PLAnetary Transits and Oscillations of stars PLATO Consortium kick-off meeting.

Slides:



Advertisements
Similar presentations
Spectro-Polarimetric High-contrast Exoplanet Research
Advertisements

Giampaolo Piotto Dipartimento di Astronomia - Università di Padova PLAnetary Transits & Oscillations of stars Search for and.
PLAnetary Transits and Oscillations of stars H. Rauer 1, C. Catala 2, D. Pollacco 3, S. Udry 4 and the PLATO Team 1: Institut für Planetenforschung, DLR.
A Search for Earth-size Planets Borucki – Page 1 KEPLER; Data Validation and Follow Up Observations CoRoT Symposium W.J. Borucki & the Kepler Team 5 February.
Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, Dec.
MAROON-X: An instrument for identifying another Earth
Telescope Optical Units (TOUs)
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
Stellar analysis system (SAS*) WP370 T. Appourchaux Institut d’Astrophysique Spatiale, Orsay *SAS= Special Air Service or Son Altesse Sérénissime.
NEAT: Very high precision astrometry to detect nearby planetary systems down to one Earth mass F. Malbet, A. Crouzier, M. Shao, A. Léger and the NEAT collaboration.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
G. Micela – Bologna 5/03/2009  PLATO in the context of the extrasolar planet research Giusi Micela (INAF-OAPa)
SEARCHING FOR PLANETS IN THE HABITABLE ZONE. FROM COROT TO PLATO Ennio Poretti – INAF OAB.
Prospects for asteroseismology of solar-like stars T. Appourchaux Institut d’Astrophysique Spatiale, Orsay.
Exoplanet- Asteroseismology Synergies Bill Chaplin, School of Physics & Astronomy University of Birmingham, UK EAHS2012, Oxford, 2012 March 15.
Science Opportunities for HARPS-NEF David W. Latham PDR - 6 December 2007.
PPLC/ESA meeting, Feb 27th 2009 Gérad Epstein Patrick Levacher. OVERALL PAYLOAD CONCEPT TRADE-OFFS AT SYSTEM LEVEL PLATO.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
The Search for Earth-sized Planets Around Other Stars The Kepler Mission (2009)
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
PLAnetary Transits and Oscillations of stars Thierry Appourchaux for the PLATO Consortium
1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.
The NASA/NExScI/IPAC Star and Exoplanet Database 14 May 2009 David R. Ciardi on behalf of the NStED Team.
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PlanetVision: Belgian-Spanish project for the characterization of planetary systems, stars and planets A. Moya and H. Deeg et al. (Spain) C. Aerts and.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
The life of stars & their planets a space science concept presented in the context of « Cosmic Vision »
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
6/11/2012 Building on NEAT concept - M. Gai - INAF-OATo 1 Building on NEAT concept M. Gai – INAF-OATo (a) Extension of science case (b) Payload implementation.
Characterising exoplanetary systems with space-based Bracewell interferometers ARC meeting Denis Defrère Liege, 19 February 2009.
Toward Detections and Characterization of Habitable Transiting Exoplanets Norio Narita (NAOJ)
Photometric detection of the starlight reflection by a “Pegasi” planet Martin Vannier (1), Tristan Guillot (2), Suzanne Aigrain (1) (1) ESO, Chile (2)
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
 PLATO PLAnetary Transits & Oscillations of stars Data onboard treatment PPLC study February 2009 on behalf of Reza Samadi for the PLATO data treatment.
G. Ricker (MIT) George Ricker MIT Kavli Institute Transiting Exoplanet Survey Satellite David Latham SAO 30 May 2008.
CoRoT-BrazilPierre BARGE Exoplanet Working Groups CoRoT Brazil Workshop Natal 2004 : oct 29th – nov 2th.
1 Leonardo Pinheiro da Silva Corot-Brazil Workshop – October 31, 2004 Corot Instrument Characterization based on in-flight collected data Leonardo Pinheiro.
Aldo Dell'Oro INAF- Observatory of Turin Detailed analysis of the signal from asteroids by GAIA and their size estimation Besançon November 6-7, 2003.
Travis Metcalfe (NCAR) Asteroseismology with the Kepler Mission We are the stars which sing, We sing with our light; We are the birds of fire, We fly over.
1 WB/lct CCD OVERVIEW Kepler will have 42 CCDs 2,200 column x 1,024 row full frame CCDs Field of View (FOV) > 100 square degrees (113 w/ vignetting)
PLATO Data Center: Purpose and Structure Laurent Gizon (PDPM) Hamed Moradi (PDC Project Office)
A STEP Expected Yield of Planets … Survey strategy The CoRoTlux Code Understanding transit survey results Fressin, Guillot, Morello, Pont.
Exoplanet Science Don Pollacco QUB. Overview PLATO’s objectives and space Work packages in the definition phase Timescales and aims of the definition.
Early science on exoplanets with Gaia A. Mora 1, L.M. Sarro 2, S. Els 3, R. Kohley 1 1 ESA-ESAC Gaia SOC. Madrid. Spain 2 UNED. Artificial Intelligence.
The Multi-object APO Radial-Velocity Exoplanet Large- area Survey (MARVELS) with the SDSS Telescope Jian Ge, University of Florida Steering Committee Members:
Exoplanet Characterization with JWST
X-ray and observational Astronomy Detection limits for close eclipsing and transiting sub- stellar and planetary companions to white dwarfs in the WASP.
Chair : M. Deleuil. 3.5º Main target m v  6 Secondary targets m v < 9 Exoplanet field 2.8º N Focal plane:
The Role of Transiting Planets Dave Latham (CfA) 30 May 2008.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
Corot:Ubatuba Nov The Ground Segment: Data Processing. Software development in laboratories. Brazilian contribution. Michel Auvergne Réza Samadi.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
PLAnetary Transits and Oscillations of stars Claude CATALA Observatoire de Paris, LESIA Main Science Requirements.
The Search for Another Earth Exoplanets and the Kepler Spacecraft.
Astronomy 3040 Astrobiology Spring_2016 Day-7. Homework -1 Due Monday, Feb. 8 Chapter 2: 1, 3, 16 23, 24, 26 29, 30, , 54, 56 The appendices will.
PLATO INPUT CATALOG (PIC) Giampaolo Piotto Dipartimento di Astronomia Universita’ di Padova.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
The Kepler Mission S. R. Kulkarni.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Strategy of radial velocity follow-up
3677 Life in the Universe: Extra-solar planets
Strategies to detect Earth-like planets around nearby stars
CoRoTLux ongoing activity
CHEOPS - CHaracterizing ExOPlanet Satellite
Search and Characterization
Presentation transcript:

PLAnetary Transits and Oscillations of stars PLATO Consortium kick-off meeting

Day 1: - plenary meeting - hosted by CNES (thank you!) - goal = browse all aspects of the mission - opportunity for each consortium participant to learn about the parts of the project that he (she) doesn’t know Messages to all speakers: Please respect your time allocation (includes discussion): very tight schedule today !! Please send your presentation to AS SOON AS This evening: reception in Salle Cassini at Observatoire de Paris, starting at 19:30 Day 2: - splinter meetings at Observatoire de Paris: payload, PDC, PSPM - goal = organize the work of the three elements of the project - joint PDC + PSPM splinter in the morning A few details on the meeting organization

Main objective: - detect and characterize exoplanets of all kinds around stars of all types and all ages  full statistical study of formation and evolution of exoplanetary systems - including telluric planets in the habitable zone of their host stars Three complementary techniques: - photometric transits : R p /R s (R s known thanks to Gaia) - groundbased follow-up in radial velocity : M p /M s - seismic analysis of host-stars (stellar oscillations) : R s, M s, age > measurement of radius and mass, hence of planet mean density > measurement of age of host stars, hence of planetary systems Tool: - ultra-high precision, long, uninterrupted, CCD photometric monitoring of very large samples of bright stars: CoRoT - Kepler heritage - bright stars: efficient groundbased follow-up and capability of seismic analysis PLATO Science Objectives

monitor in ultra-high precision photometry a very large number of bright and very bright stars The PLATO challenge

Instrumental Concept - 32 « normal » cameras : cadence 25 sec - 2 « fast » cameras : cadence 2.5 sec, 2 colours - pupil 120 mm - dynamical range: 4 ≤ m V ≤ 16 optical field 37° 4 CCDs:  m « normal » « fast » focal planes fully dioptric, 6 lenses + 1 window Very wide field + large collecting area : multi-instrument approach optical design On board data treatment: 1 DPU /2 cameras + 1 ICU Science ground segment Orbit around L2 Lagrangian point, 6+2 year lifetime

Concept of overlapping line of sight 4 groups of 8 cameras with offset lines of sight offset = 0.35 x field diameter Optimization of number of stars at given noise level AND of number of stars at given magnitude 37° 50°

~ 50% of the sky ! CoRoT Kepler PLATO 1. two long pointings : 3 years or 2 years 2. « step&stare » phase (1 or 2 years) : N fields 2-5 months each Observation strategy and sky coverage

Expected noise level shot noise + readout noise + background noise + jitter + digitization noise 27 ppm 80 ppm 800 ppm fast cam 8 cam 16 cam 24 cam32 cam jitter/confusion + background photon noise photon noise limited up to m V =11

Performances as a function of noise level as a function of magnitude PLATO (4300 deg 2 )20,000 deg 2 KEPLER (100 deg 2 ) noise level (ppm/√hr) nb of cool dwarfs & subgiants long monitoring mVmV nb of cool dwarfs & subgiants incl. step&stare nb of cool dwarfs & subgiants mVmV 2720, ,4001, , ,000,00025, ,32683, , ,0001,30011

PLATO Mission Consortium - Study, develop and deliver instrument: cameras + DPS - Study, develop and operate PLATO Data Centre - Milestones: Oct. 29, 2010: Answer to the ESA AO Nov. 9 &10, 2010: PMC kick-off meeting May 2011: Preliminary Instrument Requirement Review (PIRR) provide documentation by end of April on all aspects of the mission Jun. 2011: M2 down-selection by SPC Oct. 2011: Instrument Design Consolidation Review (IDCR) Dec 2011: Official end of definition phase Jun. 2012: Instrument Preliminary Design Review (PDR)

ESA project team End-to-end Simulator W. Zima PLATO Payload Management PIPM: P. Bodin PDC PDPM: L. Gizon Instrument System Coordinator P. Levacher Science Coordination H. Rauer Target/field Characterization G. Piotto FU Coordination S. Udry Stellar Science M.J. Goupil Exoplanet science D. Pollacco TOU R. Ragazzoni Fast DPU G. Peter Normal DPU Ph. Plasson PLATO Mission Consortium Science Preparation Management Algorithms R. Samadi Mission management AEU S. Fredon ICU R. Cosentino Prototype & FM AIV P. Levacher main / ancillary database system architecture R. Burston exoplanet analysis System N. Walton data processing implementation I. Pardowitz stellar analysis system T. Appourchaux Input Catalogue P. Giommi Data Centre Normal TOU R. Ragazzoni Fast TOU W. Benz Project Manager Project ScientistScience Team - 6 PMC members - 2 Legacy Scientists PMC Board ancillary database content management M. Deleuil data analysis support tools L. Gizon FPA/FEE D. Walton/M. Mas Hardware & boot software M. Mas Application software Ph. Plasson PMC Lead C. Catala Camera Management D. Laubier DPS Management B. Pontet Payload SOC data processing algorithms R. Samadi Additional programs W. Weiss