Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.

Slides:



Advertisements
Similar presentations
Special Inspections
Advertisements

Background Presenters Work done in preparation for WHS changes
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
Our Vision – Healthier Kansans living in safe and sustainable environments.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
EQUIPMENT VALIDATION.
Personnel Qualifications and Responsibilities. Become familiar with:  Prescribed and wildland fire organizational structures.  Qualifications and responsibilities.
©2010 Prentice Hall Business Publishing, Auditing 13/e, Arens/Elder/Beasley The CPA Profession Chapter 2.
1 Expertly Engineering Safety From Fire NFPA 25 As A Means to Improve Sprinkler System Reliability William E. Koffel, P.E., FSFPE President Koffel Associates,
Crane Operations Objective
Florida Product Approval System Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee, FL
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
Purpose of the Standards
FIRE ALARM SYSTEMS AND FUNDAMENTALS
Permit to Work Procedure Document Number: KOC.SA.004
How to pass the test Stephen Shorrocks David Starr.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Chapter 14: Inspection and Maintenance
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
DIFSC 2011 Increasing Managerial Responsibility to Ensure Food Safety: The Concept of A Trained Person in Charge Asia Al Raeesi Acting Head of Food Studies.
Navigating the New NICET Certification Model
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
The CPA Profession Chapter 2 By Arens et. al. Learning Objective 1 Describe the nature of CPA firms, what they do, and their structure.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Part of the BRE Trust Approved Certifiers of Design: Section 6 (Energy) BRE Scotland.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
BCGWA Ground Water Protection Regulation Workshops 2005 BCGWA Conference Penticton, B.C. March 3-4, 2005 Gilles Wendling Kaya Forest.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
1 Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
© 2008 Delmar, Cengage Learning Fire Protection Systems and The Model Code Process Chapter 2.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
Sprinkler Loads on Trusses Educational Presentation.
Permit Process & Application Guide
UnionPay Card Manufacturer Certification Introduction.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Hot Work Permit Osan AB Fire Emergency Services.
Fire Alarm Verification CAN/ULC-S561-03
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview.
New Energy Centre at Megawatt Park 15 April 2014.
Florida Fire Marshal Rules 69A-46 Revisions – 2016 WATER BASED FIRE PROTECTION SYSTEMS June, 2016.
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
The CPA Profession Chapter 2.
Louisiana AFAA State Fire Marshal Questions Quarterly Meeting
Credentialing Requirements
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
PREPARATION FOR GMP INSPECTION
Clinical Engineering Lecture (3).
Global Connections Day Building Safety Service Provider
Temporary Works Co-ordination
GMP Inspection Process
“How you can become a licensed contractor”
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Understanding the Space Park Requirements
Fire Alarm Tech Practice Test # 16 NICET
Presentation transcript:

Road Map to a Green Tag Paperwork=Time=Money

Questionnaire If you could change any one major thing inside the Fire Community Services process what would it be? If you could change any one major thing inside the Fire Community Services process what would it be? What part of the approval process is working pretty well and tell us why? What part of the approval process is working pretty well and tell us why? If there is something that could make it better still, what would it be? If there is something that could make it better still, what would it be? What part of the process is really broken and really needs to be fixed? What part of the process is really broken and really needs to be fixed? What would help make this problem area better? What would help make this problem area better? If you were head of the Fire Community Services Division, the first thing you would take care of would be… If you were head of the Fire Community Services Division, the first thing you would take care of would be…

The Plan Submittal Process for New Stand Alone Buildings Building Plans including BTR required fire protection details are submitted for building permit Once building permit is issued the developer can begin building construction A permitted FP contractor must submit the “shop” drawings for approval prior to framing inspection Once approved these shop drawings are issued an installation permit.

Plan Submittal Process for TI’s Building Plans including BTR required fire protection details and FP “shop” drawings are submitted for building permit Building permit and FP installation permit is issued concurrently and the developer can begin construction

Why 2 Systems Does not hold up developers from breaking ground waiting for fire alarm drawings Does not hold up developers from breaking ground waiting for fire alarm drawings Reduces the opportunity for change orders by having the FP systems designed according to “approved” plans Reduces the opportunity for change orders by having the FP systems designed according to “approved” plans Provides Quality Control by ensuring that a “permitted” FP contractor is doing or at least responsible for the work. Provides Quality Control by ensuring that a “permitted” FP contractor is doing or at least responsible for the work. TI construction moves too fast to have FP installation drawings deferred TI construction moves too fast to have FP installation drawings deferred

What is the BTR Board of Technical Registration Board of Technical Registration Regulates the Professional Registrants Regulates the Professional Registrants If a registrant feels that they are qualified to design the BTR allows them to do so If a registrant feels that they are qualified to design the BTR allows them to do so They only follow up after a complaint They only follow up after a complaint Sets Rules about what must be done by professional registrants Sets Rules about what must be done by professional registrants

BTR Requirements Fire Alarm Fire Alarm Determine system type Determine system type Determine applicable codes Determine applicable codes Determine device type and locations Determine device type and locations Prepare generalized riser diagram Prepare generalized riser diagram Coordinate interface with other systems Coordinate interface with other systems Develop system specifications Develop system specifications

NFPA 72 requirements System Designer System Designer Fire alarm system plans and specifications shall be developed in accordance with this Code by persons who are experienced in the proper design, application, installation, and testing of fire alarm systems Fire alarm system plans and specifications shall be developed in accordance with this Code by persons who are experienced in the proper design, application, installation, and testing of fire alarm systems The system designer shall be identified on the system design documents. Acceptable evidence of qualifications or certification shall be provided when requested by the authority having jurisdiction. Qualified personnel shall include, but not be limited to, one or more of the following: The system designer shall be identified on the system design documents. Acceptable evidence of qualifications or certification shall be provided when requested by the authority having jurisdiction. Qualified personnel shall include, but not be limited to, one or more of the following: (1) Personnel who are factory trained and certified for fire alarm system design of the specific type and brand of system being designed (1) Personnel who are factory trained and certified for fire alarm system design of the specific type and brand of system being designed (2)* Personnel who are certified by a nationally recognized fire alarm certification organization acceptable to the authority having jurisdiction. (2)* Personnel who are certified by a nationally recognized fire alarm certification organization acceptable to the authority having jurisdiction. (3) Personnel who are registered, licensed, or certified by a state or local authority (3) Personnel who are registered, licensed, or certified by a state or local authority

BTR Requirements Sprinkler Systems Sprinkler Systems Consider the range of hazards of the project Consider the range of hazards of the project Prepare a hazard analysis Prepare a hazard analysis Identify the hazard classification Identify the hazard classification Special hazards Special hazards Determine applicable codes Determine applicable codes Ascertain the availability and adequacy of the water supply Ascertain the availability and adequacy of the water supply Determine appropriate design density and area of operation for each hazard Determine appropriate design density and area of operation for each hazard

City of Peoria Fire Code Section Any person, corporation, partnership or other entity engaged in the business of design, install, monitor, sell, or service within the City of Peoria shall, obtain a permit from the Fire Department. The permit application shall include the following: Copy of State and City license, and Copy of Certification. Section Any person, corporation, partnership or other entity engaged in the business of design, install, monitor, sell, or service within the City of Peoria shall, obtain a permit from the Fire Department. The permit application shall include the following: Copy of State and City license, and Copy of Certification.

Fire Alarm Installation Must be directly supervised by a Must be directly supervised by a NICET II person NICET II person CSA Certified person CSA Certified person

Sprinkler Installation Must be directly supervised by Must be directly supervised by CSA Certified person CSA Certified person

Submitted Questions/Concerns Lead Time – Lead Time – Average turn-around time for 2006 was 11 days Average turn-around time for 2006 was 11 days Duct detector test report – Duct detector test report – If duct detectors are required and were included in the design they must be functional at time of final fire alarm test. If duct detectors are required and were included in the design they must be functional at time of final fire alarm test. Electrical inspections not conducted until fire alarm drawings are approved – Electrical inspections not conducted until fire alarm drawings are approved – Once this inspection is conducted the sheetrock goes on and everything is covered up. Once this inspection is conducted the sheetrock goes on and everything is covered up.

Submitted Questions/Concerns Move in ready suite designs incur additional step/penalty – Move in ready suite designs incur additional step/penalty – If no walls are being moved or added there is no need for FP plans If no walls are being moved or added there is no need for FP plans Fire inspection conducted for a tenant and the tenant was billed. Land lord did not call for an inspection and an inspection was not required at that time. Fire inspection conducted for a tenant and the tenant was billed. Land lord did not call for an inspection and an inspection was not required at that time. A final fire inspection on a newly constructed building or TI is not the same as the annual fire inspection process A final fire inspection on a newly constructed building or TI is not the same as the annual fire inspection process

Submitted Questions/Concerns Is the problem with the fire protection systems with the design or with the contractor – Is the problem with the fire protection systems with the design or with the contractor – First the design must be correct then we hold the contractor accountable. First the design must be correct then we hold the contractor accountable. Moved the issues from the final inspection to the beginning of the process. Moved the issues from the final inspection to the beginning of the process.

Submitted Questions/Concerns What are the issues that the plans examiners seeing between the conceptual and shop drawings? What are the issues that the plans examiners seeing between the conceptual and shop drawings? Some engineers send in more details than what is required. Some engineers send in more details than what is required. Engineer’s drawings are general device information Engineer’s drawings are general device information Many times does not have access to manufacturer’s information (proprietary) Many times does not have access to manufacturer’s information (proprietary) Lacks specific code knowledge Lacks specific code knowledge The installing contractor needs to submit drawings that are for the specific system being installed The installing contractor needs to submit drawings that are for the specific system being installed Wiring methods Wiring methods System specific nuances System specific nuances Device loads Device loads They have the required permit to do the work They have the required permit to do the work

Submitted Questions/Concerns What is driving this requirement? What is driving this requirement? Failure rates of New Fire Alarm Installations Failure rates of New Fire Alarm Installations 70% 70% EFO research EFO research

Submitted Questions/Concerns Peoria is the only City with these requirements Peoria is the only City with these requirements MesaSurpriseScotts.SednaKingmn.Glend.Presct. State FM Do you allow deferred submittals?Yes NoYes Do you require shop drawings to be submitted and approved prior to installation?NoYes

Tools for the Customer E-news E-news Submittal Checklists Submittal Checklists New stand alone New stand alone TI TI Plan Review Guide for Engineering Design Plan Review Guide for Engineering Design Fire Inspection Checklist for New Constructrion Fire Inspection Checklist for New Constructrion

Questionnaire If you could change any one major thing inside the Fire Community Services process what would it be? If you could change any one major thing inside the Fire Community Services process what would it be? What part of the approval process is working pretty well and tell us why? What part of the approval process is working pretty well and tell us why? If there is something that could make it better still, what would it be? If there is something that could make it better still, what would it be? What part of the process is really broken and really needs to be fixed? What part of the process is really broken and really needs to be fixed? What would help make this problem area better? What would help make this problem area better? If you were head of the Fire Community Services Division, the first thing you would take care of would be… If you were head of the Fire Community Services Division, the first thing you would take care of would be… The End The End