MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.

Slides:



Advertisements
Similar presentations
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Safe Use and Operation of Vacuum Lines
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Diesel Generator Reliability: Lessons Learned from Storms
/0403 Copyright © 2004 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Metalworking Fluids.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Issues Dealing With Safe Handling of Mercury.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
NFPA 31 Standard for the installation of Oil- Burning Equipment
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Issues Dealing With Safe Handling of Mercury.
CERN High Power Target Hg Jet Experiment - nTOF11 Facility & Safety Meeting V.B. Graves P.T. Spampinato T.A. Gabriel CERN March 15-17, 2005.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
洗手及 负压技术 余 波
Hg System Decommissioning Activities
Overfill Prevention Technology and Maintenance
FUEL DELIVERY SYSTEM Copyright © MILE 2011 MILE / XUV500 / IC / VER 01 / JUL 2011.
NEW COMPLIANCE REGULATIONS
Presentation transcript:

MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion Center Oct 5, 2005

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 MERIT Collab. Mtg Oct 17-29, 2005 Outline  Facility constraints  System installation  Components in TT2A  System assembly & alignment  Hg handling & filling  Off-normal conditions  System removal and decommissioning  System disassembly  Hg drain  Prepare for shipment

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 MERIT Collab. Mtg Oct 17-29, 2005 Facility Constraints  No overhead lifting capability within tunnel  Modularity required  Component footprint size limitation is 1.3m x 4.4m  40cm step traversal required to enter TT2A

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 MERIT Collab. Mtg Oct 17-29, 2005 Components into TT2A  Mobile crane used to lower equipment from ground level to pit floor  Hilman rollers or on-board casters allow component transport  CERN "turtle" available as needed  Prefer to use cable ratchet to control travel down slope

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 MERIT Collab. Mtg Oct 17-29, 2005 Installation Sequence Part 1 (Out-of- beam) Transport Hg SystemRemove RollersTransport Baseplate, Install Magnet Remove Rollers, Level MagnetRoll Hg System into MagnetAdd Rollers

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 MERIT Collab. Mtg Oct 17-29, 2005 Installation Sequence Part 2 (In- beam)  Baseplate & magnet will go in beam line prior to Hg system  Blocks under magnet end to provide adequate tilt Roll System into Beam LineRemove RollersElevate & Tilt

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 MERIT Collab. Mtg Oct 17-29, 2005 Alignment to Beam  Fiducials assumed to be on magnet baseplate and Hg system secondary containment sleeve  Gross alignment with Hilman rollers  Fine alignment with baseplate alignment mechanisms for magnet & Hg cart  Precision alignment using CERN beam locators  May still require fine tuning after first few beam pulses  May need secondary/magnet interface bracket to prevent nozzle movement

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 MERIT Collab. Mtg Oct 17-29, 2005 Hg Handling Issues Properties, Safety Limits, Standards  Atomic Weight:  Boiling Point: 357 degree C  Specific Gravity: 13.6  Vapor Pressure: mm Hg  Vapors: colorless, odorless  Solubility: insoluble in water  NIOSH/OSHA limits: 0.05 mg/m 3, 10 h/day; 40 h/wk  ORNL: mg/m 3, respirators at mg/m 3

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 MERIT Collab. Mtg Oct 17-29, 2005 The Target Test Facility (TTF) - Basis For ORNL’s Hg Handling Experience  Full scale, prototype of SNS Hg flow loop  1400 liters of Hg  Used to determine flow characteristics  Develop hands on operating experience  Assess key remote handling design issues

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 MERIT Collab. Mtg Oct 17-29, 2005 TTF Pump Room and Target Room  75 Hp centrifugal pump  Nominal flow at 1450 liters/min (380 gpm)  Completed several major equipment upgrades for piping and target configuration

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 MERIT Collab. Mtg Oct 17-29, 2005 TTF Hg Loading  TTF vacuum pump was used to transfer Hg directly into the storage tank from 540+ flasks - Peristaltic pump available as backup

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 MERIT Collab. Mtg Oct 17-29, 2005 Proper PPE Is Mandatory  Overalls, gloves, and overshoes are the minimum requirement for TTF loop maintenance

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 13 MERIT Collab. Mtg Oct 17-29, 2005 Operational Issues  Is special notification required at MIT for Hg operations for integrated systems testing  The schedule shows a safety review and target test plan to be presented to MIT staff in Feb  Will CERN provide the third vapor monitor for sampling the tunnel environment?  Who is responsible for monitoring the tunnel?  Will MIT and CERN provide support for repackaging the target equipment and Hg for delivery back to ORNL?

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 14 MERIT Collab. Mtg Oct 17-29, 2005 Hg Loading  A glove box could be required for unloading Hg at the completion of testing if refilling flasks is not permitted outside of the secondary containment  Consider use of snorkel near flasks in lieu of glove box

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 15 MERIT Collab. Mtg Oct 17-29, 2005 Hg Loading Operation  Secondary containment cover remains installed  Pump into sump tank  Air displaced from sump tank vented through secondary passive filtration  Hg vapor control with snorkel  Glovebox used if required Inlet port

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 MERIT Collab. Mtg Oct 17-29, 2005 Filter Replacement  Effectively requires breaching the secondary containment  Filter pack will be covered by a plastic bag taped in place  Snorkel will be placed adjacent to the filter  Monitor # 3 will be used to sample air in the filter region

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 17 MERIT Collab. Mtg Oct 17-29, 2005 Estimate For Filter Lifetime Saturation Concentration  Flow Rate 110 cfm  Temp C  Filter Effic. 99.0% Saturation Pressure Ref. Quechsilber und seine Gefahren, Swiss government worker safety report, SBA No. 145, Luzern  Filter Weight 6 lbs  Filter Satur. 12%  Filter Life 185 hrs  Does not incl. reduction for humidity

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 18 MERIT Collab. Mtg Oct 17-29, 2005 Selected Off-Normal Events and Recovery 1.Small spill (1 ml) or vapor leak into the secondary containment verified by vapor monitors # 1 and # 2  Continue to operate to the expected limit of the filter lifetime based on the measured vapor concentration- analysis  Monitor for changes to vapor readings in the secondary enclosure  Monitor air in the tunnel for indications of vapor  if none, continue testing  We need to address credible off-normal occurrences and recovery Note: If only one monitor registers vapors – could be a false-positive; continue to operate if #3 reads < mg/m 3

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 19 MERIT Collab. Mtg Oct 17-29, 2005 Off-Normal Events (cont.) 2.Medium spill (100 ml) into secondary containment verified by vapor monitors # 1 and # 2  Continue to operate to the expected limit of the filter lifetime based on measured vapor concentration-analysis  Monitor for any changes to vapor readings in the secondary enclosure  Monitor air in the tunnel for indications of vapor; if none, continue testing  If approaching limit of filter life consider connecting the snorkel to extend the time of operation, if that allows completion of the test program. (Note: Connecting the snorkel may require a waiting period of one or more days for a safe activation level; therefore the snorkel may be already connected but not turned on.)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 20 MERIT Collab. Mtg Oct 17-29, 2005 Off-Normal Events (cont.) 3.Full inventory spill into the secondary containment Monitor target instruments for clues to the source of leakage –Verify by checking sump tank level sensor, conductivity sensor, and nozzle pressure sensor Cease operations, wait for cool down to visually inspect Monitor air in the tunnel for indications of vapor Seal inlet and outlet vents on secondary enclosure Wait for additional cool down to permit hands on recovery and storage of Hg.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 21 MERIT Collab. Mtg Oct 17-29, 2005 Off-Normal Events (cont.) 4.Vapors detected outside of secondary containment by monitor # 3 - assume the secondary containment is breached or that the filter is saturated  Confirm with readings from #1 and #2 vapor monitors  If confirmed … cease operations  If not confirmed … continue operations  Monitor target instruments for clues to the source of leakage  verify by checking sump tank level sensor, conductivity sensor, and nozzle pressure sensor  Wait for cool down, visually inspect and sample local air  If levels are above safe limit (0.025 mg/m 3 ??), inspect with full face mask-Hg respirator cartridges  Repair breach in enclosure if possible, pressure check, continue test operations OSHA limit mg/m 3 ORNL limit mg/m 3 TTF limit mg/m 3 CERN limit ?? mg/m 3

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 22 MERIT Collab. Mtg Oct 17-29, 2005 Miscellaneous Equipment For The Target System Large Items Small Items Vacuum Cleaner– Dry Merc-X Cleaning Solution Snorkel Sponges 2 Vapor Monitors Plastic Buckets Spare Filters (qty. TBD) Plastic Pans Glove Box Gauze– roll VacuumPump ? Small Tools Vinyl Tape Herculite Plastic Bags– asst’d (1 gal.– 20 gal.) 1-liter plastic bottles Lab Coats Tyvek Hooded Suits Nitrile Gloves Full Face Mask/Respirator Cartridges

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 23 MERIT Collab. Mtg Oct 17-29, 2005 Post-Experiment Operations  The target equipment (and the solenoid) will have neutron-induced activation  Based on (H. Kirk 9/01/04)  200 pulses  16 x protons/pulse (avg.)  30 days of operation  Contact dose rate on the iron exterior will be:  after 1 hr 40 mrad/hr  after 1 day 21 mrad/hr  after 1 week 13 mrad/hr  after 1 mo. 5 mrad/hr  after 1 year 1 mrad/hr  Sergei Striganov (FNAL) performing separate analysis  Move experiment out of beam line several days after conclusion, minimizing operator time near equipment

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 24 MERIT Collab. Mtg Oct 17-29, 2005 Hg Draining  Extract Hg & prepare for shipment after several month cool-down  CERN requirement that secondary containment not be opened during draining  Will be trapped Hg in extraction tube, flex hoses, Hg cylinder, plenum

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 25 MERIT Collab. Mtg Oct 17-29, 2005 Disassembly Operations  ORNL will take back the Hg target system and the activated Hg and components  Is hydraulic system and fluid activated, or can we adequately shield?  Hopefully other uses for system will emerge