Project Management Methodology Project monitoring and control.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Monitoring and Controlling
Earned Value Project Management: a powerful tool for software projects
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
OPMA 5364 Project Management Part 6 Project Control
Chapter 10 Project Monitoring and Control
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
Project Management in Practice
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Understanding Earned Value Analysis
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Software Project Management (SPM)
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Stage III: Project Execution and Control Earned Value Analysis B: Chapter 8: pages B: Chapter 12: the entire chapter.
Team7 Team Assignment 2 Software Measurement and Analysis.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Project Cost Management
Presented by Tim Pyron Author: Que’s Special Edition Using Microsoft Project 2002 Que’s Special Edition Using Microsoft Project 2000 SAMS Teach Yourself.
Project Management Methodology
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
PMP Study Guide Chapter 11: Controlling Work Results.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Schedule Control (Earned Value)
DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P , Chapter 13 Process and performance Measurement and Evaluation, Project Management.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
CHAPTER:7 Project Cost Management
Earned Value Management
5. Cost resources & PLAN DURATION
Earned Value Management
Project Cost Management
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
5. Cost resources & PLAN DURATION
5. Project PLAN & cost estimation
Fine-Tuning your plan and obtaining approval
Monitoring and Controlling
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Project Management Methodology Project monitoring and control

What to control? Scope Resources Time Cost People Risks occurrence Communication plan implementation Quality

How to control? Apply specific technique of the project control for each subject Integrate project management processes with other IT processes Use Project Management tools

Scope monitoring and control At the planning stage the project scope was identified with the help of: Scope definition (in and out) Requirements Deliverables WBS

Scope Control Scope control involves controlling changes to the project scope Goals of scope control are to: Influence the factors that cause scope changes Assure changes are processed according to procedures developed as part of integrated change control Manage changes when they occur Variance is the difference between planned and actual performance. Control variances 5

The factors of scope change Time is shorter than planned Human resources not available Material resources shortage Requirements changed

Progress tracking Tracking is the process of comparing actual with plan Help to understand the project issues and justify requests for changes With actual in hands you will operate with facts Planned characteristics are recorded with the help of baseline

Baselines MS Project allow storing the project baseline Baseline should be stored first when the planning stage is completed It can be updated during the project implementation to reflect changes Baseline is a snapshot of: Tasks Resources Assignments

Tasks baseline For each task it will show planned characteristics of Duration Start and finish date Resources assigned Cost Dependencies

Use of baseline Planned data are used to calculate Critical Path Free and float slack Early and late start and finish date They also are used to monitor the project performance in terms of timeline and cost

Baseline options For entire project For selected tasks For a part of the project that starts from selected task

How to track Specify the work completed in % Use the Tracking Gantt table to record actual information Use other tables to see the project state from different perspectives

Using tables View – Table – Variance Show variances in task timing between baseline and actual View – Table – Work Show differences between baseline and actual work efforts View – Table – Cost Show differences in cost between baseline and actual

Cost control Project budget defined at the planning stage and recorded into the project plan creates the baseline To have the cost baseline established make sure that All tasks from WBS have assigned resources Work efforts are identified Rate or fixed cost data are provided Material resources and third-party services are counted

Cost control tools Earned value management This is a project performance measurement technique that integrates scope, time, and cost data. First thing is to track the WBS items in terms of how much work has been completed by the time of measurement, when the work started and ended, and how much it actually cost to do the work. Use tracking table to record actuals

Cost control tools You control project performance during some period of time. In other words you have a date as your checkpoint Normally this is the date of your reporting to the project monitoring committee For a given date, you calculate the values required to evaluate the cost performance You can set the date for MS Project thru the Project Information Window. Use The Status Date for this

Cost control tools You calculate the following values Planned value (PV). That is the budgeted cost for the work scheduled, also known as BCWS Earned Value (EV). That is the budgeted cost of work performed, also known as BCWP Actual cost (AC). That is about how much is spent during a monitoring period, in other words actual cost of work performed, aka ACWP

Cost control tools To calculate Earned Value you do the following: Calculate Rate of Performance (RP). RP is calculated as the ratio of actual work completed to the percentage of work planned to be completed. Calculate Earned Value (EV). To calculate the earned value we use the formula: The EV = PV to date * RP

Earned Value Earned value is a powerful metric used to evaluate the project cost performance Earned value is a measurement that indicates how much of the budget should have been spent in comparison to the cost of the work performed thus far Earned value is used for financial analysis known as Earned Value analysis

Earned Value analysis Your need other calculations involved into the cost control Cost Variance (CV) = EV – AC (earned value minus actual cost) CV shows your actual cost in comparison to the cost planned for the work performed If CV is negative it means that the cost is higher than planned. If CV is positive it means that the cost is lower than planned

Earned Value analysis Your need other calculations involved into the cost control Schedule variance (SV) = EV – PV (earned value minus planned value) SV shows the difference in the actual work efforts in comparison to planned efforts If SV is negative it means the work took longer than planned. If SV is positive it means that the work took shorter time than planned

Cost control tools Cost performance index (CPI) is the ratio of EV to AC. Used to estimated the projected cost of completing the project. If CPI = 1, the cost is as budgeted. If CPI 1, the cost is under budgeted. Schedule performance index (SPI) is the ratio of earned value to planned value. If SPI = 1 the project is on schedule. If SPI 1 the project is ahead of schedule

Cost control tools Estimate at completion (EAC) Used to estimate of what it will cost to complete the project based on performance today To calculate, use Budget at Completion (BAC) which is equal to planned budget EAC = BAC/CPI

Exercise Assume the following numbers: Status date is somewhat in the middle Planned works to be completed is 45% Actual work completed is 30% Planned cost is 55K Actual cost is 60K Project budget is 100K

Exercise Calculate the following: Rate of performance Earned value Cost variance Schedule variance Cost performance index Schedule performance index Estimate at completion