1 Rezwana Khan Director & COO Star Computer Systems Limited.

Slides:



Advertisements
Similar presentations
TestIstanbul Conferences 2012 TESTISTANBUL 2011 KEYNOTE SPEAKERS.
Advertisements

We ensure collaboration through a unique Moneyball-style approach to team assembly Agile Team, Custom-Designed for You Works well together Fits seamlessly.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Entrepreneurs. What is an Entrepreneur? An entrepreneur is someone who: Comes up with a good idea for a business Organises all the elements needed for.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
End to End Process Control for Total Operational Excellence Total Operational Excellence Conference 2012 Lis Mannes Friday August 24 th 2012.
Page 1 of 13 Challenges and Prospects Presentation on Value of having process driven organization & Its Challenges and prospects Mohammad Shahadat Hossain.
Enterprise 2.0: Agile Methods and an Enterprise Wiki
Marketing research and Marketing Planning at Nestle.
SOFTWARE QUALITY ASSURANCE Asst. Prof. Dr. Selim BAYRAKLI Maltepe University Faculty of Engineering SE 410.
Visit us at E mail: Tele:
XXEN Module Team # Team Members Names. Describe what it is like to be in the XXEN engineering major What are four topic areas in XXEN? – structures, water.
Introduction to Quality, Cost & Delivery
The ‘Results Culture’ in the Public Sector – An Overview Mr John Compton Chief Executive Down Lisburn Trust.
Unlocking the Value from Implementation & Delivery
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Agile & Lean Development Conference May 2014 Kevin J. Murphy Director of Engineering Automotive Solutions Division.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
The Multimedia Team. Careers in Multimedia u Executive Producer u Production Manager u Multimedia Director/Architect u Art Director u Interface Designer.
INSIGHTS FROM THE AUCKLAND MOTORWAY ALLIANCE 12 July 2013 Richard Steel Project Director, Beca Ltd.
Good corporate governance makes good business sense
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
Software Project Management Lecture # 7. Outline Project Scheduling.
Software Engineering Risk Management. Understanding Risks Risks involve :  Uncertainty – there are no 100% probable risks  Loss – if the risk becomes.
Testing Vs. Inspection Research Paper Diala T. Gammoh, Ph.D. Student Dr. Damla Turgut, Ph.D. University of Central Florida, Orlando Florida
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
C r e a t i n g S o l u t i o n s B u i l d i n g C a r e e r s 1 Professional Opportunities Orientation Program David Churchill Director of Project Management.
1 IT Zone Hi Tech Tuesday, February 13, 2002 Software Quality Assurance in the Real World Renee’ E. Jones QA Team Lead The MEDSTAT Group.
The Truth About Agile Software Development with Scrum - How to Manage Scrum Agile Software Development- The Facts You Should Know 1 Agile software development.
Copyright © 2006 Raytheon Company. All rights reserved. Customer Success Is Our Mission is a trademark of Raytheon Company. Harnessing the Benefits of.
Case Study Summary Challenges Link Translation has developed a partnership with Bombardier, the world's leading manufacturer of both planes and trains,
Architectural Compentency.  Business Success  How do you measure success ◦ backwards looking – derived from history? ◦ is it forward looking? – ability.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
N. Noorzadeh Director of Certificate of Origin Division.
1 Chapter 7- Cost Management Systems-ABC. M11-Chp-08-1-Cost-Mgt-Systems-ABC Summer, Edited May 23, Copyright © 2011, Dr. Howard Godfrey.
Planning Extreme programming
Process Maturity: Things that Work Barry Foster Director, Corporate Quality 4/18/2000 Barry Foster Director, Corporate Quality 4/18/2000.
Responsible for day-to-day management –All company restaurant kitchens Works with customer service teams –Assures customer satisfaction Responsible for.
Strategy Summary Steering Committee. Discussion Discussion around and adoption –Sharing test results –Shorten deployment time –Build use cases.
Projects, Programmes and Best Practice. Geoff Reiss.
THE BEST CONTACT CENTER INDONESIA 2016 INSTRUCTION This template should be used Only for The Best Operations category. Template can be modified, subject.
INTRODUCTION For effectively control the organizational activities, a large number of controlling techniques are available. They help to produce right.
L4 Certificate in Housing Practice
Game Design, Development, and Technology
Identify the Risk of Not Doing BA
CIO Forum Briefing 3rd November, 2015
9/18/2018 Department of Software Engineering and IT Engineering
Project Charter Template
Project Charter Template
GeoMesh Blockchain Networking - Slide Presentation
Public Employees Retirement Association Infrastructure Upgrade
GEOP 4355 Supply Networks: Supplier management
The best operations The Best Contact Center Indonesia 2018.
مدیریت استراتژيک منابع انسانی
Presentation on Value of having process driven organization & Its Challenges and prospects Review History: Ver# Prepared By Date Reviewed By.
Agile Delivery Process Improvement
By Jeff Burklo, Director
Case Study: Predictive ASM
SOFTWARE PLANNER LIFE CYCLE MANAGEMENT TOOL - PRIYANKA SHETTY.
Basics of ABC Costing.
4 Customer Service 1 Effortless Connected Proactive Mobile-ready
Ռազմավարական կառավարում
The Best Contact Center Indonesia 2019
IBM Empowering businesses to transform with blockchain
UBL Informationssysteme GmbH
ACCEPTED IN InnoEnergy
Skyline Bakery and Cafe
Computer Services Business challenge
Driving Employee Engagement by Measuring HR Service Delivery
Contact center INNOVATION
Presentation transcript:

1 Rezwana Khan Director & COO Star Computer Systems Limited

Challenges of Delivering Successful Projects Follow Simple Best Practice Benefits When & How to Get the Certification 2

Project Estimation Project Requirement/Scope Management Project plan/schedule management Managing engineering artifact (BRD/SRS/Coding Standard) Project Change Management (requirement, platform) Risk Management 3

Project Estimation Project Requirement/Scope Management Project plan/schedule management Managing engineering art effect (BRD/SRS/Coding Standard) Project Change Management (requirement, platform) Risk Management 4

Practice the above processes which have mentioned in the challenges Measure the step that has been taken (i.e. project management plan, risk management, engineering artifact management ) Analysis and resolution of above measurements Corrective action plan for improvement Continual improvement 5

Successful delivery on time, cost and quality Customer receives better value for their assignment IT company does not become person driven rather it becomes process driven Prepare your company to get international certification 6

Measure your company’s maturity level in quality practice Align your quality assurance team for the certification journey Budgetary allocation Time allocation 7

8