D E C E M B E R 1 2, 2 0 0 6D E C E M B E R 1 2, 2 0 0 6 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F.

Slides:



Advertisements
Similar presentations
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
Advertisements

Public Debt Management with emphasis on PPP 1 Ministry of Finance 08 th Dec 2014.
 Definitions & Background  P3 Markets – Global & Canadian  Canada’s Infrastructure Deficit  P3 Policy Debate and Drivers  Why the debate matters 
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Briefing for the Transportation Border Working Group November 8,
TIFIA Credit Program Overview Updated August 2014 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
For rep/agent use only. Not for further distribution.
THE PRACTICE OF TOLLING Theory in Motion May 7, 2013 Michael Copeland Yagnesh Jarmarwala Justin Winn.
An Overview of the Chicago Skyway Transaction Joseph Seliga Mayer, Brown, Rowe & Maw LLP Northern Border Finance Conference Chicago, Illinois May 15, 2007.
Chapter 15.
Simon Par Keeling, Société Générale Paris
Corporate Bond Issuance in Euroclear International Securities Services Philippe Laurensy, Euroclear Euroclear Collateral Conference May 2014.
Massachusetts Community & Banking Council Economic Development Committee June 10, 2010.
Noncurrent Liabilities Chapter 9. Noncurrent Liabilities Noncurrent liabilities represent obligations of the firm that generally are due more than one.
On Leasing Adapted from Fundamentals of Corporate Finance RWJR, Fourth Canadian Edition.
Unit 4: Utilizing Financial Documents
© 2004 The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Chapter 15 Leases.
VII-Financing of Constructed Facilities The Financing Problem Institutional Arrangement for Facility Financing Avaluation of Alternative Financing Plans.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Reporting and Interpreting Liabilities Chapter 9.
Farm Service Agency Guaranteed Loans FSA guaranteed loans provide lenders (e.g., banks, Farm Credit System institutions, credit unions) with a guarantee.
Chapter 19 Permanent Financing of Commercial Real Estate Properties © OnCourse Learning.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Financing Urban Public Infrastructure
Structured Transaction Overview. FDIC serves as an equity partner in its Receivership capacity for a single or multiple institution transaction. Joint.
Background of PPP Negotiation
FINANCIAL SERVICES… Presented by: Ruchika Sharma.
2011 PK Mwangi Global Consulting Financing your business The key to acquiring funding will depend on the structuring and presentation of the business plan.
Long-Term Financing. Basics of Long-Term Financing.
Innovative Finance for Freight Transportation Jennifer Mayer FHWA Resource Center “Talking Freight” Webinar September 2006.
Preliminary Financial Analyses February 2011 Presented by: David C. Miller Managing Director The PFM Group I-95 (Rest Area) Access Project.
0 Equipment Leasing. 1 Options to Acquire Equipment Cash LoanLease Client owns equipment Appeals to cash-rich firms Not viable for small, new entities.
© 2005 Clancy & Company LLP All rights reserved Purpose of Seminar Outline  Outline Structure  Showcase performance of previous Funds  Give status.
Part 4 PowerPoint Presentation by Charlie Cook Copyright © 2003 South-Western College Publishing. All rights reserved. All rights reserved. Finding Sources.
Financial Management Chapter 18. Financial Management Chapter 18.
How a Value for Money Analysis is Integral to Your P3 Project Allan T. Marks Partner Milbank Tweed Hadley & McCloy LLP July 20, 2015.
Govt. Reporting - 1 GOVERNMENTAL REPORTING City Council Budgetary Hearing.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
Chapter 7 Commercial bank financial statement Salwa Elshorafa 2009 © 2005 Pearson Education Canada Inc.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Chapter 20 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Managing the Firm’s Finances.
CDA COLLEGE BUS235: PRINCIPLES OF FINANCIAL ANALYSIS Lecture 10 Lecture 10 Lecturer: Kleanthis Zisimos.
TIFIA Credit Program Overview Updated October 2012 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
TIFIA Credit Program Overview Updated May 2011 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
* WHAT’S FINANCE? The Role of Finance and Financial Managers * LG1
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
(C) 2007 Prentice Hall, Inc.2-1 The Balance Sheet-Liabilities and Shareholders’ Equity “Old accountants never die; they just lose their balance” --Anonymous.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Lecture 1.  Accounting is “the language of business.”  More precisely, accounting is a system of maintaining records of a company’s operations and communicating.
Presented by: Peter Loughlin September 23, THE PAST YEAR September 30, 2009 Program Expired Short Term Extensions – GF Transfers $8b in 08, $7b.
Private Placements and Venture Capital Chapter 28 Tools & Techniques of Investment Planning Copyright 2007, The National Underwriter Company1 What is it?
11-1 Chapter Eleven Accounting for State and Local Governments, Part I McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
SBA 504 Loan Program Long Term Fixed Asset Financing For Small Businesses.
Topic 3: Finance and Accounts
Proposed Budget Fiscal Year 2017 Presentation to the County Commission May 4, 2016 FY16 Proposed Budget Presentation.
Detroit River International Crossing Project March 31, 2010.
Leases and Off-Balance Sheet Debt 11 CHAPTER. Leases Lease – contractual agreement between a lessor (owner) and a lessee (user or renter) that gives the.
Intercompany Indebtedness
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
sources of short term and long term financing
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Finance and Risk Public-Private Partnerships
National Forum for Black Public Administrators
Accounting for Assets Cash Flows.
How Businesses Obtain Credit
Presentation transcript:

D E C E M B E R 1 2, D E C E M B E R 1 2, I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S FHWA: Northern Border Finance Workshop Detroit, Michigan S T R I C T L Y P R I V A T E A N D C O N F I D E N T I A LS T R I C T L Y P R I V A T E A N D C O N F I D E N T I A L

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Overview Private Sector Capital: A financing tool A new Detroit River International Crossing Federal Sector Capital: Co-investment 1 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Private Capital Can Add Value Aggressive use of capital to maximize asset value given a projected stream of tolls Private capital structure using both debt and equity Equity demands a higher rate of return, but may be more flexible during ramp up Optimal use of debt Upfront payment to sponsoring government, even in a new construction project Extract value from existing assets Infrastructure private purchasing power > $200 billion 2 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Infrastructure Financing Alternatives Conventional Innovative Initial Public Offering  Separate assets into operating company  Offer shares to public and maintain significant ownership  Sell additional ownership percentages over time  Likely to give more autonomy to management and attract local retail investors  Possibly lower initial proceeds than sale or concession Leverage Asset with Debt  Debt Service coverage levels to Baa/BBB rating category  Debt proceeds fund Project  No asset sale or transfer  Comply with existing bond covenants, if applicable Transfer Asset to Public Authority  Create a new Public Authority in which the sponsor has significant participation  Authority borrows funds for purchase  Authority purchases transportation assets or concession  Apply purchase price to pay existing debt and to finance new projects Public Private Concession Agreement  Accept bids for long term lease from private operators and investors  Retain asset ownership  Critical controls negotiated in concession agreement  Potential for upfront cash and revenue sharing Direct Asset Sale  Direct sale of either a portion of or entire asset  Complete divestiture of transportation assets  Parent company likely to assume control over day-to-day operations  Likely to produce maximum proceeds Brownfield or Greenfield Brownfield 3 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Infrastructure Assets are Attractive to Investors Long term, stable cashflows, inflation adjusted Low correlation to other asset classes Increase in share price due to revaluation and growth Income stream with tax deferred components Predictable Cashflow Diver sification Capita l Appr eciat ion Tax Benefits Uni que Inve stme nt Class Previously unavailable for investment Broad Appeal Traditional institutions Pension plans Hedge funds Retail investors Rapid Shift to Funded Pension Systems Shift to funded pension systems Duration match of liabilities to assets Incentive for Private Sector Participation Investment encouraged by government Long-Term Investment Returns Valued Using Discounted Cash Flow Investors seek high-yield, low risk, bond-like returns with potential for capital growth 4 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Striking the “Right” Public-Private Partnership Balance Deliver project Promote economic development Maximize financial resources Build project if it produces good financial return Generate stable long-term equity returns Maximize return on investment Public Agency Objectives: Private Sector Objectives: Long-term mindset Tailored agreements Maximize Equity Returns Maximize Traffic Flow and Economic Development Public Sector Private Sector 5 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M 1 Includes concession ($67mm for 100% implied) and construction $621mm Recent North American Road Privatizations 6 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M U.S. Transportation PPP Projects In-Progress 7 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Projects Completed Between US and Canada Blue Water Bridge Managed by: Michigan Dept. of Transportation (MDOT) & Blue Water Bridge Authority (BWBA) Description: Connects Port Huron, MI and Sarnia, ON Financing: MDOT 2005 Refunding of $54.5MM 1996 Bonds; C$100MM BWBA bonds outstanding Security: State Trunk Line Fund (MDOT); Toll revenues (BWBA) Traffic 1 : Two way traffic Notes: AA- rating from S&P (MDOT & BWBA) Bridge is tolled in both directions ,687,5595,596,9115,441,2075,568,8455,513,809 International Bridge Managed by: Federal Bridge Corporation Limited Description: Connects Sault Ste. Marie, MI and Sault St Marie, ON Financing: No bonds outstanding - $16MM issued in 1960 have been retired Security: Toll revenues Traffic 1 : One way traffic Notes: Nov. 06, JIBA proposed a toll increase to meet long term needs and decreasing revenue Bridge is tolled in both directions 1 Respective websites est. 1,898,5801,849,3821,926,6601,941,353 8 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Detroit River International Border Crossings Canada and the US have the largest bilateral trading partnership in the world Over $1 billion (USD) in daily trade 1 28% of surface trade between Canada and the US passes through the Detroit River Area 2 Currently, crossing occurs via: Ambassador Bridge —Privately owned by the Detroit International Bridge Company and the Canadian Transit Company Detroit-Windsor Tunnel —$53.5MM Macquarie concession for US side – January 2001 Detroit Windsor Rail Tunnel —Controlled by Canadian Pacific Railway, owned by CPR and Borealis Infrastructure Fund 1 Detroit River International Crossing Study - Evaluation of Illustrative Alternative on US Side of Border – Volume 2 2 Detroit River International Crossing Study - Travel Demand Forecasts 9 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Forecasted Need for a New Detroit River International Crossing By 2035, base forecast traffic is expected to increase 1 : Passenger traffic – 57% Truck traffic - 128% Capacity of the connections and plaza operations will be exceeded sooner than roads Since 1999 traffic in the Detroit River area has declined by 25% 1 Detroit River International Crossing Study – Travel Demand Forecasts (Sept. 2005) Source: DRIC Study - Travel Demand Forecast Bridge and Tunnel Operators Associations Annual Passenger Cars Annual Commercial Vehicles 2001 – US Attacked on 9/ – SARS outbreak in Canada Historical Events 1989 – FTA Agreement 1999 – Casinos open in Detroit Average annual growth rates: 10 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Forecasted Need for a New Detroit River International Crossing Crossing speed and capacity Source: Detroit River International Crossing Study – Travel Demand Forecasts 1 Based on PCE factor of 3 for commercial vehicles Base forecast physical crossing capacity exceeded: Ambassador Bridge – 2020 Detroit Windsor Tunnel I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Detroit River International Crossing Project Proposed Bridge Canadian Inspection Plaza US Inspection Plaza Canadian Highway Connection US Highway Connection A new border crossing will have five components Access roads leading to the border crossing Toll collection facilities Physical crossing Border inspection system —Primary and secondary Egress roads leading from border crossing Source: Detroit River International Crossing Study – Travel Demand Forecasts Summary of future Detroit River crossings capacity needs 12 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Recent Border Processing Improvements Ambassador Bridge Four new truck customs booths – Jan. 8, 2004 New Fast and Secure Trade (FAST) program improvements – Nov. 1, 2004 Improved technology and staffing levels have improved mobility patterns Mean Commercial Travel Times Source: Detroit River International Crossing Study – Travel Demand Forecast 1 Detroit River International Crossing Study – Travel Demand Forecasts Crossing Times – Canada to US Delay times on the critical US-bound Ambassador Bridge crossing reduced by 80% 1 13 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Political Risk Market Position Existing competition —Bridges —Rail —Ferries Alternate proposals —Detroit River Tunnel Partnership - Jobs Tunnel (~$400 million to construct) —Mich-Can - Rouge River Bridge Project (~$400-$500 million to construct) Traffic and Revenue Forecasting Competing truck toll ($USD) Investor Considerations: Detroit River Crossing Greenfield Project Socioeconomic Event Risk Source: DRIC Study – Travel Demand Forecast 14 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Funding Sources for a New Crossing State of Michigan – State Trunk Line Funds Official Statement, 2 New and Publications – Michigan Infrastructure & Transportation Association Public Private Partnerships ??? Canada  Would concession be allowed across border?  Would the restrictions from both countries deter investors from taking on the project?  A number of other crossings are privately owned – agreements? Michigan Department of Transportation In FY 2005 surface transportation revenues - $1.97 billion 1 Each year, Michigan falls more than $700 million short in meeting basic maintenance needs 2 State of Michigan Senate approved 2007 capital outlay budget contains language prohibiting any state expenditures for renewed crossing over Detroit River Federal Funding Transportation Infrastructure Finance and Innovation Act (TIFIA) —Can TIFIA be applied to the US portion? Private Activity Bonds (PABs) —Potential for use with TIFIA if allowed —Would allow for less expensive financing Province of Ontario May Ontario releases infrastructure investment plan with transportation investments of $11.4 billion by 2010 Federal Funding Transport Canada manages the Highways and Border Infrastructure Fund, with a commitment of $2.4 billion in 2006 budget Strategic Highway Infrastructure Program —5-year program to renew and enhance Canada’s highway infrastructure —$600 million dedicated to overall program, with $65 million set aside for border crossings Cost of the crossing is estimated at $1 billion United States Canada 15 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Federal-Aid Highway Program (FAHP) funded by contract authority Major criteria: National or regional significance Federal requirements (Civil Rights, NEPA, Titles 23/49 of U.S.C.) Eligible project costs must be at least: —At least $50 million or 33% or more of the State’s Federal-aid highway apportionments —Assistance cannot exceed 33% of total eligible costs Sponsor must pledge a revenue source to repay the TIFIA obligation State and local transportation approvals must be obtained Dedicated Revenue Sources Tolls, user fees, special assessments, tax increment financings and any portion of a tax or fee that produces revenue pledged for debt retirement General obligation pledges or Corporate Priority pledges No pledge of US federal funds Transportation Infrastructure Finance and Innovation Act (TIFIA): Background 16 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Loan Guarantee Direct Loan Will Generate Proceeds for Construction ProgramApplicationDirect Benefit Original Proceeds Generated? Direct Loan Line of Credit Finance/refinance eligible project costs Sponsor receives a loan with more flexibility than third party loans Yes Enhances participation by third party lenders No Guarantees loan for eligible project costs Available only after Substantial Completion No Pay debt service on obligations to finance eligible costs, O&M costs, etc. 17 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Title 23 / Title 49 Project Definition $15 billion limitation – No expiration date No annual limitation PAB Authorization PABs Can Allow Private Partners Access to Less Expensive Funding Private Ownership Can be loaned to a private entity to construct Private entity may own Private entity can keep all tolls and other revenue Private Management Can be owned by a governmental entity and leased to, or managed by, another private entity Management agreement need not comply with the limitations imposed by IRS Revenue Procedure “Qualified Highway and Surface Freight Transfer Facilities” (“Qualified Transportation Facilities”) include Any surface transportation project which receives Federal assistance under title 23, United States Code Any project for an international bridge or tunnel for which an international entity authorized under Federal or State law is responsible and which receives Federal assistance under title 23, United States Code Any facility for the transfer of freight from truck to rail or rail to truck which receives Federal assistance under either title 23 or title 49, United States Code Project must comply with Title 23 (United States Code) (Highway) and/or Section 5333(a) of Title 49 U.S.C.(Rail) TIFIA funding qualifies as Title 23 funds and will establish eligibility for PAB approval Subject to the Alternative Minimum Tax (“AMT”) AMT premium of basis points on long-term fixed rate bonds and the premium on floating-rate securities is 5 basis points Primary buyers are institutional investors AMT Depreciation & Interest Expense Private party can deduct depreciation if treated for tax purposes as the owner Generally, the private party is treated as the tax owner if: Legal owner Lease or otherwise has the right to use for their full economic lives, or Lease with a bargain payment option Private entity can deduct interest payments Significant interest rate advantage relative to taxable rates 18 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Conclusion A new crossing for the Detroit River –- or any similar project –- can only be done based on good underlying fundamentals Federal sector co-investment: TIFIA can fund project costs, and can drive down capital costs directly and indirectly Effective tool when used properly Not a magic bullet Not a pot of gold Private sector capital 19 I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S

N O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A MN O R T H E R N B O R D E R T R A N S P O R T A T I O N P R O G R A M Questions and Answers Bob Walsh, JPMorgan Securities Phone: (312) 732 – I N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E SI N F R A S T R U C T U R E F I N A N C I N G S T R A T E G I E S