A Brief on (C-DAP) for Katihar District Prepared by Bihar Institute of Economic Studies 103A/1, Nageshwar Colony, Boring Road, Patna
2 Map of Katihar
3 General Statistics No. of Blocks16 No. G. Panchayats238 Revenue Village:1547 Inhabited1237 Uninhabited290 Total Population (Rural) Population/G.P Average Rev. Village/G.P6.5 Sex-Ratio919 Percentage of SC Population8.70 ST Population5.9
4 District Income/Intra-district growth DistrictGDDP (in Rs. Cr.) Per Capita GDDP (in Rs.) Katihar Patna (Highest)15, ,441 Seohar (Lowest)204.73,636
5 Credit/Deposit Ratio (C.D. Ratio) ParticularsBihar (All Banks) Katihar Commercial Bank Regional Rural Bank Total Deposit (Rs in cr)56, Total Credit (Rs in cr)19, Credit/Deposit Ratios Source - Economic survey year
6 Land Use
7 Class I Land – Class II Land– Class III Land– Class IV Land– 7.77 Class V Land –6.48 In percent
8 Land Holding In percent
9 Area, Production and Productivity Trend of Main Crops in the District (Area-000’ha, Production-000’MT, productivity-qn/ha) Name of Crop to (Projected) (Projected) (Projected) (Projected) APYAPYAPYAPYAPY Paddy Jute Maize (Rabi) Wheat Masoor Potato
10 In percent
11 Irrigation By Source In percent
12 Soil TextureSandy loam to clay loam PH Value6.5 to 7.5 Organic carbon0.22 – 1.2 % Available Nitrogen150 to 300 kg/ha Available Phosphorus10 to 15 Kg/ha Available Potash150 to 250 kg/ha Saline/Alkaline affected soil area Ha
13 Requirement of Fertilizer (In tones) Fertilizer Urea DAP MOP SSP NPK Source: District Agriculture Officer, Katihar
14 Overhead/Transportation cost for fertilizer Year Overheads/transportation etc. (Rs in Lakh) Total156.06
15 Vermi/NADEP Compost (Physical & Financial Requirement) Items/yearPhysical/(No.)Financial requirement (Rs. Lakh) Total
16 Integrated Nutrient Management (Physical & Financial Requirement) Items/yearPhysical/(No.)Financial requirement (Rs. Lakh) Total
17 Distribution of Micro nutrients YearPhysical/(No.)Financial requirement (Rs. Lakh) Total
18 Total fund requirement for Soil health Management is as follows: Name of programme Financial requirement (Rs. in Lakh) Total Overhead cost for imported fertilizers Vermi/NADEP Compost Integrated Nutrient Management Distribution of Micro-nutrient Application of Gypsum/pyrites Grand Total
19 Total financial assistance for Drip Irrigation & Sprinkler irrigation Financial yearAreaTotalFinancial Assistance (Rs. In Lakh) Drip IrrigationSprinkler irrigation (Ha.) Area (Ha.) (Ha.) Total
20 Crop Protection Centre Type of CentreExistsProposed Plant Protection Centre 116 Soil Testing Laboratories 115
21 Fund requirement for proposed crop protection Centre Name of Programme Financial Requirements. (Rs. in Lakh) Total Operationalisation of P.P. Centre Soil testing laboratory Grand Total
22 Financial requirements for farm mechanization Items/yearSubsidy on implements. (Rs. In Lakh) Total
Storage Capacity Source: District Agriculture Officer, Katihar Storage Existing (No.) Capacity Felt requirements No.Capacity Cold Storage MT99000MT Rural godown MT MT Onion storage -100 MT4400 MT Marketing Yard MT
24 Annual Seeds Requirement CropQuantity of seeds to be distributed per farmer (Kg) Annual seed requirement (qn) Wheat Rice Maize Arhar Gram Moong Rai/Sarson/Tori Total
25 Proposed coverage of seed villages and its Financial Requirement Items/year No. of seed village Total area put under seed production (ha) Financial Requirement (Rs. In Lakh) Total
26 Total Financial requirement of the Seed Plan Name of Programm Total Crash Programme Production of foundation seed on SMF Seed Village Programme Distribution of quality seed Infrastructure development Total
27 Physical Programme for transfer of technology ComponentsYearTotal Farmers Field School Farmers Training on crop production Farmers training an Farm mechanization Demonstration of seed production Technology Demonstration on Crop Production Demonstration of SRI Demonstration on Hybrid rice (Parati) Exposure Visit Officers training Training of Facilitators Kishan Summan Yojana16 64 Total
28 Financial requirements for transfer of technology Rs. In Lakh ComponentsYearTotal Farmers Field School Farmers training on Crop production Farmers training on Farm mechanization Demonstration of seed Production technology Demonstration on Crop Production Demonstration on SRI Demonstration on Hybrid Rice (Pavati) Exposure Visit Officers training Training of Facilitators Kishan Samman Yojana Total
29 Sector wise Financial Requirement Estimated Rs. In Lakh Sector Total Soil Health Management Water conservation Water Resource Management (Drip & Sprinkler Irrigation) Various activities under crop protection Farm Mechanization Enhancement of crop productivity & intensity Financial requirement for the seeds plan Transfer of technology Total
30 Breeds CowCrossbreed38782 Indigenous BuffalowImproved11752 Indigenous GoatsImproved1945 Indigenous PoultryBroiler Layer Other Note:- 144 GP does not have any veterinary Institution out of 181.
31 Available infrastructural facilities FacilitiesAvailableRequired No. of Veterinary Hospitals12 No. of Veterinary Dispensary1619 Mobile Veterinary Centre115 Artificial Insemination CentreNA16 Diagnostic CentreNA1
32 Dispensary / hospital to be equipped with estimated cost YearNo. of dispensary/hospital To be equipped Cost (In Lakh) Total21714
33 Expenditure of different programmes under Animal husbandry Components Total Total Financial requirement (Non- recurring and recurring) on door step Veterinary Service Financial requirement for door to door Vaccination Disposal of Carcass Poultry Farm Strengthening the Animal Husbandry Department with some activities Total
34 Product wise no. of SSI Units in the District Category of Industry Nos. of Industries Investment (Rs. In lakh) Nos of Employment Agriculture Based wood base General Total
35 Action Plans for K.V.I Programmes during XI Plan (Rs. In lakh) ProgrammeUnit cost No. of Beneficiary Target Total Phy.FinPhy.FinPhy.FinPhy.FinPhy.Fin Bamboo based Industries Furniture Soap/Detergent Gate/Grill Organic manure/Vermi Compost Total
36 Financial requirement for the development of Food Processing Units (phy. in No. & fin. Rs. In Lakh) SchemeUnit Cost (Rs. In Lakh) Total Phy.Fin.Phy.Fin.Phy.Fin.Phy.Fin.Phy.Fin. Bakery Chura Mill Rice Mill Flour Mill Oil Mill Milk Processing Unit Pulse Mill Vegetable based processing units processing units including tomato & Chilli Pickles & Murabba Total
37 Physical & Financial requirement for the Agricultural Marketing Year Marketing Infrastructure Rural HatsOFPPC PhyFinPhyFin total
38 Total Financial requirement for Horticulture development Name of theFinancial requirement (Rs. In Lakh) programme Total Planting materials for fruit crops Quality seed of vegetable crops Potato Total
39 Financial Requirement for Agricultural Sector (Rs. In Lakh) Sector Total Soil Health Management Water conservation Water Resource Management (Drip & Sprinkler Irrigation) Various activities under crop protection Farm Mechanization Enhancement of crop productivity & intensity Financial requirement for the seeds plan Transfer of technology Total
40 Financial Requirement for Allied Agricultural Sector (Rs. In Lakh) Sector Total Horticulture Animal Husbandry Fisheries Social Forestry Food Processing Unit Development of Rural Industries Agriculture Marketing Total
41 Total Financial Requirement for Agriculture and Allied Sector YearAgricultureAllied agriculture Total Rs. In Lakh
42