International Design Study for the Neutrino Factory The IDS-NF K. Long, 16 March, 2008.

Slides:



Advertisements
Similar presentations
J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Advertisements

Precision Neutrino Oscillation Measurements & the Neutrino Factory Scoping Study for a Future Accelerator Neutrino Complex – Discussion Meeting Steve Geer,
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Near detectors and systematics IDS-NF plenary meeting at TIFR, Mumbai October 13, 2009 Walter Winter Universität Würzburg TexPoint fonts used in EMF: AAAAA.
Neutrino Oscillation Physics at a Neutrino Factory Rob Edgecock RAL/CERN-AB.
Near Detector Working Group for ISS Neutrino Factory Scoping Study Meeting 24 January 2006 Paul Soler University of Glasgow/RAL.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
Is B s 0 production by neutrino interactions interesting? Presented at the Super-B factory workshop as an alternative approach Nickolas Solomey 21 April.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Segmented magnetised detectors Anselmo Cervera Villanueva Universidad de Valencia ISS meeting RAL (UK) 25/04/06 RAL (UK) 25/04/06.
International Muon Ionization Cooling Experiment Edward McKigney Imperial College RAL March 25, 2002 Physics Motivation and Cooling Introduction.
3+1 sterile Jacobo López–Pavón IFT UAM/CSIC NuFact IIT, Chicago, July
F.Sanchez (UAB/IFAE)ISS Meeting, Detector Parallel Meeting. Jan 2006 Low Energy Neutrino Interactions & Near Detectors F.Sánchez Universitat Autònoma de.
Basic Measurements: What do we want to measure? Prof. Robin D. Erbacher University of California, Davis References: R. Fernow, Introduction to Experimental.
Preliminary Ideas for a Near Detector at a Neutrino Factory Neutrino Factory Scoping Study Meeting 23 September 2005 Paul Soler University of Glasgow/RAL.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
Study of two pion channel from photoproduction on the deuteron Lewis Graham Proposal Phys 745 Class May 6, 2009.
Summary Near Detector at IDS Meeting in FNAL EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Near Detector at a Neutrino Factory Chuzenji Lake, Nikko, Japan. 10 November 2005 Paul Soler University of Glasgow/RAL.
Summary Detector Working Group Neutrino Factory International Design Study Meeting 17 January 2008 Paul Soler.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
R. Tsenov, 4 August, 2011 Slide 1/30 Beam monitoring and Near detector requirements for a Neutrino factory or long baseline beams R. Tsenov, 4 August,
Neutrino Factories Andrea Donini Instituto de Física Teórica/Instituto de Física Corpuscular CSIC European Strategy for Neutrino Oscillation Physics -
Near Detector Report International Scoping Study Detector Meeting 4 July 2006 Paul Soler University of Glasgow.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
Near Detector Flux and R&D Near Detector Flux and R&D International Scoping Study Meeting 27 April 2005 Paul Soler University of Glasgow.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
International Design Study for the Neutrino Factory The IDS-NF K. Long, 8 th April 2008.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Contents of IDR: PPEG IDS-NF plenary meeting RAL, UK September 22-25, 2010 Walter Winter Universität Würzburg TexPoint fonts used in EMF: AAAAA A A A.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
General motivation S. Geer, K. Long Charge: (July collaboration meeting) Neutrinos and our lives (PR motivation) Neutrino oscillation and the role of NuFact.
Optimization of a neutrino factory for non-standard neutrino interactions IDS plenary meeting RAL, United Kingdom January 16-17, 2008 Walter Winter Universität.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Detector possibilities: scintillator based detectors EUCARD 1 st Annual Meeting, RAL, 13 April 2010 Paul Soler.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Michel Gonin – Ecole Polytechnique – France : SUPER NOVA SN1987A Super-Kamiokande Introduction neutrino oscillations mixing matrices Introduction.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
Status and oscillation results of the OPERA experiment Florian Brunet LAPP - Annecy 24th Rencontres de Blois 29/05/2012.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
A New Upper Limit for the Tau-Neutrino Magnetic Moment Reinhard Schwienhorst      ee ee
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
Optimization of a neutrino factory for large  13 Golden 07 IFIC, Valencia June 28, 2007 Walter Winter Universität Würzburg.
MIND Systematic Errors EuroNu Meeting, RAL 18 January 2010 Paul Soler.
Detector: Status and Plans 6 th IDS-NF Meeting, RAL, 22 September 2010 Paul Soler.
Near Detector Tasks EuroNu Meeting, CERN 26 March 2009 Paul Soler.
T2K Experiment Results & Prospects Alfons Weber University of Oxford & STFC/RAL For the T2K Collaboration.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
Neutrino factory near detector simulation
Physics and Performance Evaluation Group: Status and plans
Detector Baseline EuroNu Meeting, RAL 20 January 2010 Paul Soler.
A LARGE ATMOSPHERIC NEUTRINO DETECTOR USING RESISTIVE PLATE CHAMBERS
Neutrino Oscillation Physics with a Neutrino Factory
Next steps, organisation, discussion
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

International Design Study for the Neutrino Factory The IDS-NF K. Long, 16 March, 2008

Contents ► Motivation ► Bringing the ISS to a conclusion ► The International Design Study of the Neutrino Factory ► Conclusion

Motivation: neutrinos oscillate

Fundamental breakthrough? ► Neutrino oscillations indicate Standard Model (SM) is incomplete, but, is this a fundamental breakthrough?  Can accommodate neutrino oscillations in SM: Motivation

Fundamental questions ► Origin of mass:  And why is neutrino mass is so small ► Why is there no antimatter:  And can leptonic CP violation make a decisive contribution ► Did neutrinos play a role in:  Inflation?  Galaxy formation? ► Unification of matter and force:  Do the differences between the quark and lepton properties hold the key? Motivation

Theoretical speculations ► Grand-unified (vertical) symmetry  Relate quarks and leptons ► Family (horizontal) symmetry  Relate fermions across generations ► Supersymmetry:  Heavy Majorana neutrinos  See-saw mechanism ► Light neutrinos ► Large neutrino mixing angles Motivation

The experimentalists’ contribution ► Search for leptonic CP violation ► Determine mass hierarchy ► Measure mixing parameters with a precision sufficient to guide theoretical speculation  Or, better, determine structure of theory ► Standard Model itself established in this way ► Seek to:  Determine neutrino-mixing parameters with a precision approaching that of the quark-mixing parameters ► Ultimate theory must unify quarks and leptons Motivation

Quark-lepton relationship – example ISS 2006 Motivation

► Define: ► Precision evaluated assuming: Quark-lepton relationship – example Motivation

Timescale ► Emerging consensus:  A programme of high statistics, high precision, measurements of neutrino oscillations is required to follow T2K and NOvA;  The decision point is likely to be around 2012: ► Explicit in the C.E.R.N. Strategy Group statement; ► Endorsed by EPP2010 ► Not quite a consensus on what will constitute the programme:  Opportunity: ► Make Neutrino Factory an option on this timescale Motivation

Timescale: ► Are we slipping? ► ISS conceived as a step on the way:  A one-year programme to lay the foundation for a more in-depth design study to follow … ► The IDS-NF:  Goal: to produce a ‘Reference Design Report’ for the Neutrino Factory by 2012: ► The RDR is conceived as the document that will allow the ‘decision makers’ to consider initiating the Neutrino Factory project  The IDS-NF, therefore, differs from the ISS in that the emphasis will increasingly be placed on the engineering in order to: ► Demonstrate the technical feasibility of the various systems; and ► Evaluate the cost of the facility at the 30—50% level Motivation

Bringing the ISS to a conclusion ► Seeking to publish:  Physics report in Rep. Prog. Phys.  Accelerator and Detector reports in NIM A ► Executive summary:  10-pager: written by PJD; with ISS Programme Committee for comments

► The ISS:  Made the case for the high-sensitivity programme of neutrino-oscillation measurement  Demonstrated the need to evaluate the performance of cost of the various facilities, and the Neutrino Factory in particular, on the timescale of 2012  Demonstrated need for combined approach, optimising accelerator and detector together  Developed an internationally agreed baseline for the Neutrino Factory accelerator complex  Developed an internationally agreed baseline for the Neutrino Factory neutrino-detection systems ► This is the launch point for the IDS-NF ISS outcomes Concluding the ISS

The IDS-NF ► WWW page for communication:  ► Meetings to date:  CERN: 29–31Mar07: initial ISS → IDS-NF transition meeting  RAL: 16 – 17Jan08: Plenary meeting #1 …  FNAL: 10–12Jun08: Plenary meeting #2

IDS-NF plenary #1: achievements: ► Agreed first version of the IDS-NF baseline:  See ► Also, agreed work plan for period to NuFact08, Valencia, 30Jun—05Jul  See (for example) ► IDS-NF starting (albeit a little slowly) The IDS-NF

Accelerator baseline The IDS-NF

Accelerator baseline

Detector baseline ► Two baselines:  3000 – 5000 km  7000 – 8000 km ► Magnetised Iron Neutrino Detector (MIND) at each location ► Magnetised Emulsion Cloud Chamber at intermediate baseline for tau detection The IDS-NF

Detector baseline The IDS-NF

Performance of baseline Neutrino Factory The IDS-NF

IDS-NF: the next steps: Accelerator working group ► Proton driver:  Lattice design and simulation for proton driver ► Description of the facility ► Target:  Analysis of MERIT data: ► To determine maximum length of bunch train  Start on consideration of target infrastructure ► Front end:  Review impact of interaction of magnetic field and accelerating gradient with a view to reviewing layout;  Revise baseline cooling-channel design if required ► Acceleration:  Definition of lattice for normal and superconducting linac, RLAs ► Tracking through portions of lattice to determine output distributions  Definition of lattice for non-scaling FFAG ► Tracking to study output distortion and to analyse emittance growth ► Storage ring:  Study of transfer lines and tracking in idealised lattice to study emittance growth, losses, and fluxes The IDS-NF S.Berghttp://

IDS-NF: the next steps: Detector working group ► Work towards full simulation/reconstruction of MIND:  Goals: ► For E ν < 10 GeV demonstrate:  Backgrounds below  Efficiency can be increased with respect to present analysis  Determine: ► Signal and background efficiencies as a function of energy ► Energy resolution as a function of energy  Begin optimisation: ► Identify key parameters  Initial study of pattern recognition for muon identification  Include full set of physics processes: ► Quasi-elastic, resonance production The IDS-NF

24 Neutrino Factory International Design Study Meeting RAL 17 January 2008 Beam Diagnostics and Near Detector aims o Beam diagnostics (needed for flux measurement) –Number of muon decays –Measurement of divergence –Measurement of Muon polarization o Near detector measurements needed for neutrino oscillation systematics: –Flux control for the long baseline search. –Measurement of charm background –Cross-section measurements: DIS, QES, RES scattering o Other near detector neutrino physics (electroweak and QCD): –sin 2  W -  sin 2  W ~ –Unpolarised Parton Distribution Functions, nuclear effects –Polarised Parton Distribution Functions – polarised target –Lambda (  ) polarisation –  S from xF 3 -  S ~0.003 _ –Charm production: |V cd | and |V cs |, CP violation from D 0 / D 0 mixing –Beyond SM searches –…

25 Neutrino Factory International Design Study Meeting RAL 17 January 2008 Near Detector Conclusions o Near Detector considerations: optimisation design –Vertex detector: Choice of Pixels; eg. Hybrid pixels, Monolithic Active Pixels (MAPS), DEPFET; or silicon strips –Tracker: scintillating fibres, gaseous trackers (TPC, Drift chambers, …) –Other sub-detectors: PID, muon ID, calorimeter, … o Tasks: –Simulation of near detector and optimisation of layout: could benefit from common software framework for Far Detector –Flux determination with inverse muon decays, etc. –Analysis of charm using near detector –Determination of systematic error from near/far extrapolation –Expectation of cross-section measurements –Test beam activities to validate technology (eg. vertex detectors) –Construction of beam diagnostic prototypes –Other physics studies: PDFs, etc. (engage with theory community for interesting measurements)

IDS-NF: the next steps: Physics & Performance Eval. Grp. ► IDS baseline:  Recompute performance plots for new baseline  Figures for other parameters (such as θ 23 ) ► Specific physics questions concerning the IDS baseline setup:  Review physics case for the silver channel  Physics case for a higher muon energy (such as from NSI)  Detector mass/useful muon decay splitting between shorter and longer baseline?  Useful muon decay splitting between neutrinos/antineutrinos?  Simultaneous two-baseline optimization for the IDS-NF baseline setup  What is the reason for the worse CPV sensitivity for large θ 13 compared to earlier setups?  Detailed study of systematics The IDS-NF A.Donini, P.Huber, S.Pascoli, W.Winter

Conclusions ► Closing out the ISS:  Publish the reports and the Executive Summary ► The IDS-NF has started:  The ISS baseline has been adopted by the IDS- NF  First steps along the work plan have been defined ► There is a lot to do:  Carry out the first steps  Make it possible for others to join the effort  Lay the foundations for the crucial engineering work FNAL: 10–12Jun08: Plenary meeting #2