1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

BUILDING AIR CONDITIONING
Radiant Cooling System
Packaged Terminal Air Conditioners
Persian - Passive Cooling Systems Early designs provided a non-mechanical system for cooling the entire structure via natural convection.
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
HEALTHCARE BUILDING AUTOMATION
Lodging HVAC and Refrigeration
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Geothermal Heating & Cooling System Harnesses the free renewable energy in your own backyard to heat and cool your home. Economical - Can save you up.
MEP design Mechanical, Electrical, Plumbing. Often separate consultants Can be separate even within a single firm Often performed on a design-build basis.
Components of HVAC System
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Chilled Beam Presentation
Cooling Product Positioning
BRE Energy Efficient Office of the Future
Advanced Traditional Technologies used Heating and cooling Installation at radiant panels 1 VII International Congress on Educational Facilities, Guanajuato.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Engineer Presentation
Passive House Seminar for the Professionals from the Building Sector.
A HOUSE TO ECONOMIZE. MAIN TECHNOLOGIES USED FOR THE “ ECOLOGICAL HOUSE " This is a list of the most important technologies that we can use in our houses.
Post Occupancy Evaluation of Sustainable Development Projects in the Education Sector Leanne McMillan, Senior Consultant, BRE Scotland.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
BECOMING GREEN Santa Margarita High School Academic Building.
Pool system components - solar collectors - Temperature probes relief pool - Solar pump system - Pump filtration system - Relief valve - air temperature.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
This Presentation Contains Proprietary & Confidential Information. ©2005 IDL Heaters Thermal Products Ltd. All Rights Reserved. Indoor & Outdoor Heating.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
...save energy & reduce your costs
Grundfos FLOW THINKING Air conditioning the Grundfos Way.
Perfect solution for large building
Important variables Water: Air: Conversion:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Mission Energy: Energy Efficient Cooling How Data Centre energy consumption and operating costs can be significantly reduced through readily available.
Duurzaam Bouwen(NL.) Sustainable Building(ENG.) Bioedilizia(IT.) Installaties Installations Impianti Giacomo Scarpa(IT.) Mattijs Ester(NL.) Jeroen Schurink(NL.)
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
Lecture Objectives: Finish with software intro HVAC Systems
/ 1 ERA A chiller to suit everyone. Air cooled water chillers Free-cooling chillers Air/water heat pumps.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
SMART PCA.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
Technical Seminar on Application and Technical Specification June 2016
I-RACH range I-RACH range I-RACH range I-RACH range High efficiency air/water heat pump with INVERTER scroll compressor Range Modularity Components Highlights.
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Air source heat pump Understand the fundamental principles and
Sustainability Assessment of Family House - Case Study
Lecture Objectives: Learn about thermal storage systems
Elliott Microturbines Absorption Chiller Integrated System Development
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Under floor Heating Graduation Project submitted By: Adli Mosleh
Technology in Architecture
AdaptaPAK The sustainable, energy-efficient outdoor refrigeration solution.
Heating Ventilating and Air Conditioning
CONFIDENTIAL Technical Seminar on Application and Technical Specification 21 June 2016 Rezza Arif Bin Mustapa Kamal Senior Engineer Project And Application.
Adding Zones to Existing Systems
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
The key to comfort and reduced fuel use for all heating and cooling
FBE03: Building Construction & Science
Liebert DSE High efficiency thermal management
Heat Pumps Reference: BSRIA BG7 / 2009.
Presentation transcript:

1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)

2 A significant example from a recent Italian newspaper (3 rd February 2010) Controversy over modern buildings: a recent case

3 The Council building is making us ill ! Deluge of complaints from employees about the new headquarters Some areas are freezing whereas others are boiling, encouraging illnesses The building was designed as an open space but was then subdivided Controversy over modern buildings: a recent case

4 FARAM S.p.A. Headquarters Project:Renovation and extension works Location :Parma (Italy) Architect:Claudio Manni Total internal area:1700 m 2 Offices:850 m 2 Show-room:350 m 2 Service: 500 m 2

5 Existing building

6 Needs, Requirements and Objectives  Corporate image: implementing innovative and high-quality solutions

7 Needs, Requirements and Objectives  Employee comfort Visual comfort Acoustic comfort Thermohygrometric comfort Air quality Ergonomics Electromagnetic pollution

8 Strong emotional work commitment Slight emotional Work commitment No emotional work commitment Year 2007 Needs, Requirements and Objectives 18 % 69 % 13 % 0% 20% 40% 60% 80% 100% Work dedication Staff costs Building costs Others 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 1 Annual costs for an office building (2008)  Employee comfort Company attachment Quality of work Performance and productivity

9  Employee comfort Air quality Thermohygrometric conditions Needs, Requirements and Objectives % Dissatisfied due to air quality Performance % Relative performance Temperature (°C)

10 Needs, Requirements and Objectives  Flexibile solutions During design phase During installation

11  Adaptabilty During the life of the building Needs, Requirements and Objectives 0% 20% 40% 60% 80% 100% Office building space Communal areas, meeting rooms… Closed offices Open plan offices Outside

12 The Council building is making us ill ! Deluge of complaints from employees about the new headquarters Some areas are freezing whereas others are boiling, encouraging illnesses The building was designed as an open space but was then subdivided Controversy over modern buildings: a recent case

13 Needs, Requirements and Objectives  T.C.O. (Total Cost of Ownership): assessing the life cycle of a solution operating costs (energy, maintenance..) “adaption” costs (change in the intended use of the building, norms,..) downtime costs

14 Needs, Requirements and Objectives Building Costs [%] Maintenance costs [%] External improvements 43 Equipment411 Electrical systems1213 Fire prevention systems 30,25 Air conditioning systems 1621 Plumbing systems516 Lifts54 Internal finishings1519 Roof11,5 External walls1210 Structure and foundations 231,25  T.C.O. (Total Cost of Ownership): assessing the life cycle of a solution operating costs (energy, maintenance..) “adaption” costs (change in the intended use of the building, norms,..) downtime costs

15 Needs, Requirements and Objectives  Energy efficiency and sustainability Lower energy consumption Reducing refrigerant Low impact on global warming Sustainable materials

16 Needs, Requirements and Objectives  Energy efficiency and sustainability Lower energy consumption Reducing refrigerant Low impact on global warming Sustainable materials 2002/91/CE “Energy performance of buildings” Energy certification label for buildings

17 Proposed Solution

18 Htwh – Heat transfer unit Modular access floor INSTALLATION SCHEME Supervisory system Unitile – Terminal units ecoflair ® - Integrated solution patented by Uniflair Energy Provider - Multifunctional unit Accv – Air Handling unit

19 14°C 35°C Cold and Hot Loop Heating and cooling simultaneously Water based (no refrigerant indoors) Water Temp. : 14°C cold / 35°C hot high comfort energy saving (high C.O.P.) compatibility with alternative energy sources (geothermic, solar,..) Separation of sensible/latent load

20 Coil + fan: allows cooling or heating of the area in which it is installed Modular dimensions (600x600 mm): for integrated installation in a raised floor Connected with flexible pipes, these units can be moved according to layout changes Unitile – Terminal unit 230 mm 600 mm

21 (*) Designed with the Physics Department, Architecture University of Venice Directional grille (*) The discharge grille directs the air-flow to follow a “bell” path, creating a sort of “climatic bubble” between the Unitile and the suction grille. The air-speed is reduced in order to obtain a high level of comfort for users.

22 To connect Unitiles to the main pipes Increasing flexibility: with a local pump and “plug and play” connections, it allows to move and to add Unitile units, increasing the cooling capacity. Simplicity and speed of installation Hydraulic Kit

23 Cooling Heating Hydraulic Kit

24 User setting for temperature and air- speed (1,2,3, auto) Stand-alone operation Integrated ambient temperature sensor Easy connection in TLan with Utat units Wall installation Table support installation TLan Local User Terminal

25 Wireless control Advanced technology Simplicity and speed of installation Reduced cost of installation Increasing flexibility in moving Unitiles Captivating design No visible wires on desks

26 TUL (LOCAL USER TERMINAL) HOT LOOP 35°C COLD LOOP 14°C SUCTION GRILLE DISCHARGE GRILLE PLENUM MODULAR ACCESS FLOOR CONCRETE SLAB UNITILE (COIL AND FAN) 600x600 mm HYDRAULIC KIT FLEXIBLE PIPES Management of airflow based on the user requirements. FRESH -AIR Microclimate control

27 Commercial buildings often require heating and cooling simultaneously during the year Transferring energy is much better rather than creating it: this is the basic idea of the ecoflair ® system The Heat Transfer Unit (HTWH) balances the simultaneous opposite thermal loads within the building Energy efficiency

28 Commercial buildings often require heating and cooling simultaneously during the year Transferring energy is much better rather than creating it: this is the basic idea of the ecoflair ® system The Heat Transfer Unit (HTWH) balances the simultaneous opposite thermal loads within the building Energy efficiency

29 Cooling: some heat is “removed” from the air, and it is transferred to the cold loop (water T. increases) In the HTWH this q.ty of heat is “moved” from the cold to the hot water Heating: the heat which has been cumulated in the hot loop (water) is given back to the air in another building area Heat Transfer Unit - HTWH Restores the water set-point temperature in the 2 loops, transferring excess energy from the cold to the hot loop

30 HEATING LOAD (kW) COOLING LOAD (kW) TRANSFERRED BY THE HTWH TRANSFERRED BY THE HTWH PROVIDED BY THE E.P. PROVIDED BY THE E.P. Energy Provider - external multifunctional unit Integrates the unbalanced thermal energy Production of hot and cold water independently or simultaneously Independent cold/hot water circuits (no cycle inversion) Reduced footprint (1 unit only) Free-cooling operation available High energy efficiency (recovering heat) Outdoor and easy installation

31 Managing the quality of internal air: Humidity (humidification/dehumidification) Adequate air exchange Air filtration Monitoring of the CO 2 and VOC levels Cross flow heat exchanger to exchange heat between exhausted discharged air and incoming fresh air. ACCV – Air handling unit

32 Ground Floor 1st Floor FARAM Headquarters – Project description  ecoflair® system  Fan coil / underfloor system  Integration with a boiler available in production  Supervisory System

33 Building work on site

34 Building work on site

35 Finished project

36 Finished project

37 Finished project: 2nd step

38 Finished project: external

39 Comfort Flexibility Cost € Benefits obtained Representative headquarters Integration of systems in the modular access floor High comfort conditions (individual control, air quality, low noise) Spatial flexibility and modularity Energy saving Reduction in operating costs

40 ecoflair ® - some references

41 Padova University Refectory Area:350 m2 Typology:2 pipe-system (external heat-pump)

42 Restaurant in Catanzaro Area:250 m2 Typology:2 pipe-system (external heat-pump)

43 Extension works “Traspolare S.p.A.” Headquarters Area:700 m2 Typology:different water based systems Ground floor: hydronic cassette First floor: ecoflair UTAT units in a 4-pipe system Loft floor: cold beams Bathrooms: ceiling radiant installation

44 FIRST FLOOR OFFICES DETAIL FIRST FLOOR: ecoflair UTAT units in a 4-pipe system Extension works “Traspolare S.p.A.” Headquarters

45 Extension works “Traspolare S.p.A.” Headquarters

46 Restoration of the Church of San Francesco in Naples Typology:2 pipe-system in a traditional floor

47 Restoration of an office building in Bologna Area:1000 m2 Typology:ecoflair® system in office area Traditional fan-coils in refectory area 3-way co-generation plant

48 Restoration of an office building in Bologna

49 ecoflair ®