MONALISA LiCAS D.Urner +, A. Reichold +, G. Grzelak* P. Coe +, C. Uribe-Estrada +, Y. Han + M. Warden +, J. Dale +, G. Moss + P. Brockill +, S. Cohen +,

Slides:



Advertisements
Similar presentations
Frequency Scanning Interferometry (FSI) measurements
Advertisements

ICSO High Accuracy Laser Telemetry for Kilometric Distance Measurement in Space C.COURDE, H. PHUNG Duy, M. LINTZ, A. BRILLET ARTEMIS, Observatoire.
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
AMULET Advanced Metrology Using LasEr Tracers John Dale.
The LiCAS FSI Subsystem Current Status and Initial Measurements John Dale for the LiCAS Collaboration IOP HEP April 2008.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham*, Edward Botcherby*, Paul Coe*, Grzegorz Grzelak*, Ankush Mitra*, Johannes Prenting.
LiCAS Project: FSI Overview Richard Bingham, Edward Botcherby, Paul Coe, John Green, Grzegorz Grzelak, Ankush Mitra, John Nixon, Armin Reichold University.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Warsaw University LiCAS Linear Collider Alignment & Survey IWAA08, G. Moss 1 The LiCAS LSM System First measurements from the Laser Straightness.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
MONALISA David Urner, Armin Reichold, Paul Coe, Matthew Warden, Geoff Rayner Monitoring Alignment and Stabilisation with high Accuracy (Previously known.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
1 StaFF Progress Report David Urner University of Oxford.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
LiCAS Applied Geodesy Group Warsaw University , RHUL, EuroTeV WP7, LiCAS Armin Reichold, LiCAS Linear Collider Alignement and Survey.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
MONALISA: The precision of absolute distance interferometry measurements Matthew Warden, Paul Coe, David Urner, Armin Reichold Photon 08, Edinburgh.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
WP3 The LiCAS Laser Straightness Monitor (LSM) Greg Moss.
MONALISA Compact Straightness Monitor (CSM) simulation and Calibration Summer Project 2008.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 1 / 26 MONALISA Laser based alignment and stability monitoring.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
MONALISA Update David Urner ATF2 Meeting Dec
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
LiCAS Simulation Based on: Simulation of the LiCAS survey system for the ILC by G. Grzelak¤, A. Reichold+, J. Dale+, M. Dawson+, J. Green+, Y. Han+, M.
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
WP3 Frequency Scanning Interferometry Analysis Techniques for the LiCAS RTRS John Dale.
Continuous Frequency Scanning Interferometry
Alignment and stability session
David Urner Oxford University/JAI
Summary FD Support System
Topics on Vibration Issues
Laboratories in Annecy working on Vibration Stabilization
First Data from the Linear Collider Alignment and Survey Project (LiCAS) The ILC requires unprecedented accuracy, speed and cost efficiency for the survey.
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC-ILC BDS & MDI work.
AMULET Advanced Metrology Using LasEr Tracers (and various other bits)
IP configuration session
David Urner, Armin Reichold , Paul Coe, Matthew Warden, Geoff Rayner
Presentation transcript:

MONALISA LiCAS D.Urner +, A. Reichold +, G. Grzelak* P. Coe +, C. Uribe-Estrada +, Y. Han + M. Warden +, J. Dale +, G. Moss + P. Brockill +, S. Cohen +, M. Jones +, R. Wastie + J. Prenting #, M. Schlösser # J. Hickish +, J. Hobbs +, I. Coulter +, A. Lancaster +, P. Gloster + + JAI/Oxford University, *DESY Hamburg, # University of Warsaw Uppsala 28 Aug. 2008

David Urner, Uppsala 28 Aug 2008 LiCAS Linear colliders will operate at ultra-low emittance: –Very tight alignment tolerances –Long tunnels-> slow and expensive survey if done by hand Solution: LiCAS 1 –Use high resolution of interferometer –Fast: Build fully automated robot train RTRS 2 –Cheap: Single “expensive” production of light, multiple inexpensive readout 1 Linear Collider And Survey 2 Rapid Tunnel Reference Surveyor

David Urner, Uppsala 28 Aug 2008 Principle of Overlapping Measurements

LiCAS Measurement Unit Assembly Assembly = VERY hard work for very long time under clean room conditions Oxford workshop and students essential (overtime, weekends, long hours, fast turnaround) PT-100 Dowels The incredible triple handed Oxford graduate student in action Don’t touch this or that nor any of the other 5 hidden quills LSM collimator Pico-Motor limit switch put it there 6 mounted internal FSI collimators front view rear view Pellicle beam splitter

David Urner, Uppsala 28 Aug 2008 The Real Thing

David Urner, Uppsala 28 Aug 2008 LSM Extraction of the y-position Limited by electronics feed-trough –Use averaging improves resolution by factor 5 –Solve hardware problem z y CCD Camer a Retro reflector Incomi ng beam Outgoi ng beam 1.6 µm before Processing 15 µm Long term motion due to LSM launch rotation y-position Summed y-position

David Urner, Uppsala 28 Aug 2008 FSI Phase = 2π (Optical Path Distance) / Wavelength Φ = 2π D / λ = 2π D (ν / c) D = (c/ 2π) (ΔΦ/Δnu) R = (c/ 2π) (Δθ/Δnu) D = R (ΔΦ/Δθ) Frequency Scanning Interferometry frequeny scanning Reference interferometer

David Urner, Uppsala 28 Aug 2008 External FSI Stability –Data: 14h –Micron level 5 µm 2.52 µm 2 µm 1.14 µm Typical length distribution Single Interferometer: Resolution between  m

David Urner, Uppsala 28 Aug 2008 Other important efforts Internal FSI: Measure Distance along train and cross check LSM Simulation of entire train Calibration of all measurements with respect to each other using Least Squares Method Thousands of details

David Urner, Uppsala 28 Aug 2008 Outlook Much of Data still under analysis –Gregg Moss and John Dale finishing their thesis. Funding situation means no immediate development from Lab-instrument into surveyor-instrument Goal: –Publish method and results –Ready to take out of drawer, if need arises.

David Urner, Uppsala 28 Aug 2008 MONALISA Is an interferometric metrology system for continuous monitoring of position critical accelerator components Consists of a fixed network of evacuated interferometric distance meters Requires: –Nanometre type resolutions over O(10m) –Scalable to large numbers of components

David Urner, Uppsala 28 Aug 2008 Beam based feedback Survey and initial alignment required. Working alignment needs to be maintained / restored. –between trains 200 ms is long enough for several 100 nm movement –Take into account long term drifts –after push-pull events: IR hall floor will move after rolling two heavy detectors –after shutdown periods A cheap position monitoring system of critical elements is your friend.

David Urner, Uppsala 28 Aug 2008 MONALISA: Benefits Monitoring fiducial locations on key components after interruption of beam – independently follows changes in alignment during commissioning / start up –improves understanding of machine behaviour before accelerator operation –speeds up initial convergence of machine more reliable accelerator operation –lower chance of damage –luminosity can only win Return detector / QDzero position after push-pull at ILC expect to get micron repeatability –for return of magnet positions –but compared to which location? get machine within beam based capture range –improves switchover time In discussion with detector collaborations about including system in into design

David Urner, Uppsala 28 Aug 2008 Main Component: CSM ( Compact Straightness Monitor) 6D position transferred from left to right –Integral use of sturdy endplates required. Preliminary simulation results of CSM Resolution: –  y :10nm – distance meter resolution: 1nm = Resolution in z-direction – Positional change of optics components with respect to each other: 1nm. –Using Least Chisquare Method employed by LiCAS: Calibration of unknown positions of launch heads by multiple measurements Preliminary studies indicate that results within a factor of 2 are achievable. 10cm

David Urner, Uppsala 28 Aug 2008 Interferometer operation Phase = 2π (Optical Path Distance) / Wavelength Φ = 2π D / λ = 2π D (ν / c) D = (c/ 2π) (ΔΦ/Δnu) R = (c/ 2π) (Δθ/Δnu) D = R (ΔΦ/Δθ) ΔD = (c/2π ν) ΔΦ Fixed Frequency Interferometry Frequency Scanning Interferometry frequeny scanning

David Urner, Uppsala 28 Aug 2008 Interferometer operation Intensity

David Urner, Uppsala 28 Aug 2008 Distance meter Measurement Frequencies: –FFI:up to 10kHz –FSI:up to 1Hz Long term stability determines low frequency behaviour –Minutes possible –Lot of work needed to extend to hours or days. Advantage of interferometric measurement system is fairly low cost per line. –Use of telecom frequency allows use of cheap commercial hardware –Cheap amplification of light –Current estimate: as low as £800 per distance metre Not including the main setup

David Urner, Uppsala 28 Aug 2008 Vacuum System 8 way fibre ribbon Tapered hole Vacuum vessel wall

David Urner, Uppsala 28 Aug 2008 Atm vac Changing Pressure Good agreement between FSI and FFI Decent correlation between pressure and measured OPD Displacement (microns) Calculated overall change: 69  m

David Urner, Uppsala 28 Aug 2008 Photo Amplifiers adapted from LiCAS Switchable between AC (for FSI), DC (for FFI) Improved components, for temperature insensitivity Artwork and design close to be ready to be sent out

David Urner, Uppsala 28 Aug 2008 Fixed Frequency Interferometry Improvement of amplifier to reduce temperature dependence Test of Amplifier for White Noise behavior: –Linear with laser power –With high laser power translates to 1pm/√Hz Spectrum above 1kHz seems to be white noise dominated Spectrum below 1kHz clearly vibration dominated –Vibration Isolation –Stable launch head Eventually see effects from –Air turbulences –Laser frequency instabilities Titanium

David Urner, Uppsala 28 Aug 2008 Laser Stability Eurotev note –Describes frequency characterization of our lasers Frequency fluctuation spectra Comparision by distance metre Frequency fluctuation spectra Comparision by beat frequency

David Urner, Uppsala 28 Aug 2008 Frequency Stabilisation Lock laser to spectral feature of rubidium Use a frequency doubling crystal to reach this frequency

David Urner, Uppsala 28 Aug 2008 Frequency Stabilisation All parts are at Oxford Mechanical assembly in progress

David Urner, Uppsala 28 Aug 2008 USB readable ADC adapted from LiCAS 2.7 MHz readout Store all 16 channels worth of FSI Data for single measurement Switch to continual readout mode for FFI at 2.7MHz/8 for all 16 channels Down-sampling (averaging) from 2.7 MHz to as low as 50Hz. Data throughput ~ 25 MHz 80 channels built DLL for USB readout integrated into Labview Data finally stored together with slow data such as temperature or pressure and META-data in GIACONDE binary format.

David Urner, Uppsala 28 Aug 2008 Data Analysis Data can be analysed in several layers –Directly by Labview Simple but quick Check quality at data acquisition –By Java structure developed together with LiCAS able to deal with large data files Apply established procedures and calibrations Assemble different data stream and store in Giaconde Store selected data in ASCII readable by MATLAB –Experimental and Flexible data analysis in MATLAB

David Urner, Uppsala 28 Aug 2008 Outlook Deployment at ATF2 at KEK to monitor relative positions of QD0 and IP measuring device Further development of system in framework of FP7 at CTF3 –Monitoring of CLIC qudrupole magnet on CLIC girder –Stabilization test facility improve our ultimate resolution as needed for CLIC final focus Compare interferometric with seismic sensors Shintake Monitor and IP BPM To measure beam size and location QD0 MONALISA Monitor ATF2 beam