Local PDS and Installation Model in ILC KEK Fukuda 2014/4/8 CFS-ADI Joint Meeting 1 Contents Common Local PDS in TDR Installation Model in XFEL What is.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/2010 DRFS HLRF System KEK S. Fukuda Introduction: Basic Concept of DRFS Progress.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Christopher Nantista ILC 2 nd Baseline Assessment Workshop (BAW-2) SLAC January 18, …… …… …… … ….
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Status of KEK STF-HLRF S. Fukuda KEK. October 1 HLRF KOM S.Fukuda 2 Stuffs of HLRF&LLRF(RF group in KEK Linac team) Leader S. Fukuda Modulator M. Akemoto,
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Power Distribution System R&D at SLAC Christopher Nantista ILC08 Chicago, Illinois November 18,
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Power Distribution System (PDS) Design and R&D Status Christopher Nantista SLAC SCRF Fermilab April 24, 2008.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
RDR Linac Definition  Tasked Cryomodule & Cryogenics Groups with defining cryomodule length and cryoplant layout First pass generated at Jan CERN.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
June Recent Development of DRFS (Fukuda) SCRF-Meeting 1 1 Recent Development of DRFS (Based on Japanese CFS Tunnel Plan) S. Fukuda KEK.
Detail plan of S1-Global H. Hayano (KEK),
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
Plug-compatibility interface for Input Coupler LCWS13-AWG7-SCRF H. Hayano
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Summary of Relative RF Distribution Costs with Gradient Considerations (Work in Progress) Chris Adolphsen SLAC.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Two-beam module layout
SPL RF coupler: integration aspects
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
Cryomodule test stand at ESS site
Preparation for DESY Meeting
Meeting for S1-Global module design Cryomodule and Cryogenics
S1-G Webex meeting Global Design Effort
List of changes and improvements for the next generation CLIC module
Yamamoto WG3: ML-SCRF Parallel Session,
Design of Distribution Feedbox at LHC P7
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
SNS Coupler Shipping Plans
Presentation transcript:

Local PDS and Installation Model in ILC KEK Fukuda 2014/4/8 CFS-ADI Joint Meeting 1 Contents Common Local PDS in TDR Installation Model in XFEL What is the cost effective way to install PDS Mechanical concept of local PDS Supporting to cryomodule Transportation and Installation

Common Local PDS in TDR 2014/4/8 CFS-ADI Joint Meeting 2 KCS DKS

Installation Model in XFEL Layout of Cryomodule with PDS in XFEL 2014/4/8 CFS-ADI Joint Meeting 3

What is the cost effective way to install PDS? 2014/4/8 CFS-ADI Joint Meeting 4 Pre-installation of Local PDS at the another place makes us possible to pre-measure the low level RF and check/adjust the PDS with Cryomodule/Cavity System. Then increase of the reliability reliability is expected. Bolting the flange at the sc tunnel results in involving the mistakes and imperfect connecting of waveguide system, and results in high labor cost due to the work in the narrow space. PDS system in the independent supporting frame requires eight or nine connections between PDS and couplers and possible mistakes are not rejected. Therefore this model realizes cost effective and reliable installation.

PDS supporting system concept 2014/4/8 CFS-ADI Joint Meeting 5 Input Coupler Support x 9(8) Isolator Support X 9(8) High power VTO x 2 Input WG X 2 #1 Cryo #2 Cryo #3 Cryo

Transportation of Cryo-PDS Module -Corridor Dimension- 2014/4/8 CFS-ADI Joint Meeting 6

Transportation of Cryo-PDS Module 2014/4/8 CFS-ADI Joint Meeting 7 In the first installation case, red circle area is empty. Keeping the area where man can escape during the transportation of replacing cryomdule when accident occurs. Connection Work required

Installation of the Cryo-PDS Assembly 2014/4/8 CFS-ADI Joint Meeting 8 2~3 ideas for transportation of cryomodule-PDS Assembly For two girders case, assembly on the carrier girder is carried by vehicle and shifted to locally fixed girder Assembly on the girder system is carried by roller system

Application of this idea to KCS Single Tunnel (rough check of dimension) 2014/4/8 CFS-ADI Joint Meeting 9 Assembly without high-power VTO : Cryo having downstream WG after rectangular window High-power VTO is Installed in tunnel

Summary 2014/4/8 CFS-ADI Joint Meeting 10 Conceptual assembly which is useful to install are described. Local power distribution is holded by the cryomodule system, which has many advantages such as reliability and cost effectiveness. Transportation of this assembly and installation are considered. Real model should be manufactured and we (KEK) are planning to demonstrate this system.