Mercury Laser Driver Reliability Considerations HAPL Integration Group Earl Ault June 20, 2005 UCRL-POST-213303.

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Reliability Engineering (Rekayasa Keandalan)
1 MM3 - Reliability and Fault tolerance in Networks Service Level Agreements Jens Myrup Pedersen.
Sampling Distributions
Statistical Issues in Research Planning and Evaluation
Markov Analysis Jørn Vatn NTNU.
SMJ 4812 Project Mgmt and Maintenance Eng.
| Astronautics Research Group, Faculty of Engineering and the Environment University of Southampton,
Chapter 10 Quality Control McGraw-Hill/Irwin
Exam 1 Review u Scores Min 30 Max 96 Ave 63.9 Std Dev 14.5.
MARE 250 Dr. Jason Turner Hypothesis Testing II. To ASSUME is to make an… Four assumptions for t-test hypothesis testing:
1/55 EF 507 QUANTITATIVE METHODS FOR ECONOMICS AND FINANCE FALL 2008 Chapter 10 Hypothesis Testing.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 8-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 9-1 Chapter 9 Fundamentals of Hypothesis Testing: One-Sample Tests Basic Business Statistics.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 7 th Edition Chapter 9 Hypothesis Testing: Single.
1 Review Definition: Reliability is the probability that a component or system will perform a required function for a given period of time when used under.
Reliability Chapter 4S.
Chapter 8 Introduction to Hypothesis Testing
Section 8.2 Estimating a Population Proportion
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 2 Slide 1 Systems engineering 1.
Tracing Requirements 1. The Role of Traceability in Systems Development  Experience has shown that the ability to trace requirements artifacts through.
PowerPoint presentation to accompany
1 Product Reliability Chris Nabavi BSc SMIEEE © 2006 PCE Systems Ltd.
Division of Operation and Maintenance Engineering Division of Operation and Maintenance Engineering 1 Reliability Analysis of Switches and Crossings –
Chapter 10 Hypothesis Testing
Confidence Intervals and Hypothesis Testing - II
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap th Lesson Introduction to Hypothesis Testing.
Copyright © Cengage Learning. All rights reserved. 10 Inferences Involving Two Populations.
Copyright © 2014, 2013, 2010 and 2007 Pearson Education, Inc. Chapter Sampling Distributions 8.
14 Elements of Nonparametric Statistics
Copyright © 2012 by Nelson Education Limited. Chapter 7 Hypothesis Testing I: The One-Sample Case 7-1.
Section 8.1 Estimating  When  is Known In this section, we develop techniques for estimating the population mean μ using sample data. We assume that.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Basic concept Measures of central tendency Measures of central tendency Measures of dispersion & variability.
Reliability Models & Applications Leadership in Engineering
1 Chapter 1: Introduction to Design of Experiments 1.1 Review of Basic Statistical Concepts (Optional) 1.2 Introduction to Experimental Design 1.3 Completely.
Copyright © 2012 Pearson Education. All rights reserved © 2010 Pearson Education Copyright © 2012 Pearson Education. All rights reserved. Chapter.
Section 10.1 Confidence Intervals
Chapter 9 Three Tests of Significance Winston Jackson and Norine Verberg Methods: Doing Social Research, 4e.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Fundamentals of Hypothesis Testing: One-Sample Tests Statistics.
Chap 8-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 8 Introduction to Hypothesis.
6.1 Inference for a Single Proportion  Statistical confidence  Confidence intervals  How confidence intervals behave.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Overview.
Issues concerning the interpretation of statistical significance tests.
Reliability and availability considerations for CLIC modulators Daniel Siemaszko OUTLINE : Give a specification on the availability of the powering.
Exam 1 Review u Scores Min 30 Max 96 Ave 63.9 Std Dev 14.5.
Chapter 12 Confidence Intervals and Hypothesis Tests for Means © 2010 Pearson Education 1.
SECTION 1 HYPOTHESIS TEST FOR THE DIFFERENCE IN TWO POPULATION PROPORTIONS Two-Population Tests With Qualitative Data  A lot.
Status and Plans for Systems Modeling for Laser IFE HAPL Progress Meeting November 2001 Pleasanton, CA Wayne Meier, Charles Orth, Don Blackfield.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
MODELING AND SIMULATION CS 313 Simulation Examples 1.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 8 th Edition Chapter 9 Hypothesis Testing: Single.
CS203 – Advanced Computer Architecture Dependability & Reliability.
Normal Probability Distributions 1 Larson/Farber 4th ed.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
1 Introduction to Engineering Spring 2007 Lecture 16: Reliability & Probability.
Best in Market Pricing. What is Best in Market Pricing ? An extension of parametric modeling for negotiating lowest pricing for a statement of work consisting.
Lecture Slides Elementary Statistics Twelfth Edition
Chapter Nine Hypothesis Testing.
Hardware & Software Reliability
Unit 5: Hypothesis Testing
Modeling and Simulation CS 313
Operations Management
RAM XI Training Summit October 2018
Reliability.
Operations Management
Unit I Module 3 - RCM Terminology and Concepts
Operations Management
Chapter 5 Normal Probability Distributions.
Presentation transcript:

Mercury Laser Driver Reliability Considerations HAPL Integration Group Earl Ault June 20, 2005 UCRL-POST

RJB/VG Purpose of this work So far the HAPL project has characterized the required reliability of the laser driver by a single number, the shot life in the range of 10 8 to 10 9 shots At 10 Hz this translates into a “lifetime” of ~270 to ~2700 hours This is a simplification; the real question is “How long does an individual unit (beam line) have to run and how long do we have to repair a unit in order to achieve an acceptable system availability ?” In the work described below we deal with this question Once we know the relationship between unit failure rate and system availability we can then establish the reliability requirements for an IFE driver at the subsystem level From this we can determine how much it costs to run and repair the system at a given availability

RJB/VG Previous experience Our experience in solid state IFE storage lasers is based on single shot systems where the issue is making sure nearly all the beam lines fire at the right time and with the right power balance For a rep-rated system the additional requirement is availability, the fraction of the system that is online compared to its full up capacity In the Mercury laser the main “unreliability” is caused by optical damage of critical components Diodes, pin holes, transport optics, etc., are expected to fail gracefully, leading to degraded performance over time Critical optical elements can be single point, catastrophic failures In Mercury, comprehensive damage diagnostics allow us to intervene before catastrophic damage occurs Repairs can be effected to mitigate the cost of full replacement once damage initiation is discovered, but at a cost in dollars and availability

RJB/VG Reliability Considerations For the IFE driver we don’t yet know the characteristics of these failures because we do not have design and testing information What we can do is to use simple tools to understand what is required of these designs and see the impact of system architecture decisions For this poster we will assume that testing has caught most infant failures and the design is robust enough to have a low random failure component We assume the operations management is sufficiently mature that failures due to operator errors or QC problems are rare This leaves some sort of wear out failure, e.g., critical optical component damage, etc.

RJB/VG Wear out or lifetime failures Wear out failure Random failures Infant failure MTBF Different failure distributions

RJB/VG IRE Plant Driver Simulator A numerical simulator is used to clock through system operating hours with failed units dropping out and being repaired and coming back on-line NIF like architecture beam lines Assumptions: –All beam lines identical –Beam lines are grouped in quads (4) for delivery the the target –Have a Mean Time Before Failure that can be characterized by a Weibull distribution –Repair time equals clock tic time System availability defined as units running divided by units installed Two cases are considered: service by quad (repair 1, idle 3) and repair single beam lines while all others run normally

RJB/VG Weibull Distribution Well behaved function, found to be appropriate for complex systems characterized by a life time We define the characteristic time  as the MTBF  is a shape factor  =1 defines an exponential distribution We use  in the range of 6-10 to get a smeared out failure probability to model the statistical effect of beam lines having a distribution of life times around some mean life time Reliability function R = e -(t^  ) / 

RJB/VG Weibull distribution continued R = e -(t^  )/ 

RJB/VG Probability Matrix R = e -(t^  )/  We need to find a way to distribute the possible failure times of an ensemble of beam lines all running at the same time Form a matrix of rows equal to a reliability value and columns related to the age of the device For reliability values greater than R assign a one For values less than R assign a zero Select elements by asking the question “At a given age, what is the reliability value?” Select a value at random from the total available row values. If the element is 1, continue running. If zero, declare a failure and repair.

RJB/VG Probability Matrix continued R = e -(t^  )/  Create a matrix of 10,000 elements For this model 100 rows (related to Probability) 100 columns (related to time)

RJB/VG Test of the Probability Matrix 20,000 tries at randomly selecting matrix elements shows that the 10,000 element probability matrix displays the desired shape of a Weibull distribution Define as MTBF (probibility = 1/e)

RJB/VG Run model The model consists of a matrix of cells, each is a beam line The accumulated running hours on that line since the last repair is shown in the cell A running cell is green An idle cell is yellow A failed cell is red The program updates each cell by a tic equal to the MTTR (not required, could by any time step) Each cell is interrogated and the run time compared to the probability matrix to see if it should fail or not On the next tic all the units are back in service We keep track of the total failures, integrated failures, and availability Operating costs can then be estimated based on repair cost and number of units per day repaired Quad Beam line age hr Port bundle of single lines

RJB/VG Screen shot:Case 1 repair by quads

RJB/VG System time 1945 hr - repair as quads

RJB/VG Comments concerning the previous slides The peaks and valleys in availability as well as in the number of failures is an artifact of the system being activated 4 beams at a time. Over time they smear out as the individual beam ages become random. The failures begin to show up at a few hundred hours because the system is activated in groups every 10 hours. Therefore there is a range of ages when we start the clock The dips in availability are significant and would likely require the plant to be out of service for the repair time (5 hr in this example) Even with a MTTB of 1000 hours or 3.6x10 6 shots with a fairly broad Weibull distribution of failure life times as this example shows, system availability is over 90% most of the time If the distribution of the failures can be narrowed (a steeper Weibull centered at a given age) then is is possible to have a preventative maintenance program that could synchronize repairs with other plant activities so as to achieve higher availability when the driver is operating

RJB/VG Screen shot:Case 1 repair individually

RJB/VG System time 1400 hr - repair individually

RJB/VG Model results with beams repaired individually Target symmetry will likely require fewer out of service beams than shown in the first case This can be addressed by designing the system to allow single beam line repair, increase the individual reliability,or both Here we have relaxed the requirement to idle 3 beams when repairing a single beam while leaving the MTBF and MTTR the same We see that the availability is significantly improved, never dipping below 95% Even with an MTBF of 1000 hr (3.6x106 shots) driver performance may be adequate in terms of beam balance Obviously extended shot life and the possibility of a preventative maintenance program will reduce costs and down time

RJB/VG Summary The minimum availability the plant can tolerate will depend on the beam bundling architecture, power balance on target, and beam symmetry Integration choices and selection of LRU unit design are important issues that ultimately drive system performance This tool allows us to study these questions and can be extended to the reliability assessment at the beam line or lower level In addition, the simulator gives us a way to partition the system into appropriate LRUs for optimum repair and operation With these two simple examples we see the impact of the decision to repair at the quad level as in a NIF architecture (4 beams, 3 idle, 1 repaired) verses ability to repair at the single beam level