Eastern Wind Integration and Transmission Study

Slides:



Advertisements
Similar presentations
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Advertisements

Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
Queue Reform at the Midwest ISO NARUC February, 2008.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Greenhouse Gas Emissions Reductions from Wind Energy : Location, Location, Location? Duncan Callaway SNRE & Department of Mechanical Engineering
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Eastern Wind Integration and Transmission Study Overview January 28 th Webinar Dave Corbus National Wind Technology Center National Renewable Energy Lab.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
The Transmission Imperative November 3, 2011 Jay Caspary.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Integrating Renewables Gloria Godson Energy Bar Association December 3,
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
CCU Department of Electrical Engineering National Chung Cheng University, Taiwan Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Transmission and Wind Integration June 7, 2010 Michael Goggin American Wind Energy Association.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Updated 1/28/2011.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
FERC Staff’s Report on Demand Response and Advanced Metering.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Debra Lew, NREL (speaking for a large team at GE, 3TIER and NREL) UWIG Western Wind and Solar Integration Study Update.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
The following slides provide information about integrating wind energy into the electricity grid. Photo by Dennis Schroeder, NREL 25907NREL
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Minnesota Renewable Energy Integration and Transmission
RENEWABLES AND RELIABILITY
Contents Introduction Focus area Wind scenarios
Western Wind and Solar Integration Study Phase 1
Mid-Continent Area Power Pool
Renewable energy builds a more reliable and resilient electricity mix
RE Grid Integration Study with India
Gordon van Welie, President & Chief Executive Officer
Solar Energy Commercialization
Presentation transcript:

Eastern Wind Integration and Transmission Study Presentation to FERC Dave Corbus National Renewable Energy Lab

What is Needed to Integrate 20% Wind in the Eastern Interconnect? Evaluate the power system operating impacts and transmission associated with increasing wind capacity to 20% and 30% Impacts include operating due to variability and uncertainty of wind; reliability Build upon prior wind integration studies and related technical work; Coordinate with current regional power system study work; Produce meaningful, broadly supported results Technical Review Committee 2

EWITS Study Organization DOE Sponsor NREL Project Manager Technical Review Committee AWS Truewind Wind Modeling Project Team – Analysis EnerNex/MISO/Ventyx TRC – bimonthly calls for technical guidance and decisionmaking Subcontractors – conducting analysis, modeling, weekly calls Stakeholders – periodicmeetings for input/feedback and explanation of results, making sure this is relevant and useful Stakeholders 3

Technical Review Committee Includes representation from the following organizations New York Independent System Operator (NYISO) Xcel Energy Southern Company PJM Interconnection Southwest Power Pool(SPP) U.S. Department of Energy Midwest ISO (MISO) Michigan Public Service Commission Area Power Pool (MAPP) American Wind Energy Association (AWEA) Federal Energy Regulatory Commission (FERC) – observer status North American Electric Reliability Corporation (NERC) CapX 2020 (Great River Energy) Windlogics National Renewable Energy Lab General Electric (GE) Regulatory Assistance Project University College Dublin Organization of MISO States (Wisconsin Public Service Commission)

The Technical Work Conducted in EWITS Yielded Detailed Quantitative Information on Wind generation required to produce 20% of the projected electric energy demand over the U.S. portion of the Eastern Interconnection in 2024 Transmission concepts for delivering energy economically for each scenario Economic sensitivity simulations of the hourly operation of the power system defined by a wind generation forecast scenario and the associated transmission overlay The contribution made by wind generation to resource adequacy and planning capacity margin

EWITS – Not an End All Catch All but a Link in the Chain The scenarios developed for this study do not in any way constitute a plan; instead, they should be seen as an initial perspective on a top-down, high-level view of four different 2024 futures. The study assumptions were developed in close coordination with the TRC Changes in the assumptions, such as the cost of various fuels, the impact of regulation and policy would have a major influence A complete evaluation of any of the scenarios would require additional technical analysis including An AC analysis which examines in more detail the power transfer limitations assumed in the production modeling and includes power flows that look at voltage and reactive compensation issues, dynamic and transient stability, and HVDC terminal control.

Key Tasks- Eastern Wind Integration & Transmission Study Mesoscale modeling and Siting Develop high quality wind resource data sets for the wind integration study area Develop wind power plant outputs Identify wind sites and develop siting scenarios Transmission Study – Develop transmission concepts for different wind scenarios Integration Study Evaluate Operating Impacts Evaluate Reliability Impacts Compare Scenario Costs

Wind Plant Modeling Approach: “Re-creating” the Weather Use meteorological modeling to simulate weather for historical years e.g. MM5 model used for weather forecasting “zoom in” for both space and time (e.g. 5 min, 2 mi x 2 mi) Use actual weather to guide simulation, nudge back to reality Save important weather variables at points of interest Wind speed and direction @ hub height Temperature Pressure Convert time series of wind speed data to generation using turbine power curves

Scenario Development and Siting Four Different Scenarios Plus Reference Case Three 20% and one 30% wind scenarios Local resources with lower capacity factor onshore wind and offshore High capacity factor wind development in the Midwest with larger transmission component All of four scenarios require a lot of wind and transmission! Scenario 3 Wind Plant Siting

20% and 30% Wind Scenarios

EWITS Technical Review Committee Webinar Methods & Assumptions 2024 wind scenario development Power system models for 2024 MISO Runs production cost model Developing Transmission Overlays Build off some JCSP assumptions but includes different scenarios Evaluating operating impacts Evaluating reliability impacts EWITS Technical Review Committee Webinar October 2, 2009

EWITS Methodology

Transmission Requirements High levels of new transmission are needed across the 4 scenarios Some transmission elements are common to all overlays Reference case, 20% and 30% wind scenarios all require a significant transmission build out, otherwise they are not feasible Transmission reduces variability and provides capacity benefits in its own right, and enhances the reliability contribution of wind generation by a measureable and significant amount. The EHV DC transmission that constitutes a major portion of the overlays has additional benefits The conceptual transmission overlays consist of multiple 800kV HVDC and EHV AC lines EWITS Technical Review Committee Webinar October 2, 2009

Transmission Overlay for Scenario 3

Conceptual Transmission Overlays

The Power of Aggregation

Geographic Diversity – 10-Minute Variability for Five Regions

Additional Reserve Requirements by Region and Scenario

Wind Integration Costs

Wind Curtailment by Scenario

Total Scenario Costs

Carbon Price Sensitivity

Cost Breakdown for Scenarios

Generation for Carbon Scenario

and the conclusion is… There are no fundamental technical barriers to the integration of 20% wind energy into the electrical system, but… There needs to be a continuing evolution of transmission planning and system operation policy and market development for this to be achieved.

EWITS Conclusions High penetrations of wind generation—providing 20% to 30% of the electric energy requirements of Eastern Interconnection—are technically feasible with significant expansion of the transmission infrastructure. New transmission will be required for all the future wind scenarios in the Eastern Interconnection, including the reference case. Planning for this transmission, then, is imperative because it takes longer to build new transmission capacity than it does to build new wind plants. Without transmission enhancements, substantial curtailment of wind generation would be required for all of the 20% scenarios. Interconnection-wide costs for integrating large amounts of wind generation are manageable with large regional operating pools, where benefits of load and wind diversity can be exploited and large numbers of supply resources are efficiently committed and dispatched. 

EWITS Conclusions Transmission helps reduce the impacts of the variability of the wind, which reduces wind integration costs, increases reliability of the electrical grid, and helps make more efficient use of the available generation resources.  Although costs for aggressive expansions of the existing grid are significant, they do make up a relatively small piece of the total annualized costs in any of the scenarios studied.  Wind generation displaces carbon-based fuels, directly reducing carbon dioxide (CO2) emissions.  Emissions continue to decline as more wind is added to the supply picture. Increasing the cost of carbon in the analysis results in higher total production costs.

The results of this study pose some interesting policy and technology development questions Could the levels of transmission, including the Reference Case, ever be permitted and built, and if so, what is a realistic time frame? Could the level of offshore wind energy infrastructure be ramped up fast enough to meet the aggressive offshore wind assumption in the EWITS scenarios? Would a different renewable profile or transmission overlay arise from a bottom-up planning process? How can states and the federal government best work together on regional transmission expansion and the massive development of onshore and offshore wind infrastructure? What is the best way for regional entities to collaborate to make sure wind is integrated into the bulk electrical grid optimally and reliably ? What is the difference between applying a carbon price versus mandating and giving incentives for additional wind?  

EWITS Schedule & Contacts Report going to print next week EWITS roll out January 20th , 10 AM, Washington DC. You are all invited! Development of Phase II of EWITS in first quarter 2010 Contact: Dave Corbus at David.Corbus@nrel.gov

An Energy Resource in an Capacity World LOLE/ELCC results for high penetration scenarios, with and without transmission overlays