S.Kopp: NuFact ’02, Imperial College, London 1 The NuMI Neutrino Beam I. Status of 0.4MW Beam II. Potential for 1.6MW II. What’s it Good For? Sacha E.

Slides:



Advertisements
Similar presentations
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
The JPARC Neutrino Target
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
FNAL Target Related Capabilities PASI 2013 Working Group 1 P. Hurh (FNAL)
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
NuMI Horn Construction and Testing
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NuMI Run II meeting Nov. 4, 2004 NuMI Target Hall Jim Hylen Page 1 NuMI Target Hall Status / Plan 8 slide introduction to target hall 9 slide list of status.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
LBNF Neutrino Beam Jim Strait, Fermilab For the LBNF/DUNE Team
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
NuMI 2 nd High Power Targetry Workshop October 2005 NuMI Target Status and Future Pat Hurh Page 1 NuMI Target Status and Design Study for Proton Driver.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Status Update of Ongoing Efforts for NuMI Horn 1 Stripline Redesign and Horn Change Out Kris E. Anderson All Experimenter’s Meeting 06-Jul-2015.
Long Baseline Experiments at Fermilab Maury Goodman.
Dec. 13, 2001Yoshihisa OBAYASHI, Neutrino and Anti-Neutrino Cross Sections and CP Phase Measurement Yoshihisa OBAYASHI (KEK-IPNS) NuInt01,
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
120 GeV Targeting Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Fermilab AAC meeting August 8, 2007 With thanks to Patrick.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
MINOS/NO A Deborah Harris Fermilab NuFact’04 Osaka University July 28, 2004.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
J T Volk Fermilab April 2008 Ground Motion Studies at Fermi National Accelerator Laboratory James T Volk Applications Physicist II Vladimir Shiltsev, Shavkat.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
NuMI Primary BooNE / NuMI S. Childress (FNAL) Primary Beams for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Craig Moore and Al Russell Includes.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
BNL neutrino beam. Optimization and simulations Milind Diwan June 10.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
120 GeV Targeting Overview Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Accelerator Physics and Technology Workshop.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
News and brief overview of Beamline plans for the next few months
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Target and Horn status report
Conventional Neutrino Beams Day 2
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Presentation transcript:

S.Kopp: NuFact ’02, Imperial College, London 1 The NuMI Neutrino Beam I. Status of 0.4MW Beam II. Potential for 1.6MW II. What’s it Good For? Sacha E. Kopp, University of Texas – Austin for the NuMI/MINOS Collaboration

S.Kopp: NuFact ’02, Imperial College, London 2 NuMI has 400kW primary proton beam 120 GeV 8.67  sec spill 1.9 sec rep rate MINOS (Fermilab to Minnesota) L = 730 km Beam Axis 3.32 o into the ground at FNAL, exits at Canadian border. 2 o off-axis in southern Canada or northern Wisconsin (L = 530 – 950 km) (12 km)

S.Kopp: NuFact ’02, Imperial College, London 3 NuMI Tunnel 105 m Soil Dolomite rock Decay volume 2m Ø, 675 m long (10 GeV  ) Near Detector on beam axis Also access passageway available for near off-axis detector Beamline passes through 3 acquifers

S.Kopp: NuFact ’02, Imperial College, London 4 NuMI Extracted Proton Beam Passes through acquifers »10 -4 losses throughout beamline (magnets activated to 200mrem/hr). »10 -6 losses in ‘transition’ soil-rock region (groundwater activation). Two major bends »150 mrad bend downward from Main Injector »100 mrad bend upward toward Soudan Want to be even more conservative in design »First operation of Main Injector in multi-batch mode »Emittance growth with intensity  h,  v ~ 25  mm-mrad measured in MI (design for 40  )  l, ~ eV-sec measured in MI (design for 1 eV-sec) (  p/p ~ 5  ) »Potential routes to improve proton intensity include batch ‘stacking’ Plan for 2-4  larger emittances.

S.Kopp: NuFact ’02, Imperial College, London 5 Improved Extraction Channel Added $0.5M in focusing in 40m drift region through soil-rock interface. Old DesignNew Design figures courtesy S.Childress

S.Kopp: NuFact ’02, Imperial College, London 6 Target Hall Beamline Component Positioning Modules Two Types of Magnetic Focusing Horns Pion Production Target (plus readout of target, vacuum pump) Baffle to protect horn from beam accidents Target Hall Radiation Shielding Radioactivated component work cell Alternate Horn Positions (eg: for off-axis exp’t)

S.Kopp: NuFact ’02, Imperial College, London 7 NuMI Target Hall Horn+Module in transit Stripline Concrete Cover “Carriage” - Module Support Beams Horn Shielding Module Horn Steel Shielding Air Cooling Passage Concrete Shielding Temporary Stackup of removed shielding Steel from module middle Concrete from over horn Beam passageway (chase) is 1.2 m wide x 1.3 high, forced-air-cooled Shielding protects groundwater below personnel above Air volume sealed, recirculated

S.Kopp: NuFact ’02, Imperial College, London 8 NuMI Production Target FNAL design team J.Hylen, K.Anderson FNAL beam test J.Morgan, H.Le, Alex Kulik, P. Lucas, G. Koizumi IHEP Protvino design team: V.Garkusha, V.Zarucheisky F.Novoskoltsev, S.Filippov, A.Ryabov, P.Galkin, V.Gres, V.Gurov, V.Lapygin, A.Shalunov, A.Abramov, N.Galyaev, A.Kharlamov, E.Lomakin, V.Zapolsky Target read-out Budal mode

S.Kopp: NuFact ’02, Imperial College, London 9 Prototype Target Test Teeth show no damage after 7x10 17 protons 3x10 5 pulses 2x10 18 protons/mm 2 (~ 1 NuMI week ) Max. stress pulses: 1x10 13 /pulse 0.2 mm RMS spot NuMI Design: 4x10 13 /pulse 0.9 mm spot, 23MPa stress (cf 100MPa limit) If go to 1.6MW beam, require spot size  2.0mm -Maintains target temperature -Maintains target stress -Long-term radiation damage?

S.Kopp: NuFact ’02, Imperial College, London 10 Target and Horn Modules Water tank Stripline Remote Stripline Clamp Baffle Target Target/Baffle Module Horn 1 Module Horn 1 25 cm wide, 2 m deep Steel endwalls with positioning, water, electric feedthroughs Motor drives for transverse and vertical motion of carrier relative to module Carrier Target moves 2.5 m along beam figure courtesy E.Villegas

S.Kopp: NuFact ’02, Imperial College, London 11 Stripline and Remote Connections Stripline shielding block stays with module Remote clamp allows horn disconnection from module (for horn replacement)

S.Kopp: NuFact ’02, Imperial College, London 12 Target/Horn Module Carriages Carriages: Cross-beams that modules rest on 130 o C 15 o C

S.Kopp: NuFact ’02, Imperial College, London 13 Horn 1 Prototype

S.Kopp: NuFact ’02, Imperial College, London 14 Design & Procurement Status Horn 2 Outer conductor: is currently being machined Inner conductor: Welding parameters being developed on test pieces Have done 1 st two welds on real horn Finish assembly horn 2 ~ end of year

S.Kopp: NuFact ’02, Imperial College, London 15 Horn Field Measurement Main horn field between conductors Field between conductors:  1/r as expected very symmetrical agrees within meas. error with current

S.Kopp: NuFact ’02, Imperial College, London 16 Horn Field Measurement in ‘field-free’ region through center of horn Error or fringe field in “field-free” region down center of horn is so small that no correction should need to be put into the Monte Carlo. Measurement with probe moving along horn axis 2% F/N criterion on flux in M.E. beam (approximately scaled to 0.85 ms test pulse from 2.6 ms operational pulse)

S.Kopp: NuFact ’02, Imperial College, London 17 NuMI Horn 1 Vibration Measurement on Horn Bell Endcap 6  m 55  m (ANSYS gives 71  m) 1.17 kHz (ANSYS 1.19 kHz) DATA Linear Model DATA Linear Model 2 sec0.03 sec NB: proton intensity upgrade is non-trivial if it requires faster rep-rate. figures courtesy J. Hylen

S.Kopp: NuFact ’02, Imperial College, London 18 TBM in Target Hall (May 2001) TBM - front TBM - back

S.Kopp: NuFact ’02, Imperial College, London 19 NuMI Decay Tunnel - July 2001

S.Kopp: NuFact ’02, Imperial College, London 20 Decay Pipe 2m Ø steel cans, 1 cm wall. Reinforced by 4” 20 ft. Decay volume evacuated to ~ Torr Helium-filling is a backup Complete decay pipe now in place, welded, inspected. Dual entrance window »Inner 1m Ø = 1.5mm Al »Outer 2m Ø = 1.0 cm Fe »Should readily handle increase in beam power (currently designed for beam accident)

S.Kopp: NuFact ’02, Imperial College, London 21 Sample Pipe / Shielding View concrete radiation shielding, density 2.1 g/cm 3 Decay pipe Decay region power deposition »63 kW in 1 cm thick steel decay pipe »52 kW in shielding concrete »Peak deposition in the steel is ~360 W/m »Drops to 20 W/m (at ~610 m) Heat removed by water-cooling »12 plastic-coated copper lines »Final temperature ~ 50 o C May be expensive to upgrade for  4 beam intensity. Target hall to absorber secondary access Relative centers vary along length

S.Kopp: NuFact ’02, Imperial College, London 22 Beam Absorber Egress path Absorber core »8 aluminum plates 30.5 x x cm 3 »dual water-cooling paths »8 kW peak power in one module (normal beam conditions) »followed by 10 plates of steel, each 23.2 cm thick. Total power into Absorber: 60 kW (400 kW beam power if accident) Water-cooled Aluminum easily can accommodate increased beam power from proton upgrad Steel is more problematic – require adding water cooling? Concret e blocks Absorber coreSteel blocks

S.Kopp: NuFact ’02, Imperial College, London 23 Summary of NuMI Upgradeability table courtesy N. Grossman

S.Kopp: NuFact ’02, Imperial College, London 24 Off-Axis case for Existing NuMI Plots assume current neutrino target, horns. Variable energy beam can help move peaks dynamically Antineutrino running takes factor 3 hit in rate NuMI ME Beam NuMI LE Beam figures courtesy M.Messier

S.Kopp: NuFact ’02, Imperial College, London 25 Instrinsic e in Off-axis Beam NuMI decay tube is quite long (675m) Good news: bckgd uncertainty lower in off-axis case. Back-fill last ~200m (water?) to reduce  decays for new exp’t? All e backgrounds From K decays figures courtesy M.Messier, R.Zwaska

S.Kopp: NuFact ’02, Imperial College, London 26 e Backgrounds Summary Plot assumes |U e3 | 2 =0.01,  m 2 =3.0  eV 2. NC is all interactions before any identification cuts. Detector design requires >10  reduction in NC events? For rest of discussion, assume NC reduced to level of beam e. figure courtesy M.Messier

S.Kopp: NuFact ’02, Imperial College, London 27 Comparison of Exp’ts Assume  m 2 = 3.0  eV 2, sin 2  13 =0.1, For NuMI, assume a 20kt detector, 85% fid.vol, analysis of low-Z calorimeter NuMI can make up for lower proton power, longer baseline because of higher neutrino, pion, cross sections. NuMI-MINOS, 2 8E20 POT NuMI Off-Axis, 4E20 POT/yr 712 km baseline JHF Phase I, 0.77MW 295 km baseline

S.Kopp: NuFact ’02, Imperial College, London 28 Interpretation of PhaseI Results Interpretation of   e observation Observation would be strengthened by antineutrino running.  Sign(  m 2 ) 

S.Kopp: NuFact ’02, Imperial College, London 29 Antineutrino Running Can we disentangle mass heirarchy and CP violation?

S.Kopp: NuFact ’02, Imperial College, London 30 Compare Baselines 950km 712 km 295 km sin 2  13 =0.02 sin 2  13 =0.05  m 2 >0  m 2 <0  m 2 >0  m 2 <0

S.Kopp: NuFact ’02, Imperial College, London 31 More Protons for NuMI Original baseline 4E13 protons/spill, 4E20/yr. Present performance of Booster is E12protons/batch (5 batches per MI extraction) Possible paths to improvement »Get all 6 Booster batches (post-collider) »Multi-filling of MI (‘stacking’) »Reduce MI acceleration time (requires new RF) Potential proton source upgrades -- $200M+ »16 GeV ‘proton driver’ »8 GeV proton LINAC (R&D for Linear Collider)

S.Kopp: NuFact ’02, Imperial College, London 32 Summary NuMI is substantial investment in US HEP program Design is flexible to permit variations, upgrades NuMI off-axis exp’t has complementary capabilities to JHF Real attack of CP violation requires substantial extensions to existing plans -- JHF-II and NuMI-II »4MW proton beam for JHF, 1.6MW for NuMI »HyperKamiokande, NuMI would have …? Lots more extensive documentation: »Letter of Intent to Build an Off-Axis Detector for NuMI, www-numi.fnal.gov/new_initiatives/new_initiatives.html »“The Proton Driver Design Study”, FERMILAB-TM-2136 » G.W.Foster, W. Chou, E. Malamud, FERMILAB-TM2169. »“Physics at FNAL with Stronger Proton Sources”, FERMILAB-FN-720