IRSC 2009 Båstad Learning from failure: Research initiatives towards improving safety and reliability of the Swedish railway system Alexander Wilhelmsson.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
The organisations within The Swedish Doubling Project
Campus Improvement Plans
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Division Of Early Warning And Assessment MODULE 4: MANAGING THE ASSESSMENT AND REPORTING PROCESS.
Progress Toward Impact Overall Performance Study of the GEF Aaron Zazueta GEF Evaluation Office Hanoi, March 10, 2010.
The Swedish National audit Office – IT investments across the borders Presentation at the 6th Performance Auditing of the use of IT Seminar in Beijing,
Project Stages. Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion.
4/30/20151 Quality Assurance Overview. 4/30/20152 Quality Assurance System Overview FY 04/05- new Quality Assurance tools implemented, taking into consideration.
In Europe, When you ask the VET stakeholders : What does Quality Assurance mean for VET system? You can get the following answer: Quality is not an absolute.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
Awareness – a foundation for investigating inter- organizational collaboration in cadastral system?
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Objectives When developing products, product developers have a large influence on a product’s life cycle, e.g. on how the product is produced and which.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
 Increasing concerns about the nursing profession in the U.K.  Concern from NMC over the number of new registrants reported for fitness for practice.
Sub-regional Workshop for the Gulf Countries to Launch the Education for All National Assessments Sharjah, June, 2013 National EFA 2015 Review Technical.
Key changes and transition process
Shared Decision Making: Moving Forward Together
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
Needs Analysis Session Scottish Community Development Centre November 2007.
Incident Management Taking Task 05 Forward David Stones, Stockholm 12/
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
Office of Inspector General (OIG) 2015 Florida Annual Assessment and FSAA Meeting.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Assessment on the implementation of the Mediterranean Strategy for Sustainable Development Dr Nicola Cantore Overseas Development Institute,
When Partnering Fails… Gayle Waldron President, The Management Edge.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Inventory Planning in Norway UNFCCC Workshop on National Systems Audun Rosland 11 – 12 April 2005.
 Introduction Introduction  Contents of the report Contents of the report  Assessment : Objectives OutcomesObjectivesOutcomes  The data :
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
IASC Needs Assessment Task Force IASC Needs Assessment Task Force NATF Training on Coordinated Assessments Revinge, Sweden October 28, 2010.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Regional Policy Ex post Evaluation of the Cohesion Fund and ISPA in period Adam Abdulwahab Evaluation Unit DG Regional Policy Evalaution network.
“Analytical Tools and Data Collection” April 2009 EuropeAid/125317/D/SER/TR Session 1 Introduction to Role of Impacts Assessment in RIAs.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
SEA in the Czech Republic Prague, 24 September 2008.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Human Reliability HUMAN RELIABILITY HUMAN ERROR
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
Helping Teachers Help All Students: The Imperative for High-Quality Professional Development Report of the Maryland Teacher Professional Development Advisory.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
BSR Risk Management Capability Assessment Methodology
The most represented stakeholders within the NAPA process were governments, followed by research institutions, UN Agencies and local communities. Private.
IRSC 2009 Båstad Learning from failure: Research initiatives towards improving safety and reliability of the Swedish railway system Alexander Wilhelmsson.
Planning a Learning Unit
Monitoring and Evaluation using the
The Swedish National audit Office Theme – SAI and Government Oversight Promotion of IT IT support in the Judicial Chain Presentation at the 7th Performance.
Safety Management System Implementation
WORKING GROUP ON FOREST FIRES IN THE MEDITERRANEAN REGION
Methodical recommendations on carrying out Strategic Environmental Assessment in the Republic of Belarus.
The GEF Public Involvement Policy
Ontario Presentation to the NEB Modernization Expert Panel
© Fresh Thoughts Consulting
Task Force on GNB 14 – 15 November
Presentation transcript:

IRSC 2009 Båstad Learning from failure: Research initiatives towards improving safety and reliability of the Swedish railway system Alexander Wilhelmsson LUCRAM, Lund University, Sweden Kurt Petersen LUCRAM, Lund University, Sweden

IRSC 2009 Båstad, Sweden Introduction Overview of ongoing research activities aiming at improving safety and reliability of the Swedish railway system 3 case studies will be briefly presented Research question forming the starting point for all of the research activities: – What can we learn from failures in the railway system?

IRSC 2009 Båstad, Sweden Case study 1: Introduction The first of the three research activities is concerned with the ability to recover from failures affecting the railway system Two important aspects for describing a system’s resilience (i.e. ability to “bounce back” after failures) are its – Robustness – Rapidity Focus of this case study is on the system’s ability to return to normal operation after (large) failures, i.e. the rapidity aspect

IRSC 2009 Båstad, Sweden Case study 1: Response curves Particular focus on large failures where knowledge regarding available capacity is limited Previous failures (incidents and accidents) are used as a starting point By using so-called counterfactual scenarios in table-top exercises the aim is to gain knowledge of the capacity for handling (large) failures A workshop with employees from the Swedish Rail Administration has resulted in so-called response curves illustrating the recovery time with respect to the severity of strain The shape of the response curve reveal a number of interesting characteristics

IRSC 2009 Båstad, Sweden Case study 1: Vulnerability analysis The results from the present study are used as a starting point for vulnerability studies of the technical systems In this type of study, the use of recovery times are important in order to achieve realistic measure of the system’s overall vulnerability

IRSC 2009 Båstad, Sweden Case study 1: Discussion This case study contribute to improved knowledge regarding the capacity to restore the railway system after failures In particular, increased knowledge regarding the maximum capacity for handling failures can be gained The results are valuable for the assessment of the railway system’s overall vulnerability, e.g. for vulnerability analyses This information can be used as a basis for decision making regarding adequate resources in the face of future failures

IRSC 2009 Båstad, Sweden Case study 2: Introduction Case study 2 also use previous failures as a starting point However, in this study emphasis is on why these incidents and accidents happen The aim is to study how learning from previous failures can be used for avoiding failures in the future We should not only aim at avoiding the exact same accident, but to generally improve safety Accident investigations constitute an important tool for learning from accidents and incidents Case study 2 includes a comparison between the approach for investigating accidents and incidents in Sweden, Norway and Denmark Although the societies in general have a number of similarities, the investigation boards differ in some aspects between these countries What obstacles to learning from accidents can be identified, stemming from these differences?

IRSC 2009 Båstad, Sweden Case study 2: Initial studies An initial comparison between the accident investigation boards in Sweden, Norway and Denmark show some differences in terms of structure and responsibility 2002: Permanent AIB also includes railway accidents 2005: Permanent AIB also includes road traffic accents 1978: Permanent AIB for civil and military aviation accidents established 1989: Permanent AIB for civil aviation accidents established 2008: Permanent AIB includes aviation, sea, road traffic and railway accidents 2004: Permanent AIB for civil aviation and railway 2001: Permanent but separate AIB for road traffic accidents 1990: AIB includes 'all types of accidents' (AIB = Accident Investi- gation Board) 1979: Permanent AIB for aviation accidents established

IRSC 2009 Båstad, Sweden Case study 2: Preliminary results The preliminary results from this study indicate that some of the factors that influence the ability to learn from accidents include: – The structure of the accident investigation board, i.e. the number of investigators, their level and span of skills and competences – The mandate of the investigation board, i.e. ability to influence the implementation of recommendations and follow-up activities – The investigation method used by the investigators, i.e. what causes that are emphasized, the formulation of recommendations – The processing of information between involved actors, i.e. the way that findings in the investigation is conveyed Future work include analysis of a number of accident investigation reports issued by the accident investigation boards

IRSC 2009 Båstad, Sweden Case study 3: Introduction Case study 3 is focusing on safety investments in railway tunnel projects Several sets of guidelines and legislations are applicable for the safety design of railway tunnels in Sweden This has resulted in disagreements between different actors involved in the process, due to incompatibility of these legislations Attempts to solve disagreements and different views among authorities involved in tunnel projects have not been successful The aim of this study is to investigate; – how the decision making process and the outcome regarding safety investments is affected by these incompatible legislations, and – what bases for decision making that are used in practice

IRSC 2009 Båstad, Sweden Case study 3: Method and results The study is based on interviews and document studies including six railway tunnel projects in Sweden, consisting of a total of 28 tunnels 11 interviews have been carried out with a total of 18 persons The results from the interviews show that there has been a substantial focus on safety considerations from an early stage in all studied projects Disagreements become evident during the approval of building permit, which is required in order to build tunnels in Sweden

IRSC 2009 Båstad, Sweden Project C Final safety design Project B Final safety design Building permit Yes/No Decision making regarding safety design Revision of safety design No Final safety design Yes Employees from Swedish Rail Admin. Consultants Building proprietor § Rescue service Local building committee Municipality § § Project A Final safety design Several applicable legislations Decentralised decision making involving local building committee and local rescue service The role of the rescue service Comparisons with the outcome from other projects (“precedents”)

IRSC 2009 Båstad, Sweden Case study 3: Discussion Decentralised decision making in questions that are considered to be of national interest put a lot of pressure on local decision makers A detailed comparison of the different safety measures in each project shows that no major differences can be identified This can be explained by a substantial influence from comparisons with other projects (“precedents”) Suggestions on different ways of solving the identified problems have been put forward, e.g.: –excluding tunnels from the requirement for building permit –new attempts for achieving consensus or coordination between authorities –clarifying the role of the rescue service

IRSC 2009 Båstad, Sweden Conclusions Several processes that together influence the ability to improve safety and reliability of the Swedish railway system have been identified Learning from previous failures is a valuable starting point, both in order to gain knowledge of existing capacity and to make improvements The ability for generalization of the results needs to be further addressed Although further and more detailed studies are necessary, the different case studies provide valuable input in order to improve the safety and reliability of the Swedish railway system

IRSC 2009 Båstad, Sweden Finally… Thank you for your attention! Questions or comments?

IRSC 2009 Båstad, Sweden Case study 3: Description of studied projects

IRSC 2009 Båstad, Sweden Case study 3: Description of studied projects

IRSC 2009 Båstad, Sweden ©

IRSC 2009 Båstad, Sweden Case study 1: Empirical study Blue shadowed field: estimated minimum and maximum recovery time Black line: estimated most likely recovery time