Water Pollution and Water challenges in Ukhahlamba District Municipality Parliamentary Portfolio Committee Public hearings 3 and 4 June 2008.

Slides:



Advertisements
Similar presentations
Rolling out the Strategic Framework for Water Services Mike Muller: DG: DWAF SALGA and DWAF Water Summit 17 October 2003.
Advertisements

RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
1 SOUTH AFRICA’S BUCKET ERADICATION PROGRAMME WISA AFRICA Iris Lebepe DWAF 22 November 2007.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
PROVINCIAL FRAMEWORK FOR MONITORING OF THE GOVERNMENT WIDE 5-YEAR LOCAL GOVERNMENT STRATEGIC AGENDA 14 SEPTEMBER 2007 PROVINCIAL FRAMEWORK FOR MONITORING.
Portfolio Committee on Water Affairs and Forestry Support Received from DWAF and Amatola Waters Role in Rural Development of Water, Sanitation and Forestry.
1 WATER POLLUTION & WATER CHALLENGES PUBLIC HEARINGS 18 JUNE 2008 NGWATHE LOCAL MUNICIPALITY Presented By Mr. M.J. Toona.
Water Sector response to ASGISA IMC Department of Water Affairs and Forestry June 2008.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
1 FINANCING PRESSURES OF A DISTRICT MUNICIPALITY SALGA NATIONAL MEETING WITH MUNICIPAL MANAGERS 28 FEBRUARY 2011 Cacadu DM Municipal Manager Ted Pillay.
NATIONAL STRATEGY FOR WSP IMPLEMENTATION IN GHANA. Nii Okai Kotei Director, Water Public Utilities Regulatory Commission, Accra, GHANA IWA Africa Region.
Municipal Infrastructure Grant Sport and Recreation 15 February 2005.
IN YEAR MONITORING & BUDGET PREPARATION WORKSHOP PREPARED BY BUDGET OFFICE MAY
Part 2 - Simplified Strategy. The IWCM Process The IWCM process consists of two main parts: Part 1: An Evaluation Study ( recently completed); and Part.
INTEGRATED SUSTAINABLE RURAL DEVELOPMENT AND URBAN RENEWAL PROGRAMMES 26 FEBRUARY 2002.
Case Study on DWQ Ukhahlamba District Municipality What can we learn from this incident? Draft Response Strategy Presentation to the MCC 25 February 2010.
KOUKAMMA MUNICIPALITY INTERVENTION STATUS REPORT PRESENTED TO SELECT COMMITTEE 19 OCTOBER 2010 PARLIAMENT – CAPE TOWN.
PRESENTATION TO PORTFOLIO COMMITTEE ON THE APPOINTMENT OF CONSULTANTS DEPARTMENT OF HUMAN SETTLEMENTS ACTING DIRECTOR GENERAL – M TSHANGANA 1CONFIDENTIAL.
Presentation for Masibambane Co-ordinators 6 March 2007 Petunia Ramunenyiwa Water Services Sector Support Strategy.
Municipal Water Infrastructure Grant Standing Committee on Appropriations Presenters: Marissa Moore and Steven Kenyon | National Treasury | 5 March 2013.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
LG EQUITABLE SHARE Presentation to Portfolio Committee 5 June 2002.
Click to edit Master subtitle style 11 Capacity Development and Deployment Siyenza Manje Programme Presentation to Select Committee on Finance DBSA 01.
Limpopo - Health1 Report to the Select Committee on Finance on the Provincial Budgets and Expenditure Review 2001/ /08 and Conditional Grants and.
Western Cape Water Sector Plan Mr R Dyantyi MEC for Local Government & Housing (DLG&H) May 2007.
Social Housing Foundation. Meeting with Housing Portfolio committee Role, purpose and mandate Strategy map Supporting housing delivery Key achievements.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
Case Study Findings Water Dialogues – South Africa Presentation for Local Dialogue 6 March 2009 Water Services in Bushbuckridge Local Municipality.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
SELECT COMMITTEE ON FINANCE – 18 OCTOBER 2005 DEPARTMENT OF SOCIAL SERVICES AND POVERTY ALLEVIATION WESTERN CAPE PROVINCE PRESENTATION BY THE MEC & CFO.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
1 DISASTER MANAGEMENT Presentation to the Portfolio Committee on Provincial and Local Government 11 March 2003 (Mr LJ Buys)
National Department of Public Works Republic of South Africa National Department of Public Works Republic of South Africa 02 APRIL 2002 JAMES MASEKO DIRECTOR-GENERAL.
1 Department of Water Affairs and Forestry PRESENTATION TO SELECT COMMITTEE ON FINANCE – DoRA & CONDITIONAL GRANTS Presented by DWAF 12 March 2002 Water.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
FFC Framework for assessing Conditional Grants 16 March 2010 Financial and Fiscal Commission 1.
PROVINCIAL INFRASTRUCTURE GRANT NCOP 06 March 2006.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SPORT AND RECREATION MUNICIPAL INFRASTRUCTURE GRANT By Molatelo Montwedi Date: 14 June 2005.
Public Hearing on Water Pollution and Water Challenges Date: 04 th June 2008 Venue: Ground Floor, NCOP Building.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
Presentation to the Portfolio Committee on Provincial & Local Government Branch: Free Basic Services and Infrastructure Mr Yusuf Patel 19 ~ 20 February.
PRESENTATION TO PORTFOLIO COMMITTEE ON SPORT AND RECREATION SPORT INFRASTRUCTURE.
Public Hearings on Division of Revenue Bill, 25 February 2009 Presentation by Department of Water Affairs and Forestry 1.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS MAHOMED VAWDA Acting Chief Director: Institutional Oversight Dept of Water Affairs Dept of Water.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION
Presentation to the Portfolio Committee on Energy
Municipal Water Infrastructure Grant (MWIG)
Portfolio committee May 2007 MEC JF van Wyk
Provincial Blue Drop challenges
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Presentation to the Portfolio Committee: Water & Environment
Trevor Balzer: Acting CFO Helgard Muller : CD Water Services
SALGA Comments on LG Grants Division of Revenue Bill, 2011
PARLIAMENT OF THE REPUBLIC OF SOUTH AFRICA
Capricorn District Municipality
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
PUBLIC HEARINGS ON THE DIVISION OF REVENUE BILL
ANNUAL PERFORMANCE PLAN PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 18 APRIL 2018.
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
PROGRAMME 3 WATER SERVICES
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
MASILONYANA LOCAL MUNICIPALITY
Water Services Targets
PROGRAMME 2 CONT - NATIONAL WATER RESOURCES INFRASTRUCTURE BRANCH.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
VOTE 31: HUMAN SETTLEMENTS BUDGET ANAYLYSIS 2014/15
Presentation transcript:

Water Pollution and Water challenges in Ukhahlamba District Municipality Parliamentary Portfolio Committee Public hearings 3 and 4 June 2008

Map

Basic information 4 local municipalities in the district area: Gariep, Maletswai, Senqu and Elundini About people live in the district 80% live in Senqu and Elundini and 20% live between Maletswai and Gariep Only 17% of people live in towns Over 25% of the population is on child support grants Households with an income of less than R1500 per month (2006) Elundini 80.6%, Senqu 65.1%, Maletswai 58.4%, Gariep 58.1% Government, Agriculture and Trade are the main sectors supporting the economy Prevalence of Hiv and Aids is at 29.1% (among those who have tested.)

Briefing how Ukhahlamba addresses water quality in the WSDP The first WSDP (2004) did not sufficiently address Water Quality The new draft WSDP (2008) is more detailed and discusses water quality under the following headings: Situation assessment Future trend and goals Strategic gap analysis Implementation strategies

Strategies in draft reviewed WSDP to address water quality Appointment of competent water service providers. Upgrade water treatment plants within 2 years to provide reliable and sustainable SANS compliant water. Assist with the elimination of informal settlements to meet the national target by Return flow quality from sewerage treatment works to comply with SANS standards. All rural households to be provided with sanitation by 2010.

Challenges to meet interventions with regards to water quality as per the WSDP Appointment of competent water service providers. Section 78 process completed in Report indicated Local Municipalities (LMs) did not have sufficient capacity at the time, however Council decided in terms of its mandate to “ Support and Capacitate Local Municipalities ”, to appoint them as Water Service Providers as they were historically providing this service. Despite capacity building efforts by the WSA the LMs have not advanced sufficiently nor geared themselves to become efficient WSPs able to provide the service at the quality required. The WSA is in the process of reviewing water provision services in the District. The challenge: The previous Service Level Agreement did not sufficiently address performance nor water quality. This has been rectified in new Service Level Agreements. Financial resource challenges over the past year restricted the WSA from taking sufficient proactive action to intervene in the WSPs and rectify the situation.

Challenges to meet interventions with regards to water quality as per the WSDP Upgrade water treatment plants within 2 years to provide reliable and sustainable SANS compliant water. Arising from fluctuating water quality, in October 2007 an investigation to determine which water treatment works needed prioritized intervention was undertaken. Based on this report the WSA invited DWAF to visit the treatment works and based on this an application for funding was submitted. In April 2008 DWAF did a situation analysis of some of these prioritized water treatment works in the District. Out of the 5 assessed, only 1(Sterkspruit WTW) was “ in good state of repair ”. The others were is a serious state of collapse and likelihood and impact of failure was deemed to be high. The study did not however indicate the remedial measures and the cost to rectify the problems. DBSA support is currently identifying remedial measures and costing all 12 WTW in the District. It is now proposed that the Local municipalities will only provide reticulation services and a separate water provider (such as a water board) will run all the water and sanitation treatment works. A further provider will oversee water demand management and catchment management. The challenge : We expect the cost for the remedial works to be exorbitant (in excess of R30million) Prior to 2006/7(adjustment budget) the municipality did not have a capital replacement fund. The Municipality has been in financial difficulty and has not been in a position to apply for loans.

Challenges to meet interventions with regards to water quality as per the WSDP Assist with the elimination of informal settlements to meet the national target by Bulk service provision is the responsibility of the WSA (Ukhahlamba DM) and fully dependent on MIG funding. The MIG fund for Ukhahlamba is fully committed over the MTEF on water /sanitation projects to meet backlogs. Ukhahlamba DM has a good history of spending MIG funds. The challenge: Insufficient capital funding for new bulk infrastructure development. Amounts are uncertain at this stage as the housing sector plans are still being developed by the Local Municipalities in conjunction with the Dept of Housing.

Challenges to meet interventions with regards to water quality as per the WSDP Return flow quality from sewerage treatment works to comply with SANS standards. This is an area that has been ineffectively monitored due to the Service Level Agreement with WSPs not being sufficiently performance based. Within the WSA there have been capacity constraints (as the tariffs were below cost recovery and there were a number of unfilled EHP posts). Tariffs have been amended and posts have now been filled. DBSA is currently assisting with a baseline study on return flow quality (and also leachate from landfill sites). The challenge: Competent water service providers to appropriately implement systems and procedures around return flow quality The distance to laboratories to test water or effluent quality is in time distance further than the standards, resulting in potentially compromised results as bacteria growth continues whilst in transit.

Challenges to meet interventions with regards to water quality as per the WSDP All rural households to be provided with sanitation by The DM has currently 76% sanitation backlogs (64945 households) and requires R335m to eradicate them. Presentations made to DPLG and DWAF to solicit additional funding to deal with backlogs have not been successful to date. Plans to implement projects are in place as identified in the Sanitation Master Plan but funding is lacking The Sanitation Master Plan also highlights the increased operations and maintenance costs of all newly built infrastructure. Challenge: The MIG fund of Ukhahlamba is fully committed over the MTEF on other water / sanitation projects to meet backlogs (55% on water and 45% on sanitation) Insufficient capital funding for new infrastructure and subsequent operations and maintenance.

Relationships around compliance mechanisms National compliance (DWAF) Policy, support, regulation and information Local compliance (WSA) By-laws: Promulgated By-laws are in place Develop and implement policies: Reviewed indigent policies and credit control policies are in place Tariffs: Tariffs have been revised to be realistic from 1 July 2008 Planning : WSDP is under review and Sanitation Master plan is complete WSP arrangements: under review, Service Level Agreements not signed Monitoring of WSPs: monthly coordination meetings - poorly attended by LMs. Local compliance (WSP) Provide water and sanitation services to meet required standards. Prepare water sector plans. Identify projects to improve water and sanitation services.

How does Ukhahlamba respond to poor water quality It has been understood that the WSP had the responsibility to inform communities of failures or potential failures in water quality. Due to this not happening despite our monitoring identifying problems, the Water Services Authority instituted boil notices across the district area (to all potentially compromised communities) in April 2008 and these are all still in place Prior to this the WSA had been informing the WSP that the monitoring had identified poor water and were pressurizing them to take action through administrative and political avenues As a last resort Ukhahlamba WSA has carted water in instances where there has been a total failure in water provision.

Awareness Programmes around water quality issues Prior to March 2008 Sanitation resource centre undertakes health and hygiene awareness in the rural areas of Elundini (mainly at schools and clinics) (ongoing programme). Health and hygiene training provided to hawkers ( ongoing programme in the entire district area). Health and Hygiene training in Ugie in Schools around water demand management and health and hygiene, linked to the upgrading of infrastructure to respond to the PG Bison investment. Health and Hygiene awareness as part of the implementation of all sanitation projects including the eradication of buckets. Premises inspection of public facilities and reports prepared for their management on how to improve health and hygiene ( such as Empilisweni Hospital and Cloete Joubert Hospital).

Awareness Programmes around water quality issues Clinic awareness through tabling of water quality reports in the District Health Advisory committee ( a structure of the Department of Health). Water committees at ward level, have been established in Senqu and Elundini to deal with all water related problems. ( This is a link between the community and the WSP and WSA). Political awareness through the provision of water quality reports to District Municipality structures ( standing committees, Mayoral Committee and Council), as well as the District Mayors Forum. Water quality a standing item on the WSP/WSA monthly coordination meetings and DWAF bilateral meetings. Tabled a draft water quality communication strategy to council in April 2008 to improve communication to all role-players and the community. Observe national water week and sanitation week ( on a annual basis) to add further impetus to the health and hygiene awareness programme currently undertaken to communities.

Awareness Programmes around water quality issues Post March 2008 Issued Boil notice at the end April 2008, when it became clear that the monthly water quality results ( that were disputed by WSPs based on testing by independent service providers) had been affirmed by DWAF. Issued to all potentially compromised communities ( only excluded the towns of Sterkspruit, Barkly East, Rhodes, and Steynsburg). All Boil notices are still in place. Notices issued to all schools, cr è ches, hospitals, clinics, and community organisations. Intensified health and hygiene training for all communities where diarrhoea among infants had occurred. Intensive sanitation week awareness linked to broader awareness around poverty, government assistance and health undertaken together with the social cluster ( Dept of Social Development, SASSA, Dept of Health and Ukhahlamba District Municipality).

Monthly water quality reporting Ukhahlamba tests for E.Coli, Total Plate Counts and Coliforms. Water quality has fluctuated over the past months. The “ needs attention ” is usually due to high number of Coliforms. The “ failures ” have been due to the presence of E.coli.

Reporting to DWAF Ukhahlamba DM takes on average 52 samples per month to monitor WSPs and has been consistent with water sampling since 2006 Samples of all urban schemes and only rural schemes at the rural nodes as defined in the District Spatial Development Framework are taken

Anomalies in Water Quality E.coli indicates a lack of chlorination Total Plate count and Coliforms indicate poor operations and management of the water systems These are exacerbated by: Overall poor condition of water treatment plants due to ageing infrastructure, insufficient preventative maintenance due to lack of funding. Lack of skilled operators responsible to operate Water and Sanitation Treatment Works. Inadequate supervision of operations and maintenance as well as management of infrastructure. Insufficient funding to implement programmes to meet the sanitation and water backlogs Lack of understanding by local municipalities of the magnitude of responsibility they have taken on, through signing a service level agreement to be water service providers.

Funds available to address water quality issues Water Service Providers (currently R23.5m – direct costs excluding personnel) Elundini water services ( Elundini LM and Sintec): General maintenance (including rural areas)R5.4m Chemicals R220,000 Senqu water services (Senqu LM and Bloemwater) General maintenance (including rural areas) R15.6m Chemicals R150,000 Maletswai water services General maintenance R785,000 Chemicals R700,000 Gariep water services General maintenance R301,000 Chemicals R370,000

Funds available to address water quality issues Water Services Authority (23% of the current total operating costs of the municipality) Training of staff R305,000 Monitoring and evaluation R169,000 Municipal Health Services: Water quality testing R MIG budget relating to water quality R21.8m committed to new infrastructure which equates to 22% of the MIG allocation Maclear waste water works R3.5m Ugie new water treatment plant R12m Steynsburg new water treatment works R6.3m

Technical and scientific skills to purify water WSA (District Municipality) Technical Director : B.Tech Civil engineering degree, 20 years experience in engineering field WSA Manager: N.dip Civil Engineering, studying towards a B.Tech degree, 9 years experience WSP Manager: N.dip Civil Engineering, studying towards a B.Tech degree, 6 years experience Currently on advert for the filling of 4 water technicians posts (1 per LM area) Manager Municipal Health Services: B.Tech Environmental Health. 16 years experience 1Snr EHP, B.Tech Environmental Health with 4 years experience 16 Jnr EHPs, with either N.Dip and B.Tech Environmental Health and ranging in 5months to 3 years experience(9) and 2 with plus 18 years experience. (Large staff turnover)

Technical and scientific skills to purify water WSPs ( Local Municipalities) Gariep: no engineer, post advertised Maletswai: N.Dip civil engineering Senqu: N3 electrical engineering Elundini: N.Dip civil engineering, post being advertised. In general, water supervisors are not skilled, however, Elundini has appointed from 1 April 2008 a supervisor with 7 years experience in water treatment. WSPs ( Bloemwater and Sintec) have extensive capacity in engineering and water quality. Water and Sanitation learnership underway whereby 38 school leavers are being trained. Complete training by October, and will be drafted into the Water Treatment facilities. With DWAF support, have provided short course training for all current water treatment supervisors (Feb 2008)

Role and assistance by DWAF, DPLG and water boards DWAF Long term and constant support provided by DWAF over a number of years Water specialist assigned to the WSA from 1 May 2008 for 3 months to assist in improving systems in water treatment and management Initiated more detailed training of water treatment operators Provided bleach and soap during the time of crisis Provided additional hands on support around health and hygiene awareness for two weeks in May 2008 Provided collaborating water tests to cross check WSA results Tested stools to check for pathogens and to do DNA profiling to ascertain if the pathogens were from water Water treatment audit to ascertain gaps and determine critical areas of intervention In process of revising the eWQMS to better respond to the needs of water management in the area.

Role and assistance by DWAF, DPLG and water boards DBSA Water specialist assigned to the WSA from 19 May 2008 for indefinite period to lend capacity to the WSA and WSPs Verbally committed to provide funding for : testing equipment to all treatment works and for Environmental Health Practitioners to test turbidity and chlorine levels of treated water support to do a situation analysis and determine costs to refurbish water treatment works Baseline studies of raw water sources, return flow quality, rural water quality Health and hygiene awareness programmes ( training of trainers: EHPs and CDWs) Database development for the capturing and analysis of performance data Bloemwater (Water board providing services in the rural areas of Senqu Municipality) supported the WSA with additional chlorine tablets and canisters, carting of water to potentially compromised areas, cleaning of the Epilisweni hospital water treatment works (on behalf of the Dept of PW and Dept of Health) DPLG The report on the cost of the refurbishment of water treatment works will be forwarded to DPLG for funding

Thank you.