75-80% efficiency of Recorded/Delivered Lumi No urgent jobs requiring Controlled Access Looking forward to a full week of steady physics data taking!