Request for Waiver from Accessibility Requirements of Chapter 553, Florida Statutes Picerne Storage Building Annex.

Slides:



Advertisements
Similar presentations
Landmarks Preservation Commission.
Advertisements

SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Achieving Sustainable Design with Automated Parking
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Charter School Petition Training: Facilities Cobb County School District.
GREENBERG TRAURIG, LLP | ATTORNEYS AT LAW | Application for Waiver for Sanctuary 7 Pilates 1700 S.W. 3 rd Avenue Miami, Florida.
Board of Standards and Appeals Community Board 3 / Manhattan June 13, 2011 Introduction Introduction Applications: Applications: –Variances –Special Permits.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC January 27, 2015.
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
1 “Making Rural Development Multifamily Projects Accessible” Based on work by Larry Fleming RD Olympia State Office, April 2014.
IBC 2006 Chapter 5 Building Height and Areas After determining occupancies, the code analysis determines what height and areas are allowable for the occupancy.
LAWS & RULES MANUFACTURED (MODULAR) BUILDINGS PROGRAM.
Northwest Region CSI S508 Code Part 2 Seminar 1A Stephen Winstead, AIA.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Discussion and Possible action on the historic designation by the City of Laredo Landmark Board on certain LISD Schools.
Chapter 10 Fire Prevention. Introduction One of the most important and least recognized jobs that the fire department performs is fire prevention Prevention.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
BCC APPEAL PUBLIC HEARING ON BZA #SE APPLICANT/APPELLANT: FIRST KOREAN PRESBYTERIAN CHURCH OF ORLANDO Orange County Zoning Division December.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
Site Plan Review 8 May 2013 Jeff Shaw, AIA Principal-in-charge Newton Fire Station #10.
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
Board of County Commissioners PUBLIC HEARING September 1, 2009.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Architectural Control Committee Heritage Hills 3195 Heritage Hills Blvd. Clermont, Florida PH: Fax Community Name: Heritage.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
Affordable housing project
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
Historic Review Board Continued Public Hearing: DR – th St. October 20, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Wherever Your Path May Lead …. RTS Takes You There!
Board of County Commissioners PUBLIC HEARING November 9, 2010.
Planning & Community Development Department Board of Zoning Appeals: Hillside Development Permit # Hillcrest Place City Council March 14, 2016.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Planning Task Force March 31, 2016 Zoning & Building Compliance Certification (LDC 346 Zoning Compliance Permit) Presented by: Nicole M. Knapp Planning.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
The Heights at Meadow Springs HOA Annual Meeting April 12, 2016.
ACCESSORY DWELLING UNIT REGULATIONS ZOA Tuesday, October 9, 2012.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
City of Dayton Department of Planning & Community Development
Hillside Development Permit 09-38
Jefferson County SA Red Rocks Site Approval
General Road Construction Information
Community Development November 2011
Construction Management & Inspection
BUILDING INSPECTION Amy Link, Assistant Director of Development Services Ken “KC” Crow, Building Official Lisa Mann, Office Manager.
2007 Bond Issue Capital Improvement Program
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
City Council Meeting November 14, 2016
Washoe County Board of Adjustment
Presentation transcript:

Request for Waiver from Accessibility Requirements of Chapter 553, Florida Statutes Picerne Storage Building Annex

1. Name and Address of Project: Picerne Storage Building Annex 247 North Westmonte Dr. Altamonte Springs, FL Name of Applicant: Picerne Development Corporation Gary Pascioni Sr. Vice President of Construction

3. Description [ x ] Alteration to an existing building or facility. 4. Type of facility The subject building is a storage annex to an office building. Storage building is single story with mezzanine/ loft for additional storage. Square footage of each floor is 766 s.f., for a total of 1,633 s.f., (15’-4” x 50’-0”) 5. Project Construction Cost $15,500

6. Project Status: [ x ] In Plan Review [ x ] Completed* The project is seeking after- the-fact approval from the City of Altamonte Springs for the building modifications made to convert the bus garage to a storage facility. Accessibility issues must be addressed per codes and to the satisfaction of the building official. The building official has agreed that this waiver process may be used to waive accessibility requirements.

7. Requirements requested to be waived. Issue 1: s F.S. Vertical accessibility to storage mezzanine of Annex Bldg. Issue 2: s F.S. Access to and parking for Annex Bldg.

8. Reason for Waiver Request: [ x ] The hardship is caused by a condition or set of conditions affecting the owner which does not affect owners in general.  Modification is to change the existing bus garage into a storage building annexed to the existing Picerne Office Building  To be used as an accessory building  Will not be separately occupied or leased  Primary use will be for storage of documents in file boxes for the Picerne accounting, development and construction departments regarding approximately 90 multi-family projects located across the country and Puerto Rico.  Provide storage for the architectural and engineering plans for the various projects.

8. Reason for Waiver Request: (cont.)  Typically accessed by only four people  Access only needed when a document needs to be located for back up  Typically accessed no more than once a week  Once a year the area will be reorganized and old files disposed of and new ones added. This event takes about two days for two existing staff members.  There will be no permanent personnel assigned and no permanent work stations. No additional staff is needed for the storage functions.  Fire sprinkler protection system, but there are no potable water facilities

 Providing access to the Annex Building will require extensive site work to provide an accessible route to the Building. Existing site grades and parking lot configuration will require substantial demolition, regrading and repaving to meet surface slope requirements of the Code for the parking space, access aisle and access route. There is no existing pedestrian pathway from the office building to the garage/storage building. 8. Reason for Waiver Request: (cont.) [ x ] Substantial financial costs will be incurred by the owner if the waiver is denied.

9. Cost Estimates  a. Vertical Accessibility: Providing vertical accessibility to the Storage Mezzanine is more than the cost of, and potentially more than double the cost of construction for the Mezzanine.  Mezzanine Cost: $15,500  Elevator Cost:$75,000  Lift Cost:$18,000  LULA Cost:$30,000

9. Cost Estimates (cont.)  b. Accessible Parking, Approach and Entrance: Site demolition, regrading and repaving to provide an accessible parking space with an accessible entrance to the Annex Building would cost more than 20% of the cost to construct the Storage Mezzanine.  Mezzanine Construction Cost:$15,500  Parking, Accessible Route & Entrance Cost: $ 8,600  Demolition, disposal and regrading: $ 2,400  Concrete curb and asphalt paving:$ 3,500  Paint:$ 300  Sign & Post:$ 200  Curb ramp:$ 1,000  Grass Sod:$ 200  Irrigation/utility adjustments:$ 500  Sidewalk/Entrance:$ 500 (56% of Mezzanine Construction Cost)

10. Licensed Design Professional

Certification of Applicant

Review and Recommendation by Local Building Official Why is this issue being referred to the Commission?

Review and Recommendation by Local Building Official (cont.) Comments/Recommendation:

Drawings and Supporting Documents: Next 3 Slides:  Site Plan: Showing location of Storage Annex  Accessible Parking, Accessible Route and Entrance: Disturbance and Restoration Area  Loft Storage: Showing location of Storage Annex

 Site Plan: Showing location of Storage Annex STORAGE ANNEX 766 GSF – STORAGE PER CITYOF ALTAMONTE SPRINGS BUILDING DEPARTMENT, ANNEX SHALL ONLY BE USED IN CONJUNCTION WITH THE PRINICAL OFFICE BUILDING AND ITS EMPLOYEES. A SEPARATE LEASE SHALL NOT BE ALLOWED. STORAGE ANNEX 766 GSF – STORAGE PER CITYOF ALTAMONTE SPRINGS BUILDING DEPARTMENT, ANNEX SHALL ONLY BE USED IN CONJUNCTION WITH THE PRINICAL OFFICE BUILDING AND ITS EMPLOYEES. A SEPARATE LEASE SHALL NOT BE ALLOWED. Accessible Spaces Existing Parking includes the 3 accessible spaces that are required to service the principal building.

 Accessible Parking, Accessible Route and Entrance: Disturbance and Restoration Area  Demolition and reconstruction of asphalt pavement, concrete curb & gutter and concrete sidewalk  Disturbance and restoration of earthwork, utilities, irrigation and grass n

LOFT STORAGE NO POTABLE WATER NO ELECTRIC POWER FIRE SPRINKLERS, & LIGHTING ONLY  Loft Storage: Showing location of Storage Annex