Stakeholder Consultation Workshop on the draft implementing rule for Air-Ground Voice Channel Spacing II (below FL 195) 6th May 2011, Brussels, EUROCONTROL.

Slides:



Advertisements
Similar presentations
Role , Responsibility and achievements of SARI 145 Working Group
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
1 Welcome Summary - First visit Karachi Integra A/S Independent consultancy company Headquarter located in Copenhagen, Denmark Working worldwide.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
05 July 2007Cologne NPA WG66.009: Type and Group Ratings Juan Anton.
Air Traffic Management activities in ETSI Jørgen Friis Deputy Director-General DOCUMENT #:GSC13-GRSC6-23r1 FOR:Presentation SOURCE:Jørgen Friis AGENDA.
Overview of the interoperability Regulation
The Single European Sky ATM Research (SESAR) initiative
Presentation to ADQ Implementation Workshop
European Single Sky ImPlementation ESSIP DEVELOPMENTS Reference: SCG/10/AP05 – Action Paper 05 Christian Coëffé Head of European Single Sky Implementation.
The European Organisation for the Safety of Air Navigation DQR – Roles and Responsibilities DAL/DQR Workshop Brussels, February 2013 Presented by:
Marc Deboeck ADQ Implementation Workshop 29 May 2013 Directorate Single Sky (SES) Support to CAA-NSA Single Sky Implementation Support to NSAs.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
Transport Revised Performance and Charging Regulations Key changes.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
ETSI STF293: Proposed groups of Community Specifications for the EATMN CNS/ATM Steering Group 11/12 October 2005 K.-D. Ehrhardt.
SINGLE EUROPEAN SKY ACAC Tripoli 3-4 November 2008.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
27/08/2015 Intelligent Transport Services ETSI activities 1GSC-9, Seoul SOURCE:ETSI (ERM TG#37) TITLE:Intelligent Transport Services – ETSI activities.
SESAR Single European Sky Air traffic management Research
| 1 European maritime transport space without barriers ECASBA Brussels Seminar May 2009 European maritime transport space without barriers Patrick.
EASA & UAS Airworthiness Policy – Presented at the Military Airworthiness Harmonisation Workshop, Olomouc, 5 June 2009 EASA & UAS AIRWORTHINESS POLICY.
Regulatory matters è The newly created European Aviation Safety Agency (EASA) is harmonising most regulations in aviation across Europe: è Licensing è.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
David Bowen Head of ATM Operations and Systems
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT SWIM-SUIT Public launch Rome 23 April 2007 Morten JENSEN European Commission.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
IAOPA Europe 112 th Regional Meeting Brussels 9 April 2005 Martin Robinson.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 4 : Separation of Functions Responsibilities.
The European Organisation for the Safety of Air Navigation SES Implementing rules on surveillance EBAA, CNS/ATM AG 6, Brussels. 17 th November 2010 Presented.
European Aviation Safety Agency Head of Aircraft Product Certification
Ensuring the Safety of Future Developments
Air Traffic Management activities in ETSI Jørgen Friis Deputy Director-General DOCUMENT #:GSC13-GRSC6-23 FOR:Presentation SOURCE:Jørgen Friis AGENDA ITEM:4.5.
8 June 2006Portland, Oregon, USAE. Sivel EASA Working Group on regulation of non-complex motor aircraft engaged in non-commercial operations E Sivel (EASA)
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Why we need 8,33KHz below FL195? Regulation (EU) No 1079/2012 on VCS-8.33 kHz Bogdan Petricel / Jacky Pouzet Network Manager Luxembourg, March 2015.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision CERTIFICATION PROCESS  Peter Stastny,
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision OVERVIEW OF THE SINGLE EUROPEAN SKY Roderick.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision SAFETY ASPECTS SAFETY ASPECTS  Juan Vázquez,
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
Juan Vázquez Sanz EUROCONTROL SRU
High Level Group on the Single European Sky
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Co-operating with the European Aviation safety Agency
PRESENTATION OF MONTENEGRO
Eighth UK European ATM Stakeholders Forum 24th April 2006
Agenda 5.11 General Regulations
Marine Strategy Framework Directive (MSFD)
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
Institutional changes The role of Bilateral Oversight Boards
Sharon Mahony Environment Unit
Marine Strategy Framework Directive (MSFD)
DG Environment, Unit D.2 Marine Environment and Water Industry
The ATM Standardisation Coordination Group
Item 6 of the Agenda Balance of Payments Working Group 2-3 April 2012
EASA ATM/ANS regulatory update
Meeting Of The European Directors of Social Statistics
Presentation transcript:

Stakeholder Consultation Workshop on the draft implementing rule for Air-Ground Voice Channel Spacing II (below FL 195) 6th May 2011, Brussels, EUROCONTROL

Agenda Item 1: Welcome and Introduction Workshop Objectives Eivan CERASI Acting Head of SES Unit EUROCONTROL

AGENDA 09h00 Registration 09h30 Welcome and Introduction Presentation of the Workshop Objectives Eivan CERASI (Acting Head of SES Unit) 09h45 Presentation on the SES Interoperability Eduardo MORERE-MOLINERO (European Commission) 10h00 Results of the consultation on the draft IR for VCS II 8.33 kHz Main comments and draft responses Discussions Octavian CIOARA (SES Unit) 10h30 Coffee Break 11h00 12h30 Lunch 13h30 Results of the consultation on draft IR for VCS II 8.33 kHz 15h00 15h30 End of Workshop Way ahead Next steps

Draft Implementing Rules SES Implementing Rules Setting the scene… (1/4) Stakeholders : States, Service Providers, Airspace Users, Industry, etc. ENPRM Formal Consultation SES Mandates Draft Implementing Rules SES Implementing Rules Enforcement by EU States Single Sky Committee, Industry Consultation Body European Commission <=> Single Sky Committee European Commission

Setting the scene… (2/4) Preliminary Impact Assessment Drafting Phase Formal Consultation Review of Comments Preliminary Impact Assessment Regulatory Approach Full Impact Assessment Development of draft Rule Public consultation (2-6 months) Summary of Responses Amendment of draft Rule Adoption/Approval Publication

8.33 Setting the scene… (3/4) VCS Mandate issued in 2005 “first step” mentioned in Recital 5 of 1265/2007 11 March 2009: ICB IoP Sub Group recommended extension below FL195 October 2010: Acceptance by the EC of the Regulatory Approach Draft IR developed and submitted to a formal consultation 2.02. – 8.04.2011 Network Management Functions IR voted by the SSC - 15.02.2011 – includes coordination of radio frequencies 8.33 Mandate to Eurocontrol still “open” No specific Flight Level in the mandate 11 March 2009 - the ICB IoP Sub Group - recommended to develop an IR to extend the air-ground voice channel spacing (8.33 kHz) below FL195

Setting the scene… (4/4) Several rounds of consultations on the subject involving wide range of stakeholders (Regulators, ANSPs, Airspace Users, Military, General Aviation, etc): Regulatory approach – written consultation with the Program Steering Group (PSG), Stakeholder Consultation Group (SCG) and Civil-Military Interface Standing Committee (CMIC) Draft IR – Dedicated session and written consultation with the PSG, in the period preceding the formal consultation Mandate to Eurocontrol still “open” No specific Flight Level in the mandate 11 March 2009 - the ICB IoP Sub Group - recommended to develop an IR to extend the air-ground voice channel spacing (8.33 kHz) below FL195

Objective of the workshop Present the results of the consultation Present the major comments received and the proposed EUROCONTROL responses Indicate the way EUROCONTROL intends to update the IR text (and associated material) However: No new comments No “real-time” drafting session Mandate to Eurocontrol still “open” No specific Flight Level in the mandate 11 March 2009 - the ICB IoP Sub Group - recommended to develop an IR to extend the air-ground voice channel spacing (8.33 kHz) below FL195

Agenda Item 2: SES Interoperability Eduardo MORERE-MOLINERO European Commission

The interoperability Regulation Eurocontrol, 6 May 2011 Eduardo MORERE MOLINERO European Commission

The interoperability Regulation (EC) N° 552/2004 as amended by Regulation (EC) N° 1070/2009 1 – Main provisions 2 – Implementing rules 3 – Community specifications

OBJECTIVES: Interoperability between the different systems and associated procedures of the European ATM network Coordinated introduction of new concepts of operation or technologies in ATM

SCOPE: Systems and procedures for Airspace management Air traffic flow management Air traffic services Communication, navigation and surveillance Aeronautical information services Use of meteorological information

REQUIREMENTS: Mandatory essential requirements Seamless operations Support for new concepts of operation Safety Civil-military coordination Environmental constraints Principles governing the logical architecture of systems Principles governing the construction of systems

CONFORMITY ASSESSMENT: Verification of systems EC declaration of verification of systems issued by the air navigation service provider Supervision of compliance by the national supervisory authority Alternative verification procedures can be developed by the European Aviation Safety Agency (EASA) in accordance with Regulation (EC) N° 216/2008 as amended

2- IMPLEMENTING RULES (I) Complement or refine the mandatory essential requirements Describe the specific conformity assessment procedures Mandatory Commission regulations

2- IMPLEMENTING RULES (II) 7 interoperability implementing rules drafted by Eurocontrol have already been adopted Commission Regulation (EC) N° 1265/2007 on air-ground voice channel spacing (above FL 195) Draft Commission Regulation on air-ground voice channel spacing (below FL 195)

3- COMMUNITY SPECIFICATIONS (CS) Formal means of compliance (publication of the reference in the Official Journal of the EU) European standards developed in cooperation with EUROCAE Eurocontrol specifications 8 references of CS already published in the Official Journal

Conclusions: Mandatory essential requirements may be complemented or refined by implementing rules Key role of implementing rules (Commission regulations) and Community specifications Draft Commission Regulation on air-ground voice channel spacing (below FL 195)

Agenda Item 3: Results of the consultation on the draft VCS II IR Octavian CIOARA SES Unit EUROCONTROL

Initial feedback 45 responses ≈130 detailed comments Main comments 13 acceptable without amendment 19 acceptable but could be improved 12 not acceptable but could be accepted if amended 1 not acceptable under any circumstances ≈130 detailed comments Main comments Impact on General Aviation Financial support Role of the Member States Type of conversions for the interim phase Exemptions for the radios operated by ANSPs

Initial feedback A B C D Total by Stakeholder Airport Operator (AO) 1 Civil Aviation Authority (CAA) 3 4 2 9 General Aviation (GA) 7 Military Authority (MOD) National Supervisory Authority (NSA) Other 6 Service Provider (ANSP) 16 Total Received Responses by Category 13 19 12 45 Legend: A = Acceptable without amendment B = Acceptable but would be improved with amendments C = Not acceptable but would be acceptable with amendments D = Not acceptable under any circumstances

Initial feedback

Initial feedback

Comments C - It was felt that the proposed draft has a major impact on General Aviation with no benefits for these users therefore any other alternatives reducing the impact should be considered. R - Several alternatives have been considered and only the deployment of 8.33 kHz will provide enough frequencies on medium and longer term at a reasonable overall cost. - It is acknowledged that the deployment of 8.33 kHz in the airspace below FL 195 (notably the widespread deployment expected in 2018) will have a significant impact on General Aviation with very limited benefits. - it is proposed to allow the Member States to take local measures and to grant exemptions having limited impact on the network. Appropriate information to be provided to the EC and to the NM. - the applicability of Article 1.6 extended to the entire draft IR.

Comments C - In was considered that in order to alleviate the financial burden on the General Aviation financial support was desirable. R - The content of the draft IR is limited by its legal basis: the SES interoperability Regulation. - The requirements allowing the Member States to take local measures and to grant exemptions from the carriage of 8.33 kHz radio will alleviate some of the financial pressure on the GA. C - Clarification was demanded with regard the scope of the draft IR and on the assignments exempted from conversions. R - Article 1 sets the subject matter and the scope of each implementing rule and all the subsequent articles shall be read and interpreted in the context of that scope defined in Article 1. - The assignments identified in Article 1.5 are outside the scope of the draft rule and the Article 3 will not apply to them. Not necessary to repeat across Article 3 the exemptions defines in Article 1.5.

Comments C - Explanations were required on the role of the Member States vis-à-vis the role of the Air Navigation Service Providers. R - A definition for “conversion” is proposed in the draft IR. It includes the coordination and publication in the ICAO-COM2 table, which is a State responsibility. Therefore the States will have the responsibility for conversions. - some of the requirements which in 1265/2007 were on ANSPs now are on Member States. C - Several comments asked for clarifications with regard the types of assignments to be converted in the interim phase. R - The ACC assignments are only used to derive a target figure. The target figure may be fulfilled by converting any assignment.

Comments C - Several questions were asked with regard the applicability dates of the regulatory provisions. R - The proposed dates were consulted with the Program Steering Group (PSG) , Stakeholder Consultation Group (SCG) and Civil-Military Interface Standing Committee (CMIC). They were selected so as to avoid a too serious frequency congestion and the entire business case is based on them. C - Clarifications were required on the exemptions applicable to the radios operated by the ANSPs. R - The success of the 8.33 kHz implementation is measured through the number of conversions. - in order to make a conversion, the radios operated by ANSPs need to be 8.33 kHz capable but the capability of the radio is not an objective in itself.

Comments C - The identification of the exemption indicator to be used for flight planning after 15.11.2012 is considered premature as its format has not been agreed yet. R - The requirement will be made more generic and will refer to an “appropriate indicator”. C - Enquiries were made on the applicability of the EUROCAE 23C R - No technical documents/solutions are referenced in the draft regulatory provisions as they will be left at the level of Means of Compliance. - the new EASA ETSO-2C169a already requires ED23C for new radios and the Certification Specification currently under development by EASA will be based on the provisions of the EUROCAE 23C.

Comments C - It is considered necessary to exclude air-to-air and the Search and Rescue frequencies from the scope of the draft IR. R - The proposed frequencies (123.45 MHz and 123.1 MHz) will be excluded from the scope of the draft IR. C - Questions were asked on the availability of new technologies making the deployment of 8.33 kHz unnecessary R - All proposed future technologies were analysed and none would be able to timely and cost-efficiently deliver the required future frequencies. - The current SESAR position is that the initial operation of a new voice communication system is expected circa 2030. Up to this time, voice communications will be supported by VHF

Comments C - It was felt that the proposed text creates confusion with regard the extent of the “user of voice communication system” and the associated responsibilities. R - to improve clarity by replacing “user of voice communication system” with the “user of radio” associated with an update of the definition for “radio” and the introduction of a new definition for “aircraft radio”. C - Several comments were made on the requirements extracted from the existing Regulation (EC) 1265/2007. R - As Regulation (EC) 1265/2007 will be repealed by the proposed text some of its provisions were transposed in the new draft IR amended where necessary to remove dates occurring in the past. - in principle the text originating from (EC) 1265/2007 was not changed as the provisions of this Regulation are already applicable.

Agenda Item 4: Way forward – the next steps Eivan CERASI Acting Head of SES Unit EUROCONTROL

Way forward Update of the draft IR to reflect accepted comments Update and completion of Final Report (draft IR, Justification Material, Summary of Responses) Delivery of the Final Report to the EC and availability on the EUROCONTROL Web-Site – June 2011 Not … but … of the EC approval process