Visibility 10/1/2007. 2 Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

Strategic Planning Update For Board Meeting December 5, 2007.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Questions about AVR & PSS
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Model Validation in Western Interconnection
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
OC Chair Items Don Watkins June 18-19, 2009 Operating Committee.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
January TSS J. Gronquist, S. Kincic
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
SRWG Chair Report March 2015 WECC HQ
System Strength Discussion
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Presentation to WECC TSS May 8, 2015
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Supervisory Systems.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Review of BPA Voltage Control Conference
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
WPD Connections Overview
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
Lyndonville Electric Department Feasibility Analysis Review December 2,
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Network Model Management System (NMMS)
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
ColumbiaGrid Reliability Activities ColumbiaGrid Board Meeting Presentation August 15, 2007.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Restoration Concepts PEAK RC Training Classification: Confidential Version No.: 1.5 Date of Document: Document Owner/Author: B Pederson Classification:
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Kenneth Silver Los Angeles Department of Water & Power
System Modeling Discussion
Freeport Area Master Plan Project -
Visibility Ramu Ramanathan 10/1/2007.
Western Electricity Coordinating Council
Next Steps in Load Modeling
Nick Hatton Associate Engineer March 9, 2017
I-5 Corridor Reinforcement Project
Proposed Energy Imbalance Market The Basics
Pacific Power Seismic Preparedness Update
Jonathan young ColumbiaGrid
Hongming Zhang EMS Applications Manager, PEAK RC
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

Visibility 10/1/2007

2 Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next Steps

Visibility Overview

4 Model Area Actual WECC System WECC Planning Model SE Model Network equivalence WECC substations Not in WECC planning model Future Model

5 WSM Project

6 Stage 1 – Operational Network Model RMRC (WAPA) CMRC (PG&E) PNSC (BPA) WECC Merged Operational Model Network Validation Power Flow Online Display

7 Stage 2 – SCADA & SE WECC Operational Network Model WECC SCADA Model State Estimator System SCADA System WECC ICCP Model ICCP System WECC WON

8 Stage 3 – WECC Customization State Estimator Customs Remedial Action Schemes PowerTech Applications –TSAT – Transient Stability –VSAT – Voltage Stability

9 System Model Objective WSM is the heart for system reliability. It will be used for estimating the system states and evaluating the system reliability. WSM is also going to be used for operation and system planning studies. Model needs to be accurate as much as possible. Most of the variance currently present need to be cleaned up. Proper tools, methodology, process and resources need to be identified to maintain the quality and accuracy of the model. Results will be as good as the model

10 WSM Possible Users WSM Provides Common Network Model for –Reliability Entities (RE) –Planning Entities (PEs) –Reliability Coordinators (RCs) –Balancing Authorities (BAs) –Planning Authorities –Transmission Operators –Resource Planners –Standards Developers

11 Status – WECC Schedule Phase 1 – 1 st Qtr 2008 (est 4th Qtr 2008) Phase 2 – est (????) Phase 3 – est (????) Stage 1 Stage 2 Q Q Q Q Q Q Q Stage 3

12 Status – ColumbiaGrid Activities Signed - Development and Staffing Reliability Functional Agreement Appointed Norm, Darrell, Ramu to support these activities

13 Overview of Agreement - Visibility Enhancements CG will assist in Western Interconnection-wide and region-wide efforts to enhance the visibility for –Reliability Coordinators –Transmission Operators/Owners Assist WECC’s in the development, testing, implementation and maintenance of –West-wide Model –Similar tools Recommend to Reliability Parties regarding workable Visibility tools for their respective Transmission Systems and the Regional Interconnected System. Deliverables –Establish presence in certain reliability forums –Gain experience and knowledge –Develop recommendations regarding future actions of parties, including potential roles for ColumbiaGrid –Publish interim recommendation (Date ??/??/??)

14 Visibility Enhancements Issues……. We need to identify approaches for following issues –Currently there is a clear plan how WSM is going to be used by WECC but not by members. –3 different bus names (Need cross reference) West Wide Model Operation Planning –Utilities need to come up with a method to synchronize their model with West Wide Model on the ongoing basis (Planning and operation) –Need to merge the model below 100 KV and validate –Additional tools are required to develop a planning model from the network model. –Model differences in operation and planning (Multi section lines, transformers, DC lines……….) –Currently data maintenance process between planning and operation has lot of gaps. –Few members are performing operation studies. Others need to perform operation studies based on current operating conditions to optimize the system and meet system reliability. (Next hour, next day and week) –Bus and node orient model issues –Need to identify the software licenses provided by AREVA for CG members

15 Visibility Enhancements Issues……. (Cont.,) Equipment Model Issues & variables –Modeling methods are not consistence –Generators (Hydro, Thermal, Water level, temperature…..) MW limits MVAR limits –Transformers (Tap, impedance, model…) –Line data –Line connected shunts –Multi section lines –Shunts (Value, Base KV, no of shunts, location) –DC Line modeling –Load –Sub transmission modeling & Equivalent model Data quality need to be validated

Preliminary Thoughts regarding Conclusions and Recommendations

17 Visibility Enhancements West-wide Model Initial Development BPACAISO WAPA Merged WSM 100 KV and above Validate Initial WSM

18 Visibility Enhancements West-wide Model Maintenance Online Model New Model WECC Validate Update To Current Model Every 2 weeks

19 Visibility Enhancements West-wide Model - Planning Dump Process WSM CIM/GE/PTI Add Lower KV model Validate Add Future Equipments Validate Planning Model

20 Next Steps Identify how GC members can use the WSM model – Identify gaps Identify the process to cleanup, test and maintain the WSM Establish presence in certain reliability forums GC Gain experience and knowledge Develop recommendations regarding future actions of parties, including potential roles for ColumbiaGrid Publish interim recommendation