Liquidity: statutory consultation on the ‘Secure and Promote’ licence condition Power Trading Forum Martin Bell 12/12/13.

Slides:



Advertisements
Similar presentations
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Advertisements

Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Strictly Confidential – for BP client use only Marty Melchi June 15, 2006 IMGA Price Risk Management Discussion.
Review of industry code governance 26 March 2010.
Making It Real Express Briefing DACHS Shobha Asar-Paul.
1 The Care Act and Social Care Markets July 2014.
Click to edit Master title Open Water Legal workshop – 28 January 2015 Shepherd & Wedderburn LLP.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
The EU Constitution - a more social Europe? Kathleen Spencer Chapman, 26 th October 2004.
The Green Deal and Energy Company Obligation (ECO) June 2011.
Offshore Safety Directive (OSD) Update on the Offshore Petroleum Licensing Regulations 2015 Derek Saward DECC EDU OGED 18 th December 2014.
Forest Practices Code Transition Larry Pedersen Chief Forester, MOF.
A Review ISO 9001:2015 Draft What’s Important to Know Now
An overview of the proposed new system of revalidation for nursing March 2015 RCN Policy & International Department.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Helping the people of Canada maintain and improve their health Aider les Canadiens et les Canadiennes à maintenir et à améliorer leur état de santé Path.
SEN and Disability Green Paper Update on draft legislation and pathfinder programme.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
SCHC, 9/27/2005 US Implementation of the Globally Harmonized System The GHS Journey Continues…
Code Governance Review Initial Proposals Industry Codes and Licensing Ofgem.
Overview of the Rotterdam Convention. Sub-regional Consultation for DNAs 2 Overview of the Rotterdam Convention Structure of the presentation Part 1 -Introduction.
Leading the way; making a difference INTERTANKO Council November 15, 2012 UPDATE ON GHG MARKET BASED MEASURES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Local Transport Plan 3 Vision and Issues. The Local Transport Plan Will replace LTP2, which expires 31 March must have LTP3 approved and operative.
Market reviews in Oftel Elaine Axby 31 October 2002.
1 The Care Act and Social Care Markets June 2014.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Consolidation and Review of Financial Services Legislation (“ CAROL ”) Jane D N Bates Head of Policy and Legal Unit Financial Supervision Commission 21.
EU 2030 climate and energy update. Climate Action Network Europe over 120 member organisations in more than 25 European countries.
Code of Practice 13/ DC Regulatory Guidance. Agenda Background Code of Practice 13 v. DC Regulatory Guidance DC Focus areas Action: Timeline 2.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Trading and Execution Issues. Suitability of Recommendations NFA Compliance Rule 2-30 –“Know Your Customer” Rule NFA Members have never had a “Suitability”
How to deal with the implications of New Regulation 28 Magda Wierzycka CEO SYGNIA ASSET MANAGEMENT.
4. Solvency II update Catherine Beech 9 October
Ne Ad Developing and implementing corporate governance codes of best practice in MENA The Importance of the Consultation Process Ken Rushton, Nestor Advisors.
Climate Action Lessons from the ESD compliance cycle and its flexibility mechanisms: Current state of discussions Jürgen Salay European Commission, DG.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Fitness Check of environmental monitoring and reporting Stakeholder Workshop 19/20 Nov 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
Implementing the new Directives 12 March 2002 Policy Focus Group.
Brief Update 0-19 Prevention Service
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Developments Transmission Workgroup 3 rd May 2012.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Licences for Europe Introductory meeting, 4 February WG 4 – Text and data mining.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Broader Disclosure and the Operating and Financial Review (OFR): the standards perspective Ian Mackintosh Chairman, ASB November 2004.
Commodity Standing Group (COMSG). IRegulatory background Current lighter touch regime for UK commodity firms not undertaking ISD Investment Business MiFID.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Senior Adviser, OECD/SIGMA
Senior Adviser, OECD/SIGMA
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
MIG-P orientation debate
Options for the Development of a Demand Side Response Mechanism
European Labour Law Jean Monnet Chair of EU Labour Law Academic Year Silvia Borelli:
Stakeholder Engagement: Webinar Part I: The Regulatory Development Process for the Government of Canada Part II: Making Technical Regulations Under.
FCA Asset Management Market Study Remediation actions – what managers should be doing IN COMPLIANCE Main Title.
Concept paper on the assessment of WFD River Basin Management Plans
Legislative Update: SB 2224 and SB 322 October 1, 2019.
Presentation transcript:

Liquidity: statutory consultation on the ‘Secure and Promote’ licence condition Power Trading Forum Martin Bell 12/12/13

2 Secure and Promote Licence Condition Objective 1 (availability of products which support hedging): Secure fair trading terms for small suppliers through Supplier Market Access rules Objective 2 (robust reference prices along the curve): Promote improvements in forward liquidity through a market-making obligation Objective 3 (an effective near term market): Reporting requirements to facilitate monitoring of day- ahead auctions Reminder – structure of our liquidity proposals

On 20 November, we published a statutory consultation on the proposed licence condition. This is a legal requirement before making changes to licences This stage focuses on the licence drafting. We would like to obtain feedback on the licence text. In particular, we want to check that it reflects our policy design The full set of documents we published were: Responses to the statutory consultation, and any feedback on the Impact Assessment and Guidance should be submitted by 18 December 3 Current stage – statutory consultation Notice with the proposed licence text Statutory consultation setting out our final policy design Draft Guidance on interpretation of the licence text Impact Assessment

4 Market making design (1) Our design for the market making obligation remains broadly as set out in June However, following responses to the last consultation, we have updated our policy design to improve its effectiveness Approach to market maker availability Trading windows have a number of advantages – these include: Post prices for 50% of trading hours each month Post prices for two hour- long trading windows each day Requirement in June consultation Requirement in November statutory consultation Guaranteed opportunities to trade every day Increased market depth Afternoon window aligns with activity in the gas market Practical benefits (eg monitoring compliance)

5 Market making design (2) Knock-on changes to availability rules As a result of moving to trading windows, some of the other availability rules also needed to be redesigned These rules are intended to provide protection for Secure and Promote licensees against specific risks, while still ensuring that the design delivers regular availability Reloading rule Five minute period to replace prices after trading a particular product Volume cap Net volume cap for a licensee of 30MW in a product per window Intended to mitigate risk of large open positions Fast market rule Licensees allowed to withdraw from market making in a product if the price moves by 4% in a window Intended to deal with situations of extreme volatility

6 Market making design (3) Reframed rules – in general, we want to leave licensees flexibility about where to market make Platform rules Uncertainty about the final shape - so we intend to carry out a review at an appropriate point European financial legislation Increased slightly for baseload products Bid-offer spreads Introduced short (three month) transition period with slightly wider spreads Full product range still available in transition period Transition period

7 20 Nov 2013 Plus 20 days 31 Mar 2014 Statutory consultation publishedDeadline for responses Decision to modify licences (at least 56 days before changes come into effect) Window for appeal to Competition Commission (20 working days) Licence condition implemented Contact details: Graham Knowles Martin Bell or Leigh Rafferty Timetable 18 Dec 2013 Early 2014