Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.

Slides:



Advertisements
Similar presentations
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ILC Controls & Instrumentation R&D Activities at Fermilab G. Tassotto, M. Votava, M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, U.S.A.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
ESS DTL beam commissioning
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
Low Emittance RF Gun Developments for PAL-XFEL
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
F Project X Overview Dave McGinnis October 12, 2007.
Beam Instrumentation for Future High Intensity Hadron Accelerators at Fermilab Manfred Wendt Fermilab 8/25/2008HB2008 WG F: Diagnostics1.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Working Group F: Diagnostics and Instrumentation for High-Intense Beams – Summary – Manfred Wendt for the Working Group F contributors 8/29/2008HB2008.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Marc Ross T9 – Snowmass 2001 Closing Plenary T9 – Diagnostics M. Ross/R. Pasquinelli Thursday, July 19 RD: 1) determine mixing between z and x/y 2) determine.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Philip Burrows BDS Kick-off Meeting, SLAC, 13/10/071 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Mike Woods SLAC Thanks.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
ESS Front End diagnostic
Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.
Beam Commissioning Adam Bartnik.
ILC Beam Instrumentation – Introduction Remarks –
Experience with beam instrumentation at Linac4
Controls CBETA controls will extend existing EPICS control system
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Proton Beam Diagnostics
Diagnostics overview and FB for the XFEL bunch compressors
Considerations on Beam Diagnostics Physics
Diagnostics for the Injector
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
(Beam) Commissioning Plan
Presentation transcript:

Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009

Page 2 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Outline Scope and overview of Project X beam instrumentation systems A note to performance and system requirements Primary technical issues and the strategy to address them –Example: Real estate limitations in the MEBT –Examples of initiated / planned activities:  HINS temporary beam diagnostics  First beam studies at the proton source  e-Cloud measurements and beam studies in the Main Injector  e-beam scanner (planned) Goals of the plan by year Role of outside collaborators –Example: BNL Laserwire collaboration

Page 3 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt System Scope Beam Instrumentation and Diagnostics Systems Measure and characterize beam parameters (beam intensity, orbit, profiles/emittance, phase/timing, halo, etc.) for –Machine commissioning –Performance evaluation and improvements under various machine conditions, operating modes and a range(?) of beam parameters. –Detection and analysis of faults and error sources. Provide detection systems (BLMs, current monitors) for a fast Machine Protection System (MPS). Instrumentation hard-, firm- and software includes –EM and optical detection systems and control elements –Read-out, analysis and calibration systems –Infrastructure, cabling, timing and clock systems, DAQ interface

Page 4 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Overview of Beam Monitors BPM BLM Toroid Laser wire SEM / Slit Wirescanner Screen Monitor Fast F-Cup Long. Fiberlaser e-beam scanner e-Cloud IPM Other Monitors Injector GHz Linac Transport Line Recycler (Inj) Main Injector222 TOTAL

Page 5 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt System Requirements Detailed requirements and specifications for beam instrumentation systems have NOT yet been established. Need to: –Requirements to be derived from beam dynamics and operations aspects (intensity ranges, resolution, precision, operating modes, etc.) –Define monitor technologies, e.g. button vs. cavity-style BPM in 1.3 GHz SCRF cryomodules –Exact location / layout / space / # of beam detector components. Space limitations: Optics / diagnostics balance (beam quality vs. diagn.) Establish a physical layout based on system installation numbers –Optimization / distribution of racks/crates vs. cabling, tunnel electronics(?) –Standardization of electronics hard- & software (e.g. VME/VXS, TCA,...) Specification of the Machine Protection System (with Controls) –Operating modes (long/short pulse), response times, detection elements

Page 6 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt (Technical) Issues Most technical issues on high-intensity beam instrumentation systems are have been addressed and resolved elsewhere, e.g. SNS, but also DESY FLASH (“cold” beam monitors). However: –Exact specifications and the conceptual design has to be worked out. –Limited real-estate in MEBT, SCRF spoke-resonator and cryo-modules. –Location / type of tr. profile monitors for emittance measurements. –Detection of tr. beam halo (vibrating wire, laser wire) and long. beam tails (mode-locked fiberlaser) to prevent beam losses. Need onsite development / experience with non-invasive beam diagnostics (laser wire, e-beam scanner) –Minimize radiation background, instrument survival. –Emittance / profile monitoring in the transport line! Infrastructure, integration, standardization, DAQ (Controls) –Synchronized time stamping of data, low-jitter (sub-ps) clock signals

Page 7 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt HINS MEBT Real Estate SNS MEBT Diagnostics: –6x BPMs –2x Beam current –5x Wire scanner –Diagnostics “Tank”  2x Multiwire / slit  Beamstopper  Mode-locked laser –3x BLM HINS MEBT

Page 8 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Technical Strategy Collect information –Workshop participation (HB, BIW, DIPAC, Care) information exchange –Visit of potential collaborators, e.g. SNS, BNL, LBNL, SLAC –Meetings, meetings, meetings,…(requirements & specifications!) –Review of specific instrumentation systems, e.g. HINS MEBT diagnostics, cryomodule BPMs, etc. Instrumentation RD&D targets (need beam!) –HINS H - front-end (various linac instrumentation) –Main Injector (e-cloud, e-beam scanner, IPM) –NML test accelerator (cryomodule BPMs) Develop, build and test mission critical beam instruments, e.g. –MEBT diagnostics (orbit, emittance & phase monitors) –“Cold” BPMs, phase pickups (1.3 GHz cryomodule, spoke-resonators) –Non-invasive beam instruments

Page 9 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Practical Activities HINS Temporary Diagnostics Water Cooled Beam Dump BPM Wire Scanners RFQ Toroid

Page 10 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt 1 st HINS Beam Measurements Beam 45 kV Protons 2-3 mA 100  s pulse 0.1 Hz Solenoids Up to 7.8 kG Trim Dipoles Up to 100 G

Page 11 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt e-Cloud Measurements Microwave transmission (phase velocity) measurement: –From plasma physics, microwaves travelling along a waveguide (vacuum chamber) –Phase shift due to a homogeneous plasma –Microwave dispersion relation: For an electron cloud is proportional to e density

Page 12 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Time Resolved Measurements Direct Phase e-Cloud Measurements –Mix the transmitted signal with the source and measure the baseband component. –The phase difference translates into a DC offset at the mixer output. –We can observe the development of the e-Cloud as the beam passes! –Data shown represents one machine turn (TbT time resolution).

Page 13 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt e-Beam Scanner e-beam gets deflected by the p-beam Defection depends on –e-beam energy and position –p-beam charge and distribution Electron Beam Proton Beam Electron Beam Proton Beam Electrons above Protons Electrons below Protons Electron Gun Electron Beam Position Detector Electron Beam Proton Beam SNS e-beam scanner, build by Russian collaborators

Page 14 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Goals and Timeline FY09 –Specifications & requirements –Conceptual layout of beam diagnostics. –Continue started / initiate new RD&D activities at HINS & MI. FY10 –Focus on mission critical RD&D projects, e.g. laserwire, e-beam scanner, e-Cloud, MEBT instrumentation, cold BPMs, read-out systems, beam loss monitoring, and more. FY11 –Finalize design and development activities. –Summarize operation experience on some prototypes (HINS, MI) FY12 –Freeze designs, overall system layout.

Page 15 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Collaborators Project X Collaboration Initiative (November 2008): –Interest on beam instrumentation collaboration projects from SNS, LBNL, and SLAC SNS –Various advanced diagnostics systems (broadband Faraday-cup, e- beam scanner, MEBT beam instrumentation, Allison scanner, etc.) –Support, information exchange, RD&D help, visits, reviews, etc., but no design or development activities LBNL –Collaboration on e-Cloud measurements –EOI on the development of a mode-locked fiber laser system for long. bunch profile measurements (also bunch tails). SLAC –Collaboration on a new, xTCA-based electronics platform (Controls).

Page 16 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt BNL Laserwire Collaboration BNL test: –750 keV H - beam –Faraday-cup e - detector

Page 17 AAC, February 3, 2009 – Project X Instrumentation, Manfred Wendt Summary A short overview of the Project X beam instrumentation systems, the related issues and a resolution strategy was presented. The exact requirements, specifications, and performance of beam instrumentation systems and diagnostics need still to be defined. A preliminary RD&D plan covers prototyping of various known and novel beam diagnostics. Emphasis is put on non-invasive beam detectors. Beam studies of prototypes will take place at the HINS and NML test facilities, and the Main Injector. Preliminary RD&D goals have been presented. LBNL, SNS, and SLAC have expressed interest to collaborate on various projects in advanced beam instrumentation and controls.