New England’s Power System: At a Crossroads – Again! Stephen Rourke VICE PRESIDENT, SYSTEM PLANNING NECPUC Symposium: Governors’ Infrastructure Initiative.

Slides:



Advertisements
Similar presentations
Electricity Industry The Potential Effect of Locational Marginal Pricing on Renewable Resources for Environmental Issues in Energy NECPUC Annual Symposium.
Advertisements

Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Enhancing Capacity Markets to Improve Resource Performance and Investment Pay For Performance: New England’s Capacity Market OPSI 10 TH ANNUAL MEETING.
Resource Adequacy in PJM
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
Reliability Risks and Lessons Learned In The Wake Of The Polar Vortex OPSI Annual Meeting October 14, 2014.
RGGI Leakage Workshop Presentation June 15, 2006 Stephen J. Rourke Vice President, System Planning ISO New England.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
David Schlissel and Cathy Kunkel When, Not If: Bridgeport’s Future and the Retirement of PSEG’s Coal Plant January 23, 2014.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Transitioning to a Cleaner Energy Supply. Catalyzing climate solutions …in the lab …in the classroom…on our campus.
SEPTEMBER 29, 2014 | CONCORD, NH Eric Johnson DIRECTOR, EXTERNAL AFFAIRS New Hampshire Energy Summit Lessons Learned from Winter 2014 and How the ISO Is.
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Governors’ Wind Energy Coalition November, 2011 Competitive.
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
Policy Research Shop Support for the Policy Research Shop is provided by the Fund for the Improvement of Postsecondary Education, U.S. Department of Education.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Overcoming Challenges To Integrating Renewable Energy Resources May 16, 2013 Paul Roberti, Commissioner Rhode Island Public Utilities Commission.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
Transmission – A Brief History, and…What’s Next? Jim Muntz March 20, 2013.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Market Response to Winter Dupont Group Energy Summit New England Power Generators Association Carol J. Holahan, Esq. October 5, 2015.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
Monterey Plaza Hotel October 8-10, 2007
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Connecticut Department of Energy and Environmental Protection March 24, 2016 Presentation to the Energy & Technology Committee Informational Forum on Adequacy.
Matthew Wittenstein Electricity Analyst, International Energy Agency
2017 Integrated Resource Plan
Massachusetts Electric Restructuring Roundtable
Evolving Economic Dispatch in SPP
The Future of Demand Response in New England
Michael I. Henderson ISO New England Inc.
Draft 2013 Energy-Efficiency Forecast
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
New England Resource Adequacy
About Dominion: One of America’s Leading Energy Companies
New England Electricity Restructuring Roundtable September 18, 2009
Alternative ICAP Proposal
Bringing Power from the North
Creating Benefits for New England: Putting the Pieces Together
February 28, 2014 | Boston, MA Enhancing Capacity Markets to Improve Resource Performance and Investment in New England Restructuring Roundtable Robert.
Bringing Power from the North
Wholesale Electricity Costs
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

New England’s Power System: At a Crossroads – Again! Stephen Rourke VICE PRESIDENT, SYSTEM PLANNING NECPUC Symposium: Governors’ Infrastructure Initiative Panel JUNE 16, 2014 | STOWE, VT

Overview of Presentation Historical Perspective Strategic Planning Initiative Update Recent Planning Tools Integrating Renewables Resource Performance and Flexibility Retirements Gas Dependence 2

Familiar Doctor’s Office Pain Chart Will Help Us Assess Grid Challenges Today Choose the Face that Best Describes How You Feel No Pain Distressing Pain Unbearable Pain 0 No Hurt 2 Hurts Little Bit 4 Hurts Little More 6 Hurts Even More 8 Hurts Whole Lot 10 Hurts Worst 3

Difficult Grid Conditions Are Not New New England’s system faced and overcame painful times 1970s & 1980s: Oil embargos 1980s: Rapid load growth plus resource performance issues and capacity shortages 1990s: Nuclear shutdowns and emergency actions 2000s: Southwest CT reliability problems, gap RFP and reliability agreements; cold snap 4

ISO New England’s Strategic Planning Initiative Focused on developing solutions to the region’s top reliability risks Reliability requires a flexible, high-performance fleet: Natural Gas Dependency – “Just-in-time” fuel delivery presents an immediate risk to reliability Power Plant Retirements – New England will need new ways to meet peak demand as aging plants close Renewable Resource Integration – Balancing variable generation with reliability will require changes in system operations 5

6 EE Flattens Annual Energy UsePV Forecast Shows Significant Growth ISO Forecasting Solar and Energy Efficiency Anticipating impacts of state policy priorities

ISO is Implementing Enhancements to Modeling of Capacity Zones 7 Maine Rest of Pool (NH, VT, WCMA) NEMA SEMA/RI CT ISO will model up to 5 capacity zones in the next Forward Capacity Auction (FCA 9), in February 2015 – CT, NEMA and SEMA/RI will be evaluated as potential import-constrained zones – Maine will be evaluated as a potential export-constrained zone

Market Resource Alternatives ISO conducted studies analyzing alternatives to transmission Studies looked at a mix of generation, load reduction and transmission upgrades Vermont and New Hampshire (2011) – About 900 MW of supply-side resources needed to resolve thermal issues in six of the nine NH/VT study sub-areas Greater Hartford (2012) – The supply-side MRA analysis shows that approximately 950 MW of generation is required to resolve all the identified thermal needs Southeastern Massachusetts and Rhode Island (2014) – Approximately 941 MW of generation/load reduction would be required to resolve all the identified N-1 thermal needs – Process updated to utilize a hybrid of small transmission fixes along with generation and demand resources 8

Variable Resources are Trending Up 9 Nameplate capacity of existing wind resources and proposals in the ISO-NE Generator Interconnection Queue; megawatts (MW) Final Interim ISO-NE Solar PV Forecast, based on state policies. MW values represent nameplate ratings Interconnection Issues: Wind resources often interconnect in remote areas, on weak transmission lines, and must grapple with congestion State PV interconnection standards and lack of control or visibility are concerns for ISO

Gas Units Fell Below Their Capacity Obligations This Winter System ran with only 3,000 MW of gas-fired generation out of 11,000 MW with obligations in the capacity market Assuming winter 2013/14 weather, this condition existed on 20 days 10

Generator Non-Price Retirement Requests Almost 3,400 MW of generation plan to retire within the next five years Salem Harbor Station (749 MW) – 4 units (coal & oil) Vermont Yankee Station (604 MW) – 1 unit (nuclear) Norwalk Harbor Station (342 MW) – 3 units (oil) Brayton Point Station (1,535 MW) – 4 units (coal & oil) Total MW Retiring in New England* Connecticut348 MW Maine37 MW Massachusetts2,360 MW New Hampshire1 MW Rhode Island13 MW Vermont634 MW Total3,393 MW 11 Major Retirement Requests: *Megawatts based on relevant Forward Capacity Auction (FCA) summer qualified capacity (NOTE: total includes full and partial generator Non-Price Retirement (NPR) requests for Capacity Commitment Period (CCP) through CCP ; does not include NPRs for demand response (DR) resources) Source: Status of Non-Price Retirement Requests; October 23, 2013 Other Retirements Looming

Generator Proposals in the ISO Queue Almost 7,000 MW By Type By State Note: Some natural gas include dual-fuel units (oil) 12 Source: ISO Generator Interconnection Queue (April 2014) FERC Jurisdictional Only

Conclusions Some good news State policies are bringing energy efficiency and renewables onto the system A lot of activity in the interconnection queue Transmission for reliability helps ease some retirement concerns New England has a proven history of overcoming energy and capacity challenges Some not so good news New England has a growing reliability problem due to natural gas availability constraints and declining resource performance Expected non-gas retirements will increase demands on an already constrained natural gas system Major market enhancements and energy infrastructure improvements are years away 13

14