Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Electrical Infrastructure Design Considerations David Flood Head of Electrical Systems, Forewind Stakeholder Workshops, April 2010.
Study Committee Representatives Annual Report December, 2012
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
OFFSHORE RENEWABLE PLANT HVDC POWER COLLECTOR AND DISTRIBUTOR
Ilinca Julian, Heikki Ojanen, Juha - Matti Lukkari.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
SLIM® and Bio-SLIM® The “Life starts at 36”-project:
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
The Integration of Renewable Energy onto the Existing Grid Dr Norman MacLeod Technical Director, HVDC.
Some electrical connection design issues for offshore wind farms Paul Gardner, Helen Snodin, & Nigel Scott Garrad Hassan and Partners
Why does OTEG need a charging subgroup? OTEG Open Meeting 3 July 2006.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
System Strength Discussion
Protection notice / Copyright noticeFor presentation in EWEC 2010 HVDC Solution for Offshore Wind Park Comprising Turbines Equipped with Full-Range Converters.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Power Systems Consulting and Software 4 March 2004 BWEA Conference: UK Offshore Wind 2004 Integration of Offshore Wind Farms into the Local Distribution.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
First Phase of the European Supergrid InnoQube Conference London, 20 January 2011 Ana Aguado – CEO, Friends of the Supergrid.
6/10/2003 – e.heineVLVnT facility-power1 EFNI H K Introduction Hypothesis Topology, technical constrains Redundancy, budget constrains Grounding Reliability.
授課教師 : 吳元康 老師 學生 : 詹博雄 HVDC Connection of Offshore Wind Farms to the Transmission System.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
The Centre For S USTAINABLE E LECTRICITY & D ISTRIBUTED G ENERATION Creation of SEDG The Centre for Sustainable Electricity and Distributed Generation,
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Cost trends for Offshore Wind - and a look at the resources David Milborrow
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
1 Critical Mission Support Through Energy Security Susan Van Scoyoc Concurrent Technologies Corporation 16 August 2012 Energy Huntsville Meeting Huntsville,
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
 Transmitting power at high voltage and in DC form instead of AC is a new technology proven to be economic and simple in operation which is HVDC transmission.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Renewables and System Services Ann Scully.
Initial view on changes to Codes OTEG, 3 rd July 2006.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Local asset charging arrangements DCMF April 2008.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
RECENT TRENDS IN POWER SYSTEMS
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CAP169 BSSG 12/03/09. 2 Today  Recap on developments to date  Discuss and agree Terms of Reference for the group  Begin to work through proposal, capturing:
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
DRAFT Slides for Discussion - Standards, Reports and Recommendations
Planning and Realisation of Wind Farms
GC0096 Electricity Storage Grid Code Requirements
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
GC0104 – Demand Connection Code (DCC)
Contents Introduction Focus area Wind scenarios
Agenda TSOG 8th November
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
GSR022: Review of Security and Economy Required Transfer Conditions
IG BASED WINDFARMS USING STATCOM
CLIC Civil Engineering & Infrastructure Working Group Meeting
Electricity Distribution Network Design Training & Courses
G5/4 Sub-group Update.
Grid integration and stability of 600MW windfarm at Kriegers Flak
HVDC Transmission Systems:
Evaluation of wind farm layouts
National Institute of Wind Energy(NIWE)
Presentation transcript:

Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP

Content Review of likely boundary between Offshore Generator and Offshore TO Cost benefit analysis Work plan Data availability and transparency Other issues

Offshore Ownership Boundary Reason for review –Need to understand the scope of the offshore transmission system to understand the required scope of the offshore security standards This assessment has taken into account 4 options Each option has been compared to existing onshore arrangements, and existing CUSC, STC and charging methodology definitions. More detailed paper to be made available for wider consultation.

Option 1; TO to own up to the transmission voltage busbar clamps on the platform transformer circuit Offshore transmission system 132kV assets Option 4; TO to own up to the individual wind turbine generator transformer. Windfarm electrical system 33kV assets Option 2; TO to own up to the transformer LV disconnectors Option 3; TO to own up to the disconnector on the busbar side of the circuit breaker on the incoming windfarm circuit Windfarm electrical system Single offshore platform Options considered

Initial Thoughts Option 3 is recommended as it: –Best facilitates competition in generation –Simplifies ownership of offshore platforms –Allows the offshore TO to provide Users with a consistent level of security Option 1 could be considered but provides less benefits than Option 3 if more than one Offshore Generator is connected Options 2 and 4 are not recommended

Initial Thoughts Sub-group intends to develop a detailed paper explaining the recommendation Sub-group has assumed that the default offshore ownership boundary will be as its recommendation (Option 3) Main Impacts: –Transformer circuits will be included within the security standards for offshore transmission –Assumption will require a review of the consequential impact on Grid Code, access rights and charging methodology

Cost-Benefit Analysis Concept Scope Example configurations Work progress and key results Proposed format of SQSS for offshore transmission

Concept of cost -b enefit analysis Network Capacity and Redundancy Cost Investment &Maintenance Costs Cost of curtailed wind energy and losses Total Cost Optimal network

Scope of cost-benefit analysis Offshore networks –Switchgear reliability, installation cost, platform cost, ratings, maintenance requirements –Cable reliability, installation cost, maintenance requirements, ratings, electrical parameters Transmission mode (AC vs DC) –Compensation requirements –Losses Windfarms –Wind resource characteristics –Typical turbine ratings, availability, cost –Windfarm size –Windfarm distances from shore Future value of energy and ROCs Impact on onshore system operation –Additional reserve costs

Examples of single AC connections 132 kV 33 kV Onshore network 132 kV 220kV 33 kV 220 kV Onshore network Windfarm electrical system Shoreline

Example of a shared AC connections 132 kV 33 kV 400 kV 132 kV Onshore transmission network 400 kV 132 kV 33 kV 132 kV 33 kV

132 kV 33 kV 400 kV 132 kV On-shore transmission network 400 kV 132 kV 33 kV 132 kV 33 kV AC DC DC AC 275 or 400 kV Example of a shared DC connection

Progress and key results Methodology for the evaluation of cost and reliability performance of alternative offshore transmission configurations has been developed Key differences between offshore and onshore networks –Significantly higher capex requirements –Technology constraints –Wind generation operates at lower load factors than conventional plant Analysis of a range of connection types suggests that generally lower levels of redundancy can be justified for offshore transmission networks when compared with onshore transmission networks –Justifiable levels of redundancy will be influenced by the size of the wind farm and its distance from shore –Initial analysis suggests significant benefits in providing flexibility at the platform and interconnections between offshore platforms in close proximity

Illustrative results Numerical values shown are indicative ONLY. Studies are NOT complete and key assumptions and electrical, reliability and cost data need validation. Comprehensive sensitivity studies are yet to be carried out Wind farm size (MW) Distance to shore (km) One circuit Two circuits Three circuits

Numerical values are indicative ONLY Proposed Table form of SQSS for Offshore Networks/1 Distance from Shore: 10 km Wind Farm Capacity Network Capability to be Restored Range of Power Available Network Capacity Following First Circuit Outage Available Network Capacity Following Second Circuit Outage Up to 150MW 0NIL Between 150MW and 300MW X1NIL Between 300MW and 450MW Y1Z1 Above 450MWU1V1

Numerical values are indicative ONLY Proposed Table form of SQSS for Offshore Networks/2 Distance from Shore 50kM Wind Farm Capacity Network Capability to be Restored Range of Power Available Network Capacity Following First Circuit Outage Available Network Capacity Following Second Circuit Outage Up to 300MW 0NIL Between 300MW and 450MW X1NIL Between 450MW and 800MW Y1Z1 Above 800MWU1V1

Work plan

Work plan and key dates Further develop the cost-benefit evaluation models (by 14 August) –Take account of the impact of losses –Quantify the impact of diversity in the windfarm output –Take account of the impact of reactive power effects –Develop models further and carry out sensitivity analysis Carry out cost-benefit studies and propose Draft Tables and Processes for forming SQSS for offshore transmission networks for review by the sub-group (by 24 August) Submit draft SQSS Generation Connection Criteria for offshore transmission networks to OTEG for consideration (31 August) Carry out detailed sensitivity analysis. Re-assess and refine draft SQSS Generation Connection Criteria for offshore transmission networks (30 September) Proposed workplan discussed at subgroup meeting on 28/07/06

Data Availability and Transparency

Data availability The study work is conditional on receipt of all data from suppliers and developers The sub-group has defined the data requirements and highlighted the data that has not yet been provided There is risk that the timescales in the work plan will not be met if this data required is not provided –The current work plan is contingent on all data being provided by 14 th August.

Transparency of data All results of the cost-benefits evaluations should be re-producible All data used in the analysis should be visible Some of the cost information and wind data is only being provided to the DTI Centre for Distributed Generation and Sustainable Electrical Energy (under confidentiality agreements). –It is hoped that suitable anonymous, generic, representative data can be produced from project specific data Concern is that the sub-group may not be able to make a recommendation based on the results of the analysis work if the input data was not available to them.

Other Issues

Other issues Offshore TO/DNO/GBSO Interface –Sub-group is concerned by the possible implications on the security of an offshore transmission network connected to the onshore transmission network via a distribution network. –Particular concern relates to differences between the design standards applicable to transmission and distribution networks. –Sub-group will investigate and provide feedback to OTEG HVDC –Sub-group is considering DC connection options as part of the cost benefit analysis work Paralleling main onshore GB transmission network through offshore transmission network –The subgroup is un-aware of any proposed windfarm connection that will parallel any nodes of the GB transmission system. Islands –National Grid currently developing Commercial Charging arrangements for Islands connections. Sub group work to concentrate on establishing optimum offshore network technical solution with any commercial arrangements to follow.