Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T1 R&D ACTIVITIES ON ACCELERATOR- DRIVEN TRANSMUTATION SYSTEM IN JAERI Hiroyuki.

Slides:



Advertisements
Similar presentations
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
Advertisements

SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
The JPARC Neutrino Target
Transmutation of Long-lived Nuclear Wastes
Design on Target and Moderator of X- band Compact Electron Linac Neutron Source for Short Pulsed Neutrons Kazuhiro Tagi.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Yacine Kadi Thorium Energy Conference 2013 Globe of Innovation, CERN, Switzerland October 31, 2013.
Radioactive Nuclides in Japan
EURISOL Town Meeting October 2012 – Lisbon High-Power Targets High-Power Targets Developments and Testing of Spallation Neutron Sources Yacine Kadi,
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Nuclear Data for ADS and Transmutation Joint TREND/SANDAT proposal for FP6 ADOPT- Meeting, Dec E. Gonzalez-Romero (CIEMAT) Introduction Sensitivity.
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
MA and LLFP Transmutation Performance Assessment in the MYRRHA eXperimental ADS P&T: 8th IEM, Las Vegas, Nevada, USA November 9-11, 2004 E. Malambu, W.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
IAEA International Atomic Energy Agency IAEA Activities in the Area of Partitioning and Transmutation Alexander Stanculescu Nuclear Energy Department Nuclear.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Nitride Fuel and Pyrochemical Process Developments for Transmutation of Minor Actinides in JAERI Masahide Takano, Mitsuo Akabori, Kazuo Minato, Yasuo Arai.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
Nuclear Thermal Hydraulic System Experiment
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
ThEC13, Geneva, 28th-31st Oct., 2013 C. H. Pyeon, Kyoto Univ. 1 Cheolho Pyeon Research Reactor Institute, Kyoto University, Japan
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Development of The Klystrons for J-PARC Project
E3 Teacher Summer Research Program. Willie L. Smith - IPC, Physics Tidehaven ISD Tidehaven High School.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Characteristics of Transmutation Reactor Based on LAR Tokamak Neutron Source B.G. Hong Chonbuk National University.
Development of tritium breeder monitoring for Lead-Lithium cooled ceramic breeder (LLCB) module of ITER presented V.K. Kapyshev CBBI-16 Portland, Oregon,
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
Fusion Neutronics Activity at JAERI from October 2000 to September 2001 Peseted by Takeo NISHTANI IEA International Work Shop on Fusion Neutronics The.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
ERMSAR 2012, Cologne March 21 – 23, 2012 Post-test calculations of CERES experiments using ASTEC code Lajos Tarczal 1, Gabor Lajtha 2 1 Paks Nuclear Power.
A Low Power ADS Demonstrator Hywel Owen School of Physics and Astronomy University of Manchester.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
Status of the SAD Project V. Shvetsov, FLNP. SAD Project Objectives Coupling all major components of ADS; Core design, safety assessment, licensing; k.
Nuclear Battery Battery.  Reactor –Core Metallic fuel core (U-10%Zr) –Reactivity control Movable reflectors –Shutdown system Shutdown rod and reflectors.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Nuclear Physics Researches on HIAF and CIADS facilities in China
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Study on IFMIF Beam-Target Interface
Heating and radiological
T5.2: Harmonization - Material and Component Reference
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Summary of session 5: Innovative Ideas and New R&D
Challenges and Perspectives of Accelerator Driven Systems (ADS)
Pebble Bed Reactors for Once Trough Nuclear Transmutation
KEK injector cryomodule
ADS Accelerator Program in China
LOW-POWER RESEARCH REACTOR FOR EDUCATION AND TRAINING
IFMIF/DONES Project: opportunities for the industry
Presentation transcript:

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T1 R&D ACTIVITIES ON ACCELERATOR- DRIVEN TRANSMUTATION SYSTEM IN JAERI Hiroyuki Oigawa, Kazufumi Tsujimoto, Kenji Kikuchi, Yuji Kurata, Toshinobu Sasa, Makoto Umeno, Shigeru Saito, Kenji Nishihara, Motoharu Mizumoto, Hideki Takano, and Nobuo Ouchi

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T2 Contents Design Study of ADS R&D on Accelerator R&D on Pb-Bi (LBE) Spallation Target and Coolant R&D on Subcritical Reactor Physics Transmutation Experimental Facility (TEF) in J-PARC Project  Transmutation Physics Experimental Facility (TEF-P)  ADS Target Test Facility (TEF-T) Part of this work was funded by the Ministry of Education, Culture, Sports, Science and Technology (MEXT) as one of the R&D programs for innovative nuclear systems.

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T3 JAERI’s Reference ADS Primary pump Steam generator Proton beam Inner barrel Beam duct Beam window Reactor vessel Core barrel Guard vessel Core support structure 13.5m 11.8m Proton beam : 1.5GeV Spallation target : Pb-Bi Coolant : Pb-Bi Max. k eff = 0.97 Thermal output : 800MWt MA initial inventory : 2.5t Fuel composition : (MA +Pu)Nitride + ZrN Initial loading: Zone-1: Pu/HM=30.0% Zone-2: Pu/HM=48.5% Transmutation rate : 10%MA / Year 600EFPD, 1 batch Proton beam : 1.5GeV Spallation target : Pb-Bi Coolant : Pb-Bi Max. k eff = 0.97 Thermal output : 800MWt MA initial inventory : 2.5t Fuel composition : (MA +Pu)Nitride + ZrN Initial loading: Zone-1: Pu/HM=30.0% Zone-2: Pu/HM=48.5% Transmutation rate : 10%MA / Year 600EFPD, 1 batch

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T4 Outline of the R&D Activities 3-year Program:  Funded by MEXT for  Including SC-LINAC, LBE, and Reactor Design for Future Plant. J-PARC:  Phase-1 Accelerator is being constructed.  TEF is in Phase-2 (after completion of Phase-1) 3-year Program R&D for Future ADS without Proton BeamJ-PARC Experimental Program using Proton Beam Experimental ADS and Commercial Plant Feasibility Assessment International Collaboration Collaboration in Japan

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T5 Development of Superconducting LINAC Development of Pb-Bi Target/Coolant Development of Subcritical Reactor High Energy Accelerator Research Organization (KEK) Mitsubishi Heavy Industries Ltd. Mitsui Engineering and Shipbuilding Co. Ltd. Mitsubishi Electric Corporation Tohoku University Japan Nuclear Cycle Development Institute (JNC) Hokkaido University Tokyo Institute of Technology Nagoya University Kyoto University Research Reactor Institute Collaboration in Japan

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T6 Design Study : Neutronics Keff: 0.97 – 0.94 Maximum beam : 1.5 GeV x 18 mA = 27 MW In this study, 30MW is adopted, though 20MW will be sufficient in the equilibrium cycle. Keff: 0.97 – 0.94 Maximum beam : 1.5 GeV x 18 mA = 27 MW In this study, 30MW is adopted, though 20MW will be sufficient in the equilibrium cycle.

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T7 Design Study : Thermal-hydraulics (1) Spallation Target and Core Coolant Core barrel Core region Reflector Support structure Coolant flow Beam window Beam duct Proton beam Target region Beam duct support Partition wall Flow control nozzle Partition wall Flow control nozzle Optimization of design parameters:  Inlet temp. : 300 ºC  Beam duct : 45cm Partition wall Flow control nozzle Optimization of design parameters:  Inlet temp. : 300 ºC  Beam duct : 45cm 30 MW proton beam with 1.5 GeV causes heat deposition of 15.7MW.

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T8 Design Study : Thermal-hydraulics (2) Analytical Results for Beam Window (unit: Kelvin) 450 o C 470 o C 490 o C Outer surface temperature of beam window (unit: m/s) 1.8m/s 0.2m/s 2.0m/s Maximum temperature of outer surface : 490 ºC Flow control nozzle cools the bottom of the beam window effectively. Maximum temperature of outer surface : 490 ºC Flow control nozzle cools the bottom of the beam window effectively. Flow speedTemperature

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T9 R&D on Accelerator : SC-LINAC 972 MHz Cryomodule 9-cell, (  =0.725) He vessel : Ti (2K) Maximum surface electric field > 30 MV/m Installed Cryomodule Superconducting Cavity Vacuum vessel Liquid He vessel Superconducting cavity (9-cell) RF power coupler 4m 1.2m

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T10 R&D on Accelerator : J-PARC (1) Site Plan Transmutation Experimental Facility 3 GeV Synchrotron Material and Life Science Facility Nuclear Physics Facility 50 GeV Synchrotron (1500m L ) Neutrino Facility 500m LINAC (350m L ) Phase-1: 400 MeV Phase-2: 600 MeV J-PARC : Japan Proton Accelerator Research Complex Construction of Phase-1 : (except for some parts) Transmutation Experimental Facility and 600 MeV LINAC are in Phase-2.

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T11 R&D on Accelerator : J-PARC (2) Status of Construction Feb. 2004

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T12 Sep April 2004 Sep, 2004 R&D on Accelerator : J-PARC (3) LINAC Building

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T13 R&D on Accelerator : J-PARC (4) LINAC Beam Test Beam test is under way at KEK/Tsukuba up to 20 MeV, 30mA. It will be moved to JAERI/Tokai Drift Tube LINAC ( < 60 MeV) RFQ ( < 3 MeV)

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T14 R&D on LBE : Corrosion (1) Static Test Ferrite : Corrosion film depends on the Cr content. 5%Si –added steel exhibited fine corrosion resistance. JPCA Si-added steel Corrosion Depth (  m) Ferrite Austenite Si-added Cr(wt%) 550 ºC, 3000 hr. Oxygen - saturated 20  m

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T15 R&D on LBE : Corrosion (2) Loop Test F82H (martensitic) and JPCA (austenitic) are being tested as candidate materials for beam window. Expansion Tank EM Pump Test Section Drain Tank Air Cooler JAERI Pb-Bi Loop-1 (JLBL-1) Flow rate : 5L/min. Temperature : 450ºC MES Pb-Bi Loop Flow rate : 5L/min. Temperature : 500ºC 3000 hr. continuous operations were successfully completed. Test tubes were analyzed hr. continuous operations were successfully completed. Test tubes were analyzed.

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T16 R&D on LBE : Thermal-hydraulics at Beam Window Heat transfer characteristics are being measured by changing flow rate ( L/min.) and inlet temperature ( ºC) parametrically. Block diagram LBE Loop for Beam Window LBE at Overflow Section Circulation Pump Flow Meter Perforated Plate Test Vessel M Fl Heater

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T17 R&D on LBE : Behavior of Radioactive Impurity Production rate of Polonium (Po) in Pb-Bi was measured by irradiating Pb-Bi in JMTR. No large discrepancy was observed between the calculation and the measurement. Evaporation rates of Tellurium (Te) from Pb-Bi were measured as a function of temperature to verify the experimental method. Using the irradiated Pb-Bi, evaporation rates of Po is being measured. Production rate of Polonium (Po) in Pb-Bi was measured by irradiating Pb-Bi in JMTR. No large discrepancy was observed between the calculation and the measurement. Evaporation rates of Tellurium (Te) from Pb-Bi were measured as a function of temperature to verify the experimental method. Using the irradiated Pb-Bi, evaporation rates of Po is being measured. Heater Ar gas Sampling Irradiated Pb-Bi Po Heater Transpiration method Pb-Bi irradiation capsule

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T18 R&D on Subcritical Reactor Physics : Uncertainty of reactor physics parameters are estimated by the sensitivity of nuclear data calculated by SAGEP code and the error files evaluated for JENDL-3.3. Preliminary analysis showed that the capture reaction of Am-241 has significant effect on k-eff. Uncertainty of reactor physics parameters are estimated by the sensitivity of nuclear data calculated by SAGEP code and the error files evaluated for JENDL-3.3. Preliminary analysis showed that the capture reaction of Am-241 has significant effect on k-eff. FissionCapture Np %0.25% Pu %0.07% Pu %0.03% Pu %0.02% Am %0.57% Am %0.23% Total0.76% Estimated uncertainty on k-eff of BOC of initial cycle Sensitivity of Nuclear Data to k-eff at the beginning of initial cycle

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T19 ADS Target Test Facility : TEF-T Critical Assembly Pb-Bi Target Shield 200kW 10W Laser Charge Exchange Transmutation Physics Experimental Facility : TEF-P Transmutation Experimental Facility (TEF)

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T20 Proton beam Fixed half assembly Movable half assembly Fuel loading machine Movable shield Core Safety/control rod drive mechanism Max. power : ~ 500W, Max beam : ~10 W (~10 12 n/s) Experiments in critical state can also be performed. Transmutation Physics Experimental Facility (TEF-P) :

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T21 Liquid Target is contained in sealed-tube Primary circuit devices are completely isolated Safe and quick replacement is possible. Material database can be established by changing irradiation conditions such as temperature, flow rates, beam intensity, oxygen concentration, etc. Liquid Target is contained in sealed-tube Primary circuit devices are completely isolated Safe and quick replacement is possible. Material database can be established by changing irradiation conditions such as temperature, flow rates, beam intensity, oxygen concentration, etc. Irradiation samples Protons Target room EM pump EM flowmeter Heat exchanger He Pb-Bi ADS Target Test Facility (TEF-T): Double-annular Type Pb-Bi Target

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T22  Check and Review (C&R) by Atomic Energy Commission will be necessary to start TEF.  Safety review is necessary for TEF-P before the construction and the manufacturing because it is a nuclear reactor facility.  R&Ds for TEF:  TEF-P: Instrumentation, Laser charge exchange  TEF-T: Pb-Bi technology, Material irradiation effect Fiscal Year Milestone J-PARC LINAC TEF 180MeV 400MeV 600MeV ▼Establishment of New Organization C&R ▼Licensing of TEF-P Construction Commissioning Safety review TEF-P TEF-T R&D, Design Expected Schedule of TEF (Preliminary)

Nov. 9-11, 2004, Las Vegas, USA8th OECD/NEA Information Exchange Meeting on P&T23 Summary Wide range of R&D activities on ADS for transmutation are in progress.  Design Study of ADS (Neutronics, Thermal-hydraulics, Structure)  Accelerator (SC-LINAC, J-PARC Project)  Pb-Bi (LBE) (Corrosion, Thermal-hydraulics of Beam Window, Po)  Subcritical Reactor Physics Transmutation Experimental Facility (TEF) in J-PARC Project  Transmutation Physics Experimental Facility (TEF-P)  ADS Target Test Facility (TEF-T) To initiate TEF project, supports from foreign colleagues are greatly appreciated.