13 January 2003 - All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.

Slides:



Advertisements
Similar presentations
L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
December DZERO Operations Jerry Blazey Northern Illinois University.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
LKr status R. Fantechi.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice some efficiency this week –Accumulate statistics on new triggers & test new filter tools Offline studies on performance over shutdown –Special Runs for Tracking & Jet Trigger Studies –DAQ Rate test to establish next bottleneck to L1/L2 ~ 5/1kHz Power outage this morning & subsequent online system upgrades, cooling water shutdown, etc. prevents a full accounting of this week’s Physics numbers –Will revise later & link from D0 Operations web page

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University2 Delivered Luminosity Losses Most problems above added % additional losses due to run pauses, readout crate front-end busies, L2/L3 disables, SCL inits, etc. –L2 CAL solved by power cycling crate –L1 Muon LV PS will be repaired or replaced during shutdown –Tracking Triggers – procedural error ~0.5 hr: 30 Run transitions (~1 minute/per) ~1.0 hr: 9 Begin or End Store transitions (~5 minutes/per) ~1-2 hrs: Average 2-4% FEB during physics data taking –See next slide Major Sources of Downtime: Not recording during a store Other Losses

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University3 Other D0 News Muon Readout Crate Stability –New version of PDT code Tested during Store 2146 & made default with Store 2153 –We are now running at rates of: L1 ~ 1 kHz & L2 ~ 0.4 kHz –Running at ~90% for most runs in the last two stores Higher rates incur a greater amount of FEB ~4-5% Rec/Del Lumi = 96.7% Store 2153 ~3% FEB

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University4 L1/L2/L3 Rates Store 2155 – Sat Jan 11 th from 12:45 Instability Due to L2 CAL

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University5 Shutdown Schedule

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University6 Alignment Work Requests Did Rad Survey on Sun Jan 12 at 13:00 Survey crews arrived at 08:00 Mon Jan 13 & finished first work by lunch

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University7 Sub-Systems Part I Repairs, Upgrades, Maintenance Silicon –Fix ~5% of problematic channels –Replace some low reliability boards –Upgrades of firmware and software –Retrieval of TLD badges and installation of new ones Fiber Tracker & Pre-Shower –Warm up of cryostat –Move of some VLPC cassetes –Work on CTT electronics –FPS fiber bundles moves –Firmware upgrade Calorimeter –Modifications to 1500 BLS cards (reduction of trigger noises by factor of ~2) –Pre-amp fans replacements –Finishing L1CAL full rapidity coverage Inter Cryostat Detector –Radiation source test of North EC to check mapping & insure all tiles and cables are working –Replace ~10% of dead or marginal PMTs (from Run I) with new tubes (same model) –Swap out ~3% of faulty electronics

13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University8 Sub-Systems Part II Repairs, Upgrades, Maintenance Luminosity –Purge gas for PMTs (against He) Muon –Fix broken wires in MDTs –Replace failed PMTs/bases in trigger counters –Upgrades to PDT firmware and software L1 Muon –Repair power supplies –Fix to ~5% cables from CTT Forward Proton Detector –Repairs to pots in the tunnel –Connection of detectors to D0 AFEs and DAQ L2 –Upgrade (no lock step mode) Upgrades and repairs to the online cluster Lot of infrastructure work –New air filters –New power supplies –New pond water filters Progress report will be given next week…