ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.

Slides:



Advertisements
Similar presentations
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Advertisements

New Nuclear Plants in the United States
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
New Reactor Activities Joseph Colaccino, Senior Project Manager Division of New Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Cumulative Impacts James Slider November 7, 2013.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
Nuclear Energy in 2013: Status and Outlook Briefing for Czech Technical University Scott Peterson, Senior Vice President Nuclear Energy Institute March.
Nuclear Energy: Safety, Radiological Protection and Physical Security in the post-carbon era (Energía Nuclear: Seguridad, Protección Radiológica y Seguridad.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
New Reactor Construction Inspection
Enhancements to the NRC Allegation Program Technical Session: NRC/Industry Response to Security Inattentiveness Concerns Lisamarie L. Jarriel Agency Allegation.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
NRC’s Category 3 Source Security and Accountability Initiatives
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Nuclear Power Update for The Society of American Military Engineers
NRC Cyber Security Regulatory Overview
Communication and Consultation with Interested Parties by the RB
Adding Nuclear Power to the Grid
Decommissioning Rulemaking
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Anna Bradford, Deputy Director Division of New Reactor Licensing
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s Office of New Reactors November 7, 2013

Agenda and Background Agenda New Reactor Designs/applications in the USA Quick construction status – Vogtle and Summer AP1000s 10 CFR Part 52 - combined licenses and certified designs Lessons learned from a regulatory perspective Background Combined license – NRC authorization to construct and operate a nuclear power plant in accordance with applicable laws, regulations, and conditions Latest version of Westinghouse’s AP1000 standard design certified in December 2011 SNC, et al, received combined licenses for Vogtle Units 3 and 4 on February 10, 2012 SCE&G, et al, received combined licenses for Summer Units 2 and 3 on March 30, 2012 First Nuclear Concrete (FNC) for Summer Unit 2 poured 9 – 11 March 2013 (4 November for Unit 3) FNC for Vogtle Unit 3 poured 12 – 14 March 2013 Continuing civil works, module fabrication and shipping, and large component deliveries 4 AP1000s under construction in China (Sanmen and Haiyang sites commenced in 2008) – cooperation with China bilaterally and multilaterally AP1000 design reviewed/under review in Canada, China, and the U.K. (MDEP) AP1000 being marketed in Czech Republic, India and other countries 2

New Reactor Applications Under Review – Large LWRs + 3 ABWR AP1000 EPR ESBWR USAPWR + Large LWRs-- Large Light-Water Reactors, generally of the order of 1000 MW(e) or more

Construction Status Vogtle Vogtle Unit 3 4

Construction Status Vogtle Vogtle Unit 3 5

Part 52 - Fitting the Pieces Together 6 Licensing decisions finalized before major construction begins Inspections w/ITAAC (Inspections, Tests, Analyses, and Acceptance Criteria) to verify construction Limited work may be authorized before COL issuance Pre-Construction Construction Verification Early Site Permit Standard Design Certification Combined License Review, Hearing, and Decision Verification of Regulations with ITAAC Reactor Operation Decision Optional Pre-Application Review LWA

Lessons Learned in COL Reviews First implementation of NRC’s 10 CFR Part 52 processes to issue COLs Bipartisan Policy Center Report (April 6, 2010) Thorough and timely evaluation of license applications…however, there were expected problems in navigating the new processes The Commission should ensure the lessons learned are rigorously applied to make the processing of subsequent applications more efficient NRC’s Lessons Learned Review Report – April 213 High quality applications with sufficient detail Timely development and maintenance of regulatory guidance Strong design standardization Early identification and timely resolution of complex issues Improve system of requests for additional information Concurrent reviews of design certifications and combined license applications Update to regulations incorporating lessons learned 7

8 Terminology - Current Licensing Basis Definition of Licensing Basis (10 CFR 54.3) Obligations (Regulations, License Conditions, Technical Specifications, Environmental Protection Plan, and ITAAC) Mandated Licensing Basis Documents (FSAR, QA, EP, Security Plan, etc.) Vogtle/Summer-FSAR: Summer — COL FSAR +Plant Specific DCD Vogtle — ESP SSAR + COL FSAR + Plant Specific DCD

9 FSAR Plant –Specific DCD Tier 1Tier 2Tier 2* COL FSAR E Plans QA Security Op Programs FFD ESP SSAR (Vogtle Only) E Plans Seismic Hydrology

Design Certification – AP1000 and COLs That Reference the AP1000 Design is Certified, i.e., incorporated into NRC regulations as 10 CFR Part 52 Appendix D Design is fixed at the detail of the Design Control Document Standard and process for imposing and seeking changes is high Rulemaking and the associated process is necessary to change Issues covered by the design certification are resolved issues and are not subject to contentions during the COL hearing process COL may depart from the certified design but must follow the change process identified in App. D Tier 1 information High level description of systems and drawings focused on safety aspects Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) For a COL to change – Exemption to Appendix D and amendment to COL needed Tier 2 information More detailed description of systems, structures, and components of the entire facility COL licensee may depart from Tier 2 but must evaluate in accordance with the change process (50.59 process). An LAR may or may not be required Tier 2* information Subset of Tier 2 information that, if desired to be changed, must be requested in a License Amendment Request (LAR) in accordance with the change process. Construction details (rebar design, etc.) 10

Experience post-COL Issuance First implementation of Part 52 processes (licensing basis maintenance) License amendment (LARs), and exemptions, and ASME code relief requests LARs are expected as design evolves and due to in-situ conditions Design changes to rebar (shear reinforcement details) Turbine building bracing Additional electrical penetration assemblies in the containment Inconsistencies between Tier 1 and Tier 2 Other Preliminary Amendment Request (PAR) Process Codified in license as an option for the licensee (following ISG-25) Flexibility in making physical changes while licensing basis change is udner review Tied to an LAR Obligation to construct in accordance with the licensing basis NRO is performing a self assessment of the experience during the first year of licensing Part 52 plants (with input from licensees, vendors, public, staff) 11

NRC SELF ASSESSMENT REVIEW 1 YEAR POST-COL ISSUANCE Highlights of July 2013 Report ML13196A403 Clarity of design control document (DCD) Tier 2* information could be enhanced Better Communications between regulator and licensee can enhance better decision making More effective interfaces on ITAAC Closure Notices NEI (endorsed by NRC regulatory guide 1.215) Nexus of the construction Reactor Oversight Process (cROP) with the vendor oversight program Monitor the current licensing basis change process to identify where additional process enhancements may be warranted NEI 96-07, Appendix C (not yet endorsed by the NRC) Preliminary Amendment Request (PAR) Process provides some flexibility Codified in license as an option for the licensee (following ISG-25) Flexibility in making physical changes while licensing basis change is under review Tied to an LAR Obligation to construct in accordance with the licensing basis 12

Summary First implementation of Part 52 regulations to issue COLs and for post-licensing processes Vogtle and Summer licenses issued and construction ongoing Experience gained in licensing pre and post COL issuance A learning experience for regulator and licensee Improvements can be made Assessments to inform improvements Philosophy of Part 52 – Standardization Importance of maintaining current licensing basis Managing changes appropriately Proper change processes Safety benefits ITAAC completion Safe operation 13OFFICIAL USE ONLY

10 CFR Part 52 QUESTIONS? 14

ACRONYMS CLB – current licensing basis COL – combined license DCD – design control document EP – emergency plan ESP – early site permit FFD – fitness for duty ITAAC – inspections, tests, analyses, and acceptance criteria LAR – license amendment request LWA – limited work authorization LWR – light water reactors SMR – small modular reactor SSAR – site safety analysis report UFSAR – updated final safety analysis report 15OFFICIAL USE ONLY