Progress Report Reliability Focus Area Subcommittee on Systems Operation and Management June 2009.

Slides:



Advertisements
Similar presentations
Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
Advertisements

Overview What is the National ITS Architecture? User Services
Transportation leadership you can trust. presented to ITS Georgia 2005 Annual Meeting presented by Kenny Voorhies Cambridge Systematics, Inc. August 29,
Mobility and Safety Product Team (Work Zones). Integrated Product Teams “Integrated Product Teams (IPT’s) are chartered by agency leadership to address.
AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.
Transportation leadership you can trust. presented to FHWA’s Talking Freight Seminar presented by Michael Williamson Cambridge Systematics, Inc. April.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Transportation leadership you can trust. presented to Talking Operations Webinar presented by Richard Margiotta Cambridge Systematics, Inc. June 28, 2006.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Overview of NIPP 2013: Partnering for Critical Infrastructure Security and Resilience October 2013 DRAFT.
Accelerating solutions for highway safety, renewal, reliability, and capacity SHRP 2 Outreach and Implementation AASHTO Technology Implementation Group.
1 SHRP 2 Implementation Outcomes and Products July 28, 2010 Accelerating solutions for highway safety, renewal, reliability, and capacity.
Project Initiation Document (PID) Strategic Plan PID Committee Meeting - November 5, 2012.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Implementation Overview Research Advisory Committee July 24, 2012.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
IntelliDrive SM Strategic Plan 2009 Ted Trepanier SSOM – SCOTE Manchester The IntelliDrive SM logo is a service mark of the U.S. Department of Transportation.
PADI Action Agenda for China(draft) History of Poverty Reduction in China History of Monitoring & Evaluation in Poverty Reduction Objectives.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Talking Technology & Transportation (T3) Webinar July 25, 2007.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
FHWA Office of Freight Management Freight Technology Assessment Tool.
AASHTO Standing Committee on Research July 26, 2011 Accelerating solutions for highway safety, renewal, reliability, and capacity Update.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
IntelliDrive Safety Workshop July 20, 2010 Stephanie C. Binder National Highway Traffic Safety Administration US Department of Transportation Human Factors.
Context and Priorities April 9,  Why FHWA Focuses on Improving Operations  FHWA Operations Program Areas  Key Current Program Priorities.
1 based on Federal Highway Administration Capability Maturity Model Workshops Transportation Systems Management and Operations (TSM&O) Performance Measurement.
Transportation Technology Exchange Globally Presented by: Kay Nordstrom U.S. Dept. of Transportation at U.S./East Africa Workshop Arusha, Tanzania August.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
Kathy Corbiere Service Delivery and Performance Commission
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
1 USDOT Congestion Initiative Baltimore – Washington Regional Traffic Signal Forum Maritime Institute Linthicum, MD March 14, 2007 Regina McElroy Director,
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
Presented by Libby Ogard Prime Focus, LLC July 16, 2008 Freight Planning and Programming Summary of NCHRP Project 8-53 Guidebook for Integrating Freight.
International Outreach Overview TRB Annual Meeting, 2007.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
AASHTO CV/AV RESEARCH NCHRP (98) NCHRP
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 PERFORMANCE MEASURES FOR ROAD WEATHER MANAGEMENT Roemer Alfelor FHWA Road Weather.
Road Investment Decision Framework
Project Overview – Phase 1
System Planning To Programming
Transportation Systems Management and Operations (TSM&O)
TSMO Program Plan Development
FHWA TSMO / SHRP2 Research
MODULE 2: TSMO Strategies
Status Update AASHTO RAC
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
MODULE 2: TSMO Strategies
Regional Operations Forum Setting the Stage
Presentation transcript:

Progress Report Reliability Focus Area Subcommittee on Systems Operation and Management June 2009

Reliability Travel time reliability- consistency of travel conditions from day to day Goal: to reduce non-recurring congestion through reduction, management, response, and mitigation of the primary factors (incidents, traffic control devices, weather, special events, work zones) 19 projects for $20.35 million

Effects of Incidents and Weather on Reliability

SHRP 2 and SSOM Share common objectives: Measure, improve and report travel time reliability Mainstream systems operation and management Link planning and operations Improve state of practice SHRP 2 research directly links to SSOM strategic plan

Program Status 10 active projects- value $11.55 M 9 remaining projects- value of $8.8M 3 new project starts 3 projects nearing completion

New Project Starts Projects that have started since SSOM meeting last year

Prime contractor: North Carolina State University Budget: $1,800,000 Duration: 36 months Contract Start Date: March 18, 2009 L02 Establishing Monitoring Programs for Travel Time Reliability Guidebook on how to establish monitoring programs for travel time reliability Anticipated Products The objective of this project is to develop system designs for programs to monitor travel time reliability and to prepare a guidebook that practitioners and others can use to design, build, operate, and maintain such systems.

Prime contractor: Delcan Budget: $1,250,000 Duration: 36 months Contract Start Date: February 6, 2009 L04 Incorporating Reliability Performance Measures in Planning and Operations Modeling Tools Demonstration of a traffic simulation model that reflects reliability in a subarea of a network and preparation of application guidelines Guidance for incorporating reliability into travel demand forecasting models and addressing feedback with simulation models Anticipated Products The project will (1) develop the capability of producing measures of reliability performance as output in traffic simulation models and planning models, and (2) determine how travel demand forecasting models can use reliability measures to produce revised estimates of travel patterns.

Prime contractor: Virginia Tech Transportation Institute Budget: $300,000 Duration: 12 months Contract Start Date: February 9, 2009 L10 Feasibility of Using In-vehicle Video Data to Explore How to Modify Driver Behavior that Causes Non-Recurring Congestion This project will involve review of driver videos from past driving studies to determine the ability to extract useful information on behaviors and responses to factors that influence travel time reliability. Anticipated Products Report on the feasibility of using in-vehicle video data to help identify driver behavior modification strategies to improve travel time reliability

In-Vehicle Video Clip

Projects Nearing Completion Projects that will be completed this year

Prime contractor: Kimley-Horn & Associates Budget: $400,000 Duration: 18 months Expected Completion : August 2009 L01 Integrating Business Processes to Improve Reliability Development of case studies and summary information Business process and data flow diagrams capturing integrated procedures A guide on how to best integrate business processes related to operations Anticipated Products This project will identify and report on successful practices that integrate business processes to improve travel time reliability

I-80 Winter State Line Closures (NV/CA) Winter weather, elevation changes necessitate closure of CA/NV state line Limited (i.e., none) parking near state line for trucks not permitted to cross 5 year period – 23 closures, 31 truck prohibitions Typical winter day – 2500 trucks I-80 WB Why selected: Winter weather ops/management, multi- agency event management, freight, rural corridor

I-80 Agencies Involved NDOT District 2 Operations, Maintenance, PIO NDOT District 3 Operations/Operations Center Caltrans Nevada Highway Patrol Private Entities (Truck/Freight) Additional stakeholders – cities, counties, media

I-80 Process Types Pre-planning for winter operations/closures Process to establish closure and initiate notifications Internal agency processes/procedures for winter operations, closure operations Disseminating traveler information during hazardous winter conditions Planning and programming infrastructure to support corridor monitoring/info dissemination

Prime contractor: Cambridge Systematics, Inc. Budget: $1,750,000 Duration: 30 months Expected Completion: August 2009 L03 Analytic Procedures for Determining the Impacts of Reliability Mitigation Strategies Reliability vocabulary and definitions for application and communication Data and collection requirements, performance metrics, analysis methods Technical relationships between reliability improvement strategies, causes of non-recurring congestion and performance measures Anticipated Products This project will provide the means to predict what effect various improvement measures will have on travel time reliability performance

L03 Preliminary Findings Virtually all performance measures are derived from travel time distributions – reliability is a probabilistic phenomena At least six months of data are required to develop travel time distributions – a year is better Recommended reliability performance measures include Buffer Index, Failure/On-time Measures, Planning Time Index, Skew Statistic, Misery Index, Travel Time Index Travel time data traditionally comes from speed detectors on urban freeways- now the private sector is proving to be a valuable source of data on all key types of roads (e.g. signalized urban arterials)

Prime contractor: Parsons Brinckerhoff Budget: $1,000,000 Duration: 31.5 months Expected Completion: August 2009 L06 Institutional Architectures to Advance Operational Strategies Report providing guidance to transportation agencies on institutional architectures that will support operation programs that can improve travel time reliability Anticipated Products This project will examine the ways agencies should be organized to successfully execute operations programs to deliver travel time reliability by: conducting workshops to identify key issues examine and assess leading agency organizational structures examine organizational theory hold executive forums to determine the potential for widespread application

L06 Preliminary Findings Institutional issues account for the failure to capitalize on SO&M, not lack of concepts, technology or even money Only two states address SO&M as a stand-alone multi-year and annual budgeting process at the same level of formality as other core programs. A powerful approach for organizational self assessment and continuous improvement of operations is a Capability Maturity Model (CMM), similar to that used in the IT industry.

This framework would : consolidate the Reliability research findings to provide decision-makers and practitioners a guide to understand travel time reliability, incorporate reliability in project planning promote the merit of systems operations and management solutions to prevailing problems. develop and communicate the business case for travel time reliability L17 A Framework for Travel Time Reliability (New Project) A framework, possibly web-based product, that supports the planning, design and delivery of Reliability programs Anticipated Products

SHRP 2 Implementation Report to Congress in January 2009 recommended: AASHTO as principal implementation agent, in partnership with AASHTO, NHTSA and TRB Funding at $400M over 6 years Formal stakeholder advisory structure with detailed implementation plans Strategies to include- pilot testing of institutional approaches and technical products, lead users/demonstration projects, training and education programs, etc.

SHRP 2 and SSOM SHRP 2 will disseminate research results on a project by project basis- not solely at end of the program. A communication protocol between SHRP 2 and SSOM would have mutual benefits SHRP 2 implementation strategies- opportunities for SSOM members to conduct pilots, demos, be a lead state, etc.

Summary Program continues on schedule Project results becoming available now Dissemination of results will be a priority Encourage States to track and consider an active implementation role

Accelerating solutions for highway safety, renewal, reliability, and capacity More information can be found at: