The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of.

Slides:



Advertisements
Similar presentations
RavensNest 60 Channel Intelligent Video Solution The RavensNest is an enhanced video command and control platform that transforms any centralized analog.
Advertisements

G D L-Bus Proposal CDS Meeting, June 23, 2004 Paul Schwinberg, Daniel Sigg.
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
3U ATCA Shelf October Proprietary and Confidential-
The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
1 Tom Himel 1 Status of the Linac Controls Upgrade LCLS FAC review Status of the Linac Controls Upgrade Tom Himel June 8, 2009.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Shelf Management & IPMI SRS related activities
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Copyright © 2002 Delmar Thomson Learning Chapter 9 Putting Together a Modular PLC.
Sheng Peng March,  We are talking about CPU board, not CPU  No embedded low-power low-performance mobile CPU is needed  We don’t seem to have.
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Network Topologies.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Basic Concepts of Computer Networks
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Introduction to mTCA and LLRF review Tom Himel June 4,
LECTURE 9 CT1303 LAN. LAN DEVICES Network: Nodes: Service units: PC Interface processing Modules: it doesn’t generate data, but just it process it and.
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
ILC Electronics Manufacturing Opportunities ILC Industrial Forum at Fermilab September 21-22, 2005 Ray Larsen for SLAC ILC Electronics Group.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
1 Application of New PICMG µTCA for Physics Specifications to Accelerator Control Ray Larsen, SLAC & Kay Rehlich, DESY TWEPP 2010 Workshop Aachen, Germany.
SLAC ILC High Availability Electronics R&D LCWS IISc Bangalore India Ray Larsen, SLAC Presented by S. Dhawan, Yale University.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Communication in ATCA-LLRF System Presenter:
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
SHAPE OF A NETWORK COPYRIGHT BTS TOPOLOGY The way the computers are cabled together Four different layouts Logical topology describes the way data travels.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
-Proprietary and Confidential-
SLAC High Availability Electronics Architectures & Standards for ILC The Case for Five 9’s Ray Larsen SLAC ILC Program.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Rehab AlFallaj.  Network:  Nodes: Service units: PC Interface processing Modules: it doesn’t generate data, but just it process it and do specific task.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
MicroTCA & AdvancedTCA Shelf Management Jiping Cao May, 2009 Controls Conference (RT2009) Beijing China.
Johannes Lang: IPMI Controller Johannes Lang, Ming Liu, Zhen’An Liu, Qiang Wang, Hao Xu, Wolfgang Kuehn JLU Giessen & IHEP.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
MicroTCA Development and Status
Chapter 1: Introduction to the Personal Computer
SLAC I&C Division / EE Department
The SLAC Instrumentation and Control Platform
New xTCA Developments at SLAC
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Instructor Materials Chapter 1: Introduction to the Personal Computer
LLRF and Beam-based Longitudinal Feedback Readiness
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Low Level RF Design Outline Scope Requirements Options considered
Safety, reliability and maintainability
Presentation transcript:

The planned new system Tom Himel Dec 1,

Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of µTCA Advantages of µTCA Pros and Cons and our decision making process Summary 2

Controls has multiple related projects Upgrade LLRF for 1 LCLS RF station –Funded for $1.8M from AIP –Requirements mostly done, design started Upgrade 10 sectors (80 RF stations) of LLRF (could be or 11-20) –Will be proposed when above prototype is finished at cost of ~$25k per station = $2M Develop and industrialize the new µTCA standard and use it to instrument ILC 10 MW klystron - interlocks and feedbacks –Funded for $2M from ILC about 60% done –Standard nearly signed, companies producing shelves and modules 3

Controls has multiple related projects “station node project” –Upgrade multiple systems near a single RF station: stripline BPM, toroid, vacuum, motion control?, temperatures? Profile monitors? –Proposed $2.8M AIP –This project is immediate cause of this review. Upgrade sectors –Will be proposed at cost of ~$10M when above prototype is done –Another ~8M needed for related non-controls upgrades: SSSB, magnet PS, modulator PLC Build LCLS-II Want to coordinate these projects to take advantage of synergies (sharing of module types and space in crates) 4

Why upgrade the linac? If that isn’t obvious to you after the last talk, we have invited the wrong reviewers. Want better reliability and maintainability Want components for which we can get repair parts Want mostly commercially available components 5

The architecture choice We have spent considerable time and many group meetings deciding on the architecture to use. Decided on µTCA Will first describe µTCA to you Then explain its advantages Then share the pros and cons matrix that went into our decision making process 6

Genealogy of µTCA ATCA (Advanced TeleCommunications Architecture) is a standard developed for the telecommunications industry. – Emphasis was on high availability and high bandwidth. –There are many commercial modules available –Modules are physically large (~fastbus size) Connections to smaller daughter boards are part of the standard. 7

Genealogy of µTCA These daughter boards are called AMC (Advanced Mezzanine Cards). –Several can be mounted on an ATCA carrier card. –Often the carrier card must be customized for the particular AMCs used to route in the necessary I/O from the cables that go to the RTM (Rear Transition Module) attached to the ATCA card. Some small projects can be done with ONLY AMC cards. 8

Genealogy of µTCA This led to first the µTCA standard and then to the µTCA for physics standard. –The physics standard is twice the size of the minimum sized µTCA (AMC) card and has a connector for an RTM. It is backplane compatible with a standard µTCA card and simply defines the use of some spare lines on the backplane. It is the µTCA for physics we plan to use and it will hereafter be referred to simply as µTCA. The µTCA standard was developed as an international industry/lab committee under the auspices of PICMG. The standard is virtually complete, but final signatures are still awaited. A small but growing number of commercial products are available. 9

µTCA features IPMI: Standard out-of-band network to monitor temperatures, fan speeds, voltages of both crates and modules. Allows remote control of power to individual modules. Standard software available to implement all of this. Redundant hot-swappable fans allowing this most commonly failing component to be replaced without program interruption Ability to have redundant power supplies and network hubs Timing distribution provided on backplane 10

µTCA features Truly hot swappable modules and RTMs. –Allows bad modules to be swapped without added degradation of the control system. –This in turn allows more modules to be in a crate and hence fewer crates without degrading system availability. Split between AMC and RTM allows an AMC module to be used for several purposes by having different relatively simple RTM cards. E.g put the ADC on the AMC module and have RTM cards with different signal shaping for BPMs and toroids. Uses point-to-point communications instead of busses. Allows for high bandwidth and avoids subtle bus problems where a problem in one module causes problems in another. Low noise environment suitable for analog electronics. Solid, well tested mechanical and connector designs 11

µTCA backplane 12

AMC & µRTM Modules – µTCA.4 13 µRTMAMC Power System Mgmt Keying Standard AMC Connector and Backplane User I/O

Industry Prototypes:6-Payload Shelf 14 µRTM  Development Shelf 6-Slot  Physics Backplane  Non- Redundant MCH, Fans, Power Module

µTCA.4 Development Platform 15  SLAC Linac controls upgrade  6-Slot Prototype Shelf w/ MCH, Processor, Interim Timing System, power module, built-in fans  PMC Event Receiver (EVR) on double µTCA Adapter  Shelf non-redundant  All rear I/O access

12-Payload Shelf 16  Full µTCA.4 Compatibility  Fully redundant MCH, power, fans

Courtesy K. Rehlich DESY DESY XFEL will use µTCA in the tunnel 17

Prototype for XFEL. We have one. 18  bit DACS

Slow I/O can be done with IP cards 19 There is also a PMC carrier that we presently use for our timing card

µTCA summary Scaleable modern architecture –From 5 slot μTCA …full mesh ATCA Gbit serial communication links –High speed and no single point of failure –Standard PCIe, Ethernet communication –PCIe and Ethernet is part of Operating System Redundant system option –Up to % availability Well defined management –A must for large systems and for high availability Hot-swap –Safe against hardware damage and software crashes 20

Our Architecture decision We briefly looked at many standards Carefully compared network attached devices (rack mounted chassis with Ethernet ports), VME and µTCA. We expect to end up with a mixed system, so really deciding what standard to use for new and improved things. 21

Why not simply clone what we just did for LCLS-I Some parts not done at all (linac LLRF) Unhappy with other parts (stripline BPM) – more later We likely will clone some of the parts like PLC system for vacuum and perhaps Beckhoff for temperatures and misc I/O 22

LCLS BPM rack 23 FrontRear

LCLS BPM rear close-up 24

LI20 LCLS network rack 25

BPM chassis Each has: –4 signal cables (unavoidable) –A trigger at beam time cable –A calibration trigger cable –An ethernet port for channel access –An ethernet port used to pass raw data at 120 Hz to a VME IOC for processing as the internal CPU is too slow –A serial connection to a terminal server to allow viewing of the IOC console –A power cable to an ethernet controlled power strip so power can be cycled to perform a remote reset. 26

BPM chassis This was a design kludged together from available parts in 4 months when originally planned design for LCLS failed. Was then propagated to 10 linac sectors as didn’t have time to do a proper redesign and wanted its improved analog performance. It works! Physicists are quite happy. But REALLY don’t want to propagate this again! Needs a design using a crate e.g. µTCA. 27

BPM in µTCA Each module has: –4 signal cables (unavoidable) –A trigger at beam time cable –A calibration trigger cable –An ethernet port for channel access –An ethernet port used to pass raw data at 120 Hz to a VME IOC for processing as the internal CPU is too slow –A serial connection to a terminal server to allow viewing of the IOC console –A power cable to an ethernet controlled power strip so power can be cycled to perform a remote reset. 28 On backplane PCIe on backplane to CPU Only CPU has one IPMI handles this

VME situation VME is almost 30 years old: our system should operate for another years. Number of new developments is decreasing, sales are still constant Bus technology has speed limitations Wide busses create a lot of noise in analog channels No standard management on crate level No management on module level So far no extension bus survived One damaged bus line stops a whole crate Address and interrupt misconfigurations are hard to find 29

Reasons for choosing µTCA Use an industry standard to share with others Redundant fans and hot swappable fans and modules allows for troubleshooting and maintenance during user runs and improving reliability Cable plant reduction compared to network attached devices Systems can share crates with minimal impact 30

Reasons for choosing µTCA Firmware can be remotely loaded (presently we bring each module to the lab for this) Standard system to monitor temperatures and voltages A new standard rather than one nearing retirement Modular so pieces of it can be upgraded Allows use of new technology that allows us to challenge and keep good engineers. 31

Decision spreadsheet The presentation so far has been one- sided, listing the advantages of µTCA and no disadvantages. We were much more balanced in our decision making process. The spreadsheet at the same site as this talk contains the detailed pros and cons list that was a key part of our decision making process

A few design details Having made the major architectural decision, there are still many design decisions to be made. We have a proposed AIP project which is mostly R&D where most of those decision will be made. This review doesn’t really have time to go into design details anyway, but I’ll list some of the next level decisions we have made. 33

A few design details We will have 1 µTCA shelf near each klystron that will have the LLRF, 0-3 BPMs and whatever else needs handling that is nearby. It will be a 12 slot shelf. There will be an air to water heat exchanger in the rack with air that circulates through it and the crate. We will reuse the current racks but bring them up to today’s standards 34

A few design details We are working with Struck and Vadatech to modify existing ADC designs they have to meet our requirements for LLRF and BPM We expect all our AMCs to be commercial but we will design a variety of RTMs There will be some rack mounted chassis to handle large cable plants, high power or high voltage. We have a list of all our systems and how we plan to handle them. Some plans are tentative depending on availability of resources. 35

Summary The linac control system clearly needs upgrading It would be missed opportunity to not do it during FACET era with runs of only 4 months per year µTCA is the best choice for the architecture We should get started as there is a lot of work to do. If we go fast enough, most of the LCLS-II upgrade can also be done with µTCA 36