Status of the SESAME Machine

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

Machine-Status Outline: Organization Financial aspects
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
SESAME SESAME RF SYSTEM Arash Kaftoosian.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
SESAME SESAME = Synchrotron-light for Experimental Science and Applications in the Middle East 1 Bodrum, UPHUK-5, Sep..2013, Erhard Huttel.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, SESAME STATUS TAC 2012 Synchrotron light Experimental Science Application Middle East.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Scientific support Scientific laboratories have the qualified specialists in fields of accelerator physics and technique. They calculate and model the.
CESSAMag: magnets for SESAME Attilio Milanese CERN.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
M. Attal, 10 th Technical Advisory Committee Meeting, May 10-11, 2010, Allan, Jordan Synchrotron-light for Experimental Science and Applications in the.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
SiriusUVX LNLS – National Synchrotron Light Laboratory CNPEM – Brazilian Center for Research on Energy and Materials A R Rodrigues, M Lisboa, R Madacki.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PETRA III, A New High Brilliant Light Source At DESY
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
20. ESLS Workshop, HZB, Nov.2012 STATUS ANKA Outline:General Insertion NANO ………..CAT-ACT …………CLIC Control-System-upgrade Short bunches: EOS …………………Flute.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
O. Kester, NuSTAR annual meeting, 27/02/2013
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ELENA installation progress F. Butin / ELENA collaboration.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Report Technical Director Storage-Ring-Installation Completed
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
ELENA installation and commissioning status
A.Lachaize CNRS/IN2P3 IPN Orsay
Low Emittance Rings 2014 Workshop
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Coupling Correction at the Australian Synchrotron
SESAME-On The Way To Become Real
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
ALIGNMENT STRATEGY OF SESAME T. Abu-Hanieh, SESAME, Jordan
Injector Performance Requirements Conventional Facilities Update
Operation Progress and Upgrade in SSRF
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Advanced Research Electron Accelerator Laboratory
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status of the ASTRID2 RF systems
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

Status of the SESAME Machine Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

ANKA 2002: 7 beamlines bend 2012: 13 beamlines bend 2 insertion Energy 2.5 GeV Current 0.4 A Periods 8 DBA Circumference 110.4 m Emittance 50 nmrad Radiation loss 0.64 MeV Nat. Chroma. h / v -13 / -8 Tune horiz. / vert. 6.8 / 2.7 Momentum Comp, 0.01 2002: 7 beamlines bend 2012: 13 beamlines bend 2 insertion 2014: 13 beamlines bend 5 insertion Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

The means have become available to built up SESAME now! Israel, Iran, Jordan, Turkey committed to contribute 1.25 M$ next four years. Pakistan committed to comparable in kind contribution. CERN/EU contribute 5 M€ for the purchasing of the magnet system Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Financial Aspects till 2016 Injector-upgrade 0.9 M€ Magnets and PS:5.0 M€ Girder: 0.8 M€ Vacuum: 3.0 M€ RF: 3.0 M€ Diagnostics: 1.5 M€ SR-Cooling: 0.5 M€ Cabling: 0.5 M€ Commissioning: 1.5 M€ Control-System 1.1 M€ Safety P+A 0.8 M€ Front-Ends: 0.5 M€ Sum [€] 19.0 M€ Sum [$] 23.3 M$ 10% 25.6 M$ Income EU-CERN: 5.00 M€ Jordan: 4 x 1.25 M$ Turkey: 4 x 1.25 M$ Israel: 4 x 1.25 M$ Iran: 4 x 1.25 M$ ? Pakistan: in kind contribution? USA? Norwegian? Machine: 25.6 M$ 4 Beamlines upgrade: 8.7 M$ Guesthouse+ 1.3 M$ Sum 35.6 M$ Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Operational-Cost-Development Power: Based on 4000 h operation time, 1GWh / y Salary: Increase 35-75 employees Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

SESAME-Design Beamlines first day: 3 bend, 1 insertion Microtron 0.022 GeV Booster 0.8 Energy-SR 2.5 Current 0.4 A Periods 8 DBA Circumference 133.2 m Tune horiz. / vert. 7.25 / 5.19 Nat. Chroma. h / v -14 / -14 Emittance 25 nm Mom. Comp. 0.008 Radiation loss 0.6 MeV Beamlines first day: 3 bend, 1 insertion Beamlines phase one: 5 bend, 2 insertion Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Organization Machine-Physics Cooling/Vacuum Electronics/Electric Maher A. Open position 2012. Cooling/Vacuum Firas Osama Adel Saed Electronics/Electric Sofian (Power supplies) Ifikhar (pulsed PS) Yazeed (beam-lines) Farouq (beam-lines) New position Nov.2012 (Electric) Beamlines XABS:Messaoud IR: Ibraheem Open Position 2012 Computing Salman Mustafa Control Zia Ibrahim Open position 2012 Design/Mechanics Maher S. Thaer Akrum Mohammad Ahmad Open position 2012 N.N. RF/Diagnostics Darweesh Nashat (RF) Alaa (RF) Hussain (D) Radiation-Safety Adli Morteza Administration Majeda (Purchasing) Sonia (Assistant) Ayman (Human resources) Ibrahim (Accountant) Abd Al (Bus-driver) To be solved: Cooperation Computing/control Group member from different sections. Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Responsibility of technical sector for beamlines? Strategic Plan: 2.2 Project organization The task of the Technical Sector is to design, build and operate the machine from the microtron to the front ends. The shielding wall between the storage ring and the experimental hall is the border line that separates what falls within the responsibility of the Technical Sector and what lies with the Scientific Sector. Nevertheless, though the installation of beamlines would normally be within the purview of the Scientific Sector it has been decided that provisionally the technical team will be in charge of this due to the lack of staff in the Scientific Sector. Beamlines will be built individually in coordination with the corresponding beamline scientists. In any cases: We need one beamline-scientist for each BL to built it up! Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Status Accelerators: Microtron is running Booster built up started (expect operation end 2013) Storagering: Magnet / Vacuum Design ready (delivery till 2016) Building: Shielding wall is done Cooling plant nearly finished Purchasing Radiation Safety system started Beamlines: Floor-planes in work? Test of components started Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Next Steps (2013) Accelerator: Finish built up of Booster and start operation End 2013 Start Purchasing of magnet system (design ready) To be delivered 2016 Start Purchasing of vacuum system (design ready) Start Purchasing Piping Cooling Storagering To be finished 2015 Start Purchasing RF (cooperation with SOLEIL) Floorplan! … Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Project-Development Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

SESAME Microtron in Operation, Beam in the transfer line Achieved: Energy: 22MeV Pulse-Width: 2 µs Pulse-Current: 2 mA Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Booster-Built-up Unit-cell (6 x) Injection-Septum Microtron RF Cavity 2kW H. Focusing Quadrupole Unit-cell (6 x) Dipole V.Focusing Quadrupole Dipole H. Focusing Quadrupole Extraction-Septum Injection-Kicker Extraction-Kicker Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Booster-Magnets Dipole B-field 1 T Radius 2.67 m Gap 40 mm Current 1000 A No windings 2x16 Resistance 0.015 Inductance 8.6 µH Quadrupole Gradient 5.77 T/m Length 0.25 m Bore- 78 mm Current 146 A No windings 4 x 24 Resistance 0.054 Inductance 6.8 µH Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Task-List Booster Layout of cable trays, purchasing of cable trays, cabling Dec. 2012 Alignment of magnets Dec. 2012 Installation of vacuum chamber Dec. 2012 Grounding Installation of Booster-RF March 2013 Layout of pulsed magnets PS, purchasing/built up June 2013 Layout of Booster corrector PS, purchasing June 2013 Set up of PLC-controller (vacuum, magnets) March 2013 Set up of ramped Power-supply control-system (EPICS+ Ethernet Interface) Set up of corrector Power-supply control-system (EPICS+ Ethernet Interface) Set up of Booster-RF-PLC-Controller June 2013 Set up of timing system March 2013 Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

SESAME-Optics Energy 2.5 GeV Current 0.4 A Periods 8 DBA Circumference 133.2 m Tune horiz. / vert. 7.25 / 5.19 Nat. Chroma. h / v -14 / -14 Emittance 25 nm Mom. Comp. 0.008 Radiation loss 0.6 MeV Low vertical beta Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Storagering Magnets Purchased by CERN/EU: 5 M€ Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

SR Dipole Field strength: 1.455 T Deflection: 22.5 ° Radius: 2.67 m Gap: 40 mm Current: 600 A Turns: 2 x 40 Conductor: 15x15,7 To get the electrons on a circular path Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

SR Quadrupole Gradient: 17/-10 T/m Bore: 70 mm Length 280/100 mm Current 280/195 A Turn/coil: 34/19 To get the electrons periodic focused Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

SR Sextupole ½ B’’: 90/140 T/m2 Bore: 75 mm Length: 100 mm Current: 86/135 A Turns per coil: 12 To correct the focusing Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Girder-Design In kind contribution from Pakistan? Design ready 6 feeds 3 struts used for transverse and longitudinal adjustment 3 jacks used for vertical adjustment and clamping Magnet Position defined by pins In kind contribution from Pakistan? Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Cavities Two 60 kW ‘prototype’ cavities available! For reasonable beamline operation at least three mature cavities are needed. No cavities P/cavity [kW] Max. current [mA] 2.5 GeV 2.2 GeV 2 60 30 100 80 50 200 3 400 120 4 Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Storagering-RF SOLEIL: 350 MHz RF Solid-State-Amplifier Collaboration SOLEIL-SESAME: Development of 70 kW 500 MHz tower 70kW / tower, 500 k€ 2 donated ELETTRA-Cavity old test devices, bad brazing Low Level Electronics: Collaboration with ALBA? Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Beam-Position-Monitors (64) Vacuum-Design Design ready, since 2000 Next: Specification to be written Begin 2013 Absorber for SR (125 kW) Pumps (100) Beam-Position-Monitors (64) Stainless steel Vacuum chamber Lamped Absorber for 125 kW @ 200 mA Ion-Pumps Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Vacuum System Vacuum chamber 150 l/s Pump Absorber Absorber Pumping speed: 20000 l/s Pressure: 2 10-9 mbar Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Cooling Plant Chiller / Compressor 2200 kW 10° water Heat Exchanger 1940 kW 20° demin. Water Load: RF: 640 kW 640 kW SR-Magnets 600 kW 600 kW Air conditioning 300 kW 80 kW Chillers, Compressor installed Pumps Heat exchanger installed Piping for Booster installed Air conditioning installed Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Cooling Set-up Pumps, pumps Cooling towers Heat exchanger and chillers Cooling: Magnets, RF, Absorber Air-conditioning hall / tunnel / hutches Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Radiation-Safety At Synchrotron-Radiation-Sources: Dose < 1 mSv/h Radiation areas classification: Prohibited Area : dose-rate > 3 mSv/h Accelerator-tunnel Beamline-Hutches Controlled area: dose > 6 mSv/y (Personal monitoring) Supervised Area dose-rate > 1 mSv/y (area monitoring) Non designated < 1 mSv/y Radiation worker classification: Exposed A <20 mSv/y (Exposed B < 6 mSv/y) Non exposed: < 1 mSv/y Personal doses and collective doses have to be kept as low as reasonable achievable (ALARA) At Synchrotron-Radiation-Sources: Dose < 1 mSv/h Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Radiation Shielding Electron-Losses: 2.5 GeV cascade of γ, e+ ,e-, n (0.025W) Shielding: 1 m concrete+0.15 m lead Inelastic Electron-Scattering: 25 MeV Gasbrems-Strahlung Shielding: 0.2 m lead (Hutched) Synchrotron Radiation: 50 keV (150 kW) Shielding: 4 mm lead Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

Radiation-Monitoring Rules: Keep radiation level < 1 mSv / y (2000 h) 0.5 µSv/h Purchasing of Radiation Monitors in progress 5 movable +2 portable stations: Gamma: 10 nSv/h – 1 Sv/h 30 keV -10 MeV Neutrons: 10 nSv/h – 0.1 Sv/h 25 meV – 100 MeV Offline-Monitoring (TLT) local provider with coarse monitoring Request for Tender in preparation for interlock system based on Safety PLC More talk MortezaMansour Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012

The means have become available to built up SESAME now! Let us go ahead to deliver the Synchrotron Radiation to the users! Erhard Huttel, SESAME, SAC 2012, 10./11.Nov.2012