Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.

Slides:



Advertisements
Similar presentations
Chapter 6 Practical Methods to Reveal CPM Covert Activities
Advertisements

LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 4 Standard CPM Smoke and Mirror Tricks (Manipulations)
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CP Chapter 4 Schedule Planning.
Management & Development of Complex Projects Course Code - 706
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Systems Analysis and Design 8 th Edition Chapter 3 Managing Systems Projects.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Project Time Management
Systems Analysis and Design 8th Edition
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
University of Delaware Department of Civil and Environmental Engineering CIEG Construction Planning & Scheduling Bob Muir, PE.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
Reviewing & Analyzing Schedule
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Project Plan Development
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Development and Quality Plans
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 5 Advanced Techniques of CPM Deception and Mystery.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Pre-Project Components
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Schedules The Cabinets New Categories of Scheduling.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Measurement and Payment
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
WEEK 3 Project Planning.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Estimating Project Costs
TOPIC-8A- PROJECT TIME CONTROL
(Additional materials)
Chapter # 4 Development and Quality Plans
Importance of Project Schedules
CAD DESK PRIMAVERA PRESENTATION.
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule The owner and its construction representatives need to determine a realistic contract performance period. –Too little time increases initial pricing and will result in contractor requests for time due to even minor changes. –Too much time (and if the contract disallows an early completion) initial pricing will be greater than necessary due to extended contractor overhead cost. The owner incurs time related costs as delivery of the project is prolonged: –added administrative costs –lost project use costs –lost production cost, facility rent and / or duplicate space costs.

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule Forecast completion and key project milestone Document actual progress Establish reasonable payment Predict manpower needs Determine the impact of changes The project schedule affects the management effort of the project from the day it is accepted until substantial completion. If properly prepared, the schedule can:

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule Incorrectly forecast completion Support overpayment Incorrectly indicate that the owner’s actions will impact job progress Incorrectly indicate that the contractor and/or subcontractor will impact job progress If improperly prepared, the schedule can:

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule Define the individual tasks that make up the project. Define how the tasks are related to each other. The construction schedule should present a detailed understanding of any contract specified phasing and/or sequences of work. Activity identification and associated quantities of work by phase or task sequence should be accurately determined.

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule Activity duration should be developed based on quantities of work it represents with an attainable production. –Considering estimate detail, crew make-up and anticipated man-hours and/or equipment hours per installed unit, the bid estimate represents a good measure of likely performance unique to the contractor. Activity logic and duration should include any unique requirements defined by the contract drawings and specification.

Copyright © 2009 T.L. Martin & Associates Inc.Activities Defines the scope of work –Drawings –Estimates –Specifications Should be based on work quantity Separate work performed by multiple subcontractors into separate activities Owner and contractor / subcontractor should agree to activity scope and allocated work quantities Description - 48 characters (P3) Description - should contain some type of operating verb to avoid confusion

Copyright © 2009 T.L. Martin & Associates Inc. Planning Unit (Original Duration) PLANNING UNIT: The increment of time used to schedule a project - hours, days, weeks, or months Work starts in the morning of the (day) and finishes in the afternoon (P3) Duration of zero, work starts in the morning but completes in the afternoon of the previous period (P3) Multiple shifts cannot be defined in a work day calendar Use hours as the planning for multiple shift operations Maximum suggested duration for work tasks is 30 calendar days (20 work days)

Copyright © 2009 T.L. Martin & Associates Inc. Activity Identifications (“ID”) Alphanumeric values to define activities (individual work scopes) Should relate to areas and/or phases of the project Assign values for “continuous flow from left to right” Predecessor should always be lower than successor Leave a gap in sequence Should not change Required for “apples to apples” comparisons Some scheduling software change IDs and/or line numbers

Copyright © 2009 T.L. Martin & Associates Inc. Type of Activity Work Tasks Hammock Activities or Summary Bars Milestones Flags

Copyright © 2009 T.L. Martin & Associates Inc. Activity Codes Definition - Assigned to an activity to organize them into manageable groups for: Updating Reporting Analyzing Summarizing

Copyright © 2009 T.L. Martin & Associates Inc. Activity Codes Areas of the Project Phases Work Descriptions - Type of Work Responsibility Specification Section (CSI) Contract Type Blank - User defined as needed

Copyright © 2009 T.L. Martin & Associates Inc. Calendars Define work periods when activities can start and stop Global calendars - applied to all subsequent (base) calendars Project Start sets 1st day of the project in planning units Global calendar typically should be left as a seven day work week with no holidays Base calendar (31 possible in P3) - typical should be five day work week with holiday Specifications should define calendar and holidays

Copyright © 2009 T.L. Martin & Associates Inc. Calendars Other non-work periods: Winter shut down period Environmental shut down period Anticipated lost weather days (sometimes defined in specification)

Copyright © 2009 T.L. Martin & Associates Inc. Logical Relationships Relationships logically connect activities Should represent the contractors proposed sequence of construction Either predecessor or successor relationships Only one activity that has no predecessor – award / notice to proceed (“NTP”) Only one activity that has no successor - completion Four main relationship types: –Finish to Start –Start to Start –Finish to Finish –Start to Finish

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule The CPM should be developed following standard guidelines for useful schedules. –The schedule should depict how the project team intends to build the job. –The schedule contains one start and one ending activity. Only one activity in the schedule does not have a predecessor and only one activity does not have a successor. –The schedule should address all contract requirements. –The use of software constraints to activity timing is minimal to none. –The use of relationship leads and lags between activities is held to a minimum to none. –Activities are coded to allow easy report selection.

Copyright © 2009 T.L. Martin & Associates Inc. A realistic CPM schedule Allow adequate time for development review and approval Include and/or follow a comprehensive scheduling specifications in contract requirements Owners should not issue NTP until an accepted schedule is in place Owner should prepare an accurate independent resource and cost estimate for the project. Responsibility for preparing the schedule must include contractors field superintendent, subcontractors and Owner representatives. How to Assure a Quality Schedule

Copyright © 2009 T.L. Martin & Associates Inc. Please continue to Chapter 4 Standard CPM Smoke and Mirror Tricks (Manipulations)