Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1.

Slides:



Advertisements
Similar presentations
15 Maintaining a Web Site Section 15.1 Identify Webmastering tasks Identify Web server maintenance techniques Describe the importance of backups Section.
Advertisements

Security Controls – What Works
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
6.1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Building Information Systems Chapter 13 VIDEO CASES Video Case 1: IBM: Business.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Software Project Transition Planning
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
Computers: Tools for an Information Age
Pertemuan 20 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Factors to be taken into account when designing ICT Security Policies
Chapter 23 Computerised accounting systems
Brief Overview of Data Processing of Afghanistan Household Listing, Pilot Census Results, Population and Housing Census and NRVA Survey Brief Overview.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Presented by Manager, MIS.  GRIDCo’s intentions for publishing an Acceptable Use Policy are not to impose restrictions that are contrary to GRIDCo’s.
Manual Data Processing of Census Data 2004 Population and Housing Census Statistics Sierra Leone Thekeka Moses Conteh Sierra Leone.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Introduction to Information System Development.
Systems Analysis and Design: The Big Picture
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Lesson 8-Information Security Process. Overview Introducing information security process. Conducting an assessment. Developing a policy. Implementing.
S/W Project Management
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Section Seven: Information Systems Security Note: All classified markings contained within this presentation are for training purposes only.
Operating System Utility Programs & Stand-alone utility Programs.
Part VII: Special Topics Introduction to Business 3e 18 Copyright © 2004 South-Western. All rights reserved. Using Information Technology.
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
15 Maintaining a Web Site Section 15.1 Identify Webmastering tasks Identify Web server maintenance techniques Describe the importance of backups Section.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section A 1.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
7 7 Chapter 7 The University Lab: Conceptual Design Database Systems: Design, Implementation, and Management 4th Edition Peter Rob & Carlos Coronel.
OCR Cambridge National ICT Mr Conti 10X 25 th April 2014.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
OBJECT ORIENTED SYSTEM ANALYSIS AND DESIGN. COURSE OUTLINE The world of the Information Systems Analyst Approaches to System Development The Analyst as.
OCTAVE-S on TradeSolution Inc.. Introduction Phase 1: Critical Assets and threats Phase 2: Critical IT Components Phase 3: Changes Required in current.
Copyright 2010, The World Bank Group. All Rights Reserved. ICT - a core management issue Part 1 Managing ICT resources Produced in Collaboration between.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Mapping Operations Section B 1.
Bharat Sharma Nepal POPULATION & HOUSING CENSUS OF NEPAL: AN EXPERIENCE OF OUTSOURCING REGIONAL WORKSHOP ON CENSUS DATA PROCESSING September, 2008.
8 8 Chapter 8 The University Lab: Conceptual Design Verification, Logical Design, and Implementation Database Systems: Design, Implementation, and Management.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Copyright 2010, The World Bank Group. All Rights Reserved. Principles, criteria and methods Part 2 Quality management Produced in Collaboration between.
Module 4: Systems Development Chapter 14: Design And Implementation.
CHAPTER 2 TYPES OF BUSINESS INFORMATION SYSTEM. INTRODUCTION Information System support business operations by processing data related to business operation.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Data Processing Section B.
Copyright ©2005 by South-Western, a division of Thomson Learning. All rights reserved Chapter 17 1 Information Management Systems MANAGEMENT Meeting and.
Copyright © 2007 Pearson Education Canada 23-1 Chapter 23: Using Advanced Skills.
Census Processing Baku Training Module.  Discuss:  Processing Strategies  Processing operations  Quality Assurance for processing  Technology Issues.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section A 1.
State of Georgia Release Management Training
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
Information System ‘Treasury-Client’ 2015 Treasury Committee, Ministry of Finance of the Republic of Kazakhstan.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Computing Strategies. A computing strategy should identify – the hardware, – the software, – Internet services, and – the network connectivity needed.
Security Issues and Ethics in Education Chapter 8 Brooke Blanscet, Morgan Chatman, Lynsey Turner, Bryan Howerton.
Learning Intention Security of Information. Why protect files? To prevent unauthorised access to confidential information To prevent virus/corruption.
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Configuration Control (Aliases: change control, change management )
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Principles of Information Systems Eighth Edition
Fundamentals of Information Systems, Sixth Edition
ICT meeting Business needs
LO2 - Be Able to Design IT Systems to Meet Business Needs
Chapter 11 Selecting the Best Alternative Design Strategy
Chapter 11 Selecting the Best Alternative Design Strategy
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1

Copyright 2010, The World Bank Group. All Rights Reserved. What is Data Processing? The set of operations that translates the information collected into a useful and timely set of statistical reports 2

Copyright 2010, The World Bank Group. All Rights Reserved. Data Processing Considerations Manual processing required Equipment to be used Supplies needed Decentralization Work flow Control procedures 3

Copyright 2010, The World Bank Group. All Rights Reserved. Data Processing Components Receipt and check-in of materials Manual editing and coding Data capture Computer editing Tabulating the data 4

Copyright 2010, The World Bank Group. All Rights Reserved. Manual versus Computer Processing Manual processing –Increases time and costs –Can introduce errors Computer processing –Knowledgeable IT staff –Sufficient equipment and infrastructure –Outsourcing management 5

Copyright 2010, The World Bank Group. All Rights Reserved. Centralized versus Decentralized Centralized –Uniform procedures –Better controls –Fewer IT staff needed Decentralized –By type of activity –Communication is important –More controls and staff needed 6

Copyright 2010, The World Bank Group. All Rights Reserved. Data Capture Method Choice Choice of data capture method affects questionnaire design, data collection, type of staff and budget Decision must be made during planning Review recent organizational experience Conduct equipment inventory Test any new technologies 7

Copyright 2010, The World Bank Group. All Rights Reserved. Outsourcing Data Capture Partial or complete solution –Involve leads from processing operations Buying rather than building technical expertise –Involve permanent staff for knowledge transfer –Incorporate outsourcing as one step in a technology adoption plan Loss of control of operation –Specify requirements, acceptable outputs, and complete documentation of the process 8

Copyright 2010, The World Bank Group. All Rights Reserved. Data Capture Controls Keyed data entry –Independent verification –Monitor operator statistics Scanning –Manual entry for rejected forms –Manual verification to check for false positives 9

Copyright 2010, The World Bank Group. All Rights Reserved. Selection of Software Packages Decide on the generalized software package(s) to be used for data processing If using existing software: –Latest version –Programming staff available If purchasing software –Evaluate ability to meet project’s needs, staff capability and cost –Hardware requirements and training 10

Copyright 2010, The World Bank Group. All Rights Reserved. Software Evaluation Questions 1.Fit for purpose? 2.Readily available? 3.How much programming required? 4.Staff familiarity with software? 5.Hardware requirements? 6.Complete documentation and support? 11

Copyright 2010, The World Bank Group. All Rights Reserved. Computer Hardware Evaluation System requirements Current inventory Procurement Support and maintenance 12

Copyright 2010, The World Bank Group. All Rights Reserved. Physical Environment Adequate space, seating, tables, cords and accessories Temperature and humidity controls Constant and steady power supply Physical and electronic security 13

Copyright 2010, The World Bank Group. All Rights Reserved. Data Processing Systems Test Procedures tested for clarity, completeness and effectiveness Use pre-test or test deck Poorly designed data processing operations can negatively impact budget, schedule and quality Testing should provide production and quality control statistics 14

Copyright 2010, The World Bank Group. All Rights Reserved. When to Start Developing Programs Tabulations (outputs) should be agreed upon when defining the project Tabulation programming can begin as soon as tables are defined Editing programs can begin as soon you have a final questionnaire Adjustments will be made with final data 15

Copyright 2010, The World Bank Group. All Rights Reserved. Physical Security Restrict access to unauthorized personnel Track laptops and external storage devices Password protection and antivirus Brief staff on physical security procedures 16

Copyright 2010, The World Bank Group. All Rights Reserved. Electronic Security Turn off internet, Bluetooth, functionality outside production programs Disable CD drive and ensure no usb ports are used Laptops and external media are scanned when they access the server The server administrator should set levels of access and monitor users 17

Copyright 2010, The World Bank Group. All Rights Reserved. Data Back Up Procedures Back up data regularly Store back up in remote location that is safe from temperature or humidity variations Determine back-up medium and procedures Rotate external back-ups every few days 18

Copyright 2010, The World Bank Group. All Rights Reserved. Data Processing System Documentation All data processing system design decisions All manual procedures including check-in, editing and coding Data capture, computer editing, coding and tabulation procedures and programs Quality control procedures and measures Budget, costs and staff by operation, including production statistics 19

Copyright 2010, The World Bank Group. All Rights Reserved. Section A Quiz 1.When do you develop tabulations? (a)After data capture and editing (b)After the questionnaire is finalized (c)When determining project deliverables 2.Why is it important to make data processing decisions during planning? 3.Which tends to be slower with more errors, manual or computer processing? 4.What two forms of security should your data processing operations have? 20