> AREVA NP GmbH - PELC 2006<. Challenging the collaboration issue in nuclear plant design PELC Conference The Hague June 7, 2006 Frank-Peter Ritsche Project.

Slides:



Advertisements
Similar presentations
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Advertisements

Plant Engineering Life Cycle Conference 2005; 11 April Dalip Sud The Application of ISO Part 4.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
MEP/CIC Jan. 12, 2001 NASA’s STEP for Aerospace Workshop Using STEP for Engineering, Fabrication and Construction of Industrial Facilities Mark Palmer.
ASME SMR ROADMAP (STP-NU-072)
Data Integration in Pulp and Paper Industry Timo Syrjänen PELC 2006, 7th June 2006 World Forum Convention Centre, The Hague.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
© EDF 2008 Future prospects for EDF’s human resources in nuclear Manchester University 26 March 2008.
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
ENTERPRISE SOFTWARE.
RBNetERP or Enterprise Resource Planning is a software that allows companies to integrate all their operations and resources and manage them through one.
Siemens PLM Software Overview 28 th of May 2008 Bulgaria Colin Johnson.
Building Information Modeling
GyanSys Contact: Phone: Simplified Document Management Faster, Better, Stronger Search Integration - Site Mailbox.
Module 3: Business Information Systems Enterprise Systems.
3rd Annual Energistics Standards Summit Standards – Benefits across Industries Michael Strathman Aspen Technology, Inc 23 October 2008.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
SUBTITLE TEXT. Optimal Solutions What is E- Business Suite Oracle E-Business Suite is the most comprehensive suite of integrated, global business applications.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
MAJOR BUSINESS INITIATIVES Gaining Competitive Advantage with IT
Fleet Performance and Reliability in Generation Utilities
Delcam Professional Services Antony Hall Business Development Manager Delcam plc.
12/02/04www.cis.ksu.edu/~meiyappa Enterprise Resource Planning Meiyappan Thandayuthapani CIS 764.
Plant Engineering Workbench 5.3 New Features. 2 Workbench 5.3 ▼ New Features in 5.3 are: –New 3D Model Management module –Additions to the Admin module.
Standard way of sharing product data for nuclear power plants in Korea April 11th, 2005 Soonhung Han Plant Engineering Life Cycle Conference.
Produced by: Integrated Asset Planning for Nuclear Power Plants Matt Kohal Southern California Edison.
Enterprise Resource Planning
Achieving Interoperability for Equipment Supply Chains Mark Palmer FIATECH AEX Project Leader National Institute of Standards and Technology.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Methodology for Information Strategy Planning for ERP By : Saleh A. Motawe Supervisor : Yassmen El bobo.
Process Industry Data Integration Strategies
Value and Supply Chain Management. What is Logistics? The Institute of Logistics defines logistics as the management of the flow of goods, information.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
AREVA: Steps towards a global leadership in the energy industry
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
1 Information Handover at UniStar Lessons Learned Presented By: Bob Renuart UniStar.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
New Reactor Construction Inspection
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
Manufacturing Plant maintenance Materials management Quality management.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
INTEGRATED APPROACH FOR STRUCTURAL ENGINEERING FROM CONCEPTUAL DESIGN TO FABRICATION SANJAY KUMAR ARORA MANAGER – CIVIL, PEM, BHARAT HEAVY ELECTRICALS.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Agile Enterprise Visualization Overview David Edwards, Product Marketing Manager.
ERP Components. Introduction ERP software is made up of many software components. Each component represents the major functional area of the organizations.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
1 Industry Specifications and their importance in Product Lifecycle Management (Dr Michael Day & Deborah Jane Ham) (September-2012)
EAsia Awards 2013 Project Name: National Products and Services Classification and Codification Islamic Republic of Iran.
2015 Global Shunt Reactor Industry Trends & Technology Source Research Report Published: Feb 2015 Single User License: US$ 2600 Corporate User License:
Chapter 11 Information Systems Within the Organization.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
KNOWLEDGE MANAGEMENT (KM) Session # 33. Corporate Intranet A Conceptual Model INTRANET Production Team— New Product Budget Director— New Product Knowledge.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
The Shipdex protocol ( ) Marco Vatteroni Director Shipdex author & technical manager  WHY  WHAT  HOW.
AREVA’s Reactor Projects: Building on Experience Kathy Williams, Chief Financial Officer AREVA Inc. July 29, 2014.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
Uniper Energy Services
Awareness program on ISO/TS16949:2002
International Advisory Council
Regulatory Control Training Workshop
What are the challenges our BRICS customers say they face in nuclear Industry?
Enterprise Resource Planning, 1st Edition by Mary Sumner
A Process View of the Supply Chain
The Developing O/O Lifecycle Engineering Information Lifecycle Market
I&C requirements and configuration management
Presentation transcript:

> AREVA NP GmbH - PELC 2006<

Challenging the collaboration issue in nuclear plant design PELC Conference The Hague June 7, 2006 Frank-Peter Ritsche Project Management Initiative / AREVA NP

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 3 The AREVA group AREVA NP AREVA NC shares 66% 34% 100% Key figures (2005) M EUR revenue employees AREVA is world leader in the energy business N°1 in the entire nuclear cycle N°3 in electricity transmission and distribution 100% AREVA T&D

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 4 Energy: our core business  Front End Division  Reactors and Services Division  Back End Division  Transmission and Distribution Division

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 5 AREVA NP – international matrix organization France USA reactorsservicefuelcomponents Germany

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 6 The EPR is an advanced evolutionary pressurized water reactor (PWR) designed by AREVA NP, an AREVA and Siemens company. Electric Output:1,600 MWe Reactor Power:4,300 to 4,500 MWt Design Life:60 years Fuel Type:Enriched (up to 5%) uranium and/ or mixed-oxide (MOX) EPR: the first-built generation III+ reactor More information on:

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 7 The EPR in Europe Flamanville 3 (France) First concrete:2007 Operation:2012 Olkiluoto 3 (Finland) First concrete:2005 Operation:2009 May 11, 2006: Installation of the 180 t bottom liner part

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 8 Equipment Engineering Piping Design Civil Engineering Heat, Ventilation Air Condition Electrical Design Instrumentation & Control Information Management in a project comprises ● Project Management ● Design Integration ● Engineering Material Supply Chain Plant Layout 3D-Model System Design Engineering DB Reporting Time Scheduling Commercial Management Document Management Information Management in New Plants Projects

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 9 Project Management considers the integration of time & resource information commercial information and scope, which in engineering is  documentation and  data Project reporting covers in addition  quality  risks Reporting Time Scheduling Commercial Management Document Management DOCUMENTUM Documentation Management DOCUMENTUM Documentation Management PRIMAVERA Enterprise P3E Time schedule PRIMAVERA Enterprise P3E Time schedule SAP Commercial Management SAP Commercial Management Time CostScope Information Management in New Plants Projects

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 10 Material Supply Chain Plant Layout 3D-Model System Design Engineering DB Design Integration in AREVA NP is achieved within Aveva‘s VANTAGE suite of Engineering tools VPE VPDVPRM Vantage VPE Systems Design database Vantage VPE Systems Design database Vantage VPD (PDMS) 3D Design Vantage VPD (PDMS) 3D Design Vantage VPRM Material Management Vantage VPRM Material Management Information Management in New Plants Projects

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 11 Equipment Engineering Piping Design Civil Engineering Heat, Ventilation Air Condition Electrical Design Instrumentation & Control Engineering within the specific disciplines is supported by specific design tools from market or in-house. DESY Electrical Design DESY Electrical Design TXP / ES680 Operational I&C Design TXP / ES680 Operational I&C Design PDMS Cable Trays PDMS Cable Trays PDMS HVAC Design PDMS HVAC Design Stress Calculation Fluiddyn. Calculations Support Calculation MDS Support Catalogue MDS Support Catalogue MDS Support Design MDS Support Design KADIS Cable Routing KADIS Cable Routing PDMS Civil Design PDMS Civil Design Information Management in New Plants Projects (examples)

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 12 Material Supply Chain Plant Layout 3D-Model System Design Engineering DB Reporting Time Scheduling Commercial Management Document Management Equipment Engineering Piping Design Civil Engineering Heat, Ventilation Air Condition Electrical Design Instrumentation & Control Material Supply Chain Plant Layout 3D-Model System Design Engineering DB Reporting Time Scheduling Commercial Managemen t Document Management Reporting Time Scheduling Commercial Management Document Management VPE VPRM VPD AREVA NP Information Management System Our partners are the world market leaders in their field

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 13 Today more than 200 Engineers in 5 different locations in France, Germany and Finland are designing simultaneously the EPR detailed plant layout in 3D Engineering Information Technology for the EPR

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 14 AREVA NP is taking full advantage of the complete and fully integrated VANTAGE suite of Aveva‘s tools VPE P&ID and VPE Workbench for process design PDMS (VPD) for 3D plant layout VPRM for material management MDS for detailed support design Model Manager e.g. for interfacing VPE and VPD Global for synchronizing the 3D around the globe Engineering Information Technology for the EPR

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 15 between projects between EPC and O/O oModularization of plant and Engineering „re-use“ oInformation/ Configuration Management across plants oHandover of „virtual plant“ into Owners system oConsider Owner/ Operators need for operation and maintenance oConsider plant life time (60 years) data maintainability Collaboration issues in nuclear plant design between tools oData management & configuration management between the modules of the IMS oInterfacing SAP, Primavera, Documentum, VPE, VPD, VPRM and design tools of specific disciplines between partners & suppliers oData exchange between consortium partners, architect engineers, key engineering contractors oData exchange between equipment suppliers (component data, operation & maintenance)

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 16 Collaboration with Partners - Examples Finland – turn-key consortium Nuclear Island: AREVA (Aveva-tools) Conventional Island: Siemens PG (Intergraph tools) Engineering contractor (Aveva-tools) Finland – turn-key consortium Nuclear Island: AREVA (Aveva-tools) Conventional Island: Siemens PG (Intergraph tools) Engineering contractor (Aveva-tools) France – contractor to EDF Project Leader: EDF NSSS: AREVA (Aveva and Owners tools) Engineering contractor (Aveva and Owners tools) France – contractor to EDF Project Leader: EDF NSSS: AREVA (Aveva and Owners tools) Engineering contractor (Aveva and Owners tools) US-EPR – joint venture *) Customer: Constellation Energy Project Leader: UniStar Nuclear (joint venture) AE/ Constructor: Bechtel (Intergraph/ Aveva) Nuclear Island: AREVA (Aveva-tools) US-EPR – joint venture *) Customer: Constellation Energy Project Leader: UniStar Nuclear (joint venture) AE/ Constructor: Bechtel (Intergraph/ Aveva) Nuclear Island: AREVA (Aveva-tools) China – local engineering **) Nuclear Island: AREVA (Aveva-tools) high local content: Chinese design institutes (Aveva-tools), manufacturers,... China – local engineering **) Nuclear Island: AREVA (Aveva-tools) high local content: Chinese design institutes (Aveva-tools), manufacturers,... Note *) – UniStar Nuclear has selected Bechtel as the AE-Constructor for the first four units of the U.S. EPR fleet Note **) – AREVA NP is currently negotiating for four « Generation 3 » reactors in China

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 17 Engineering Re-use VPEVPD VPRM Configuration Reference EPR Owner‘s tool VPD VPRM Configuration new EPR VPE VPD VPRM Configuration Waste treatment Re-use of complete original configuration for new project – Challenge: integration/ replacement of a different tool Modularization: Re-use of a part of the original configuration for new project – Challenge: structure of modularization to be considered in early design

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 18 Operation & Maintenance data Which information needs the Owner to operate & maintain the plant? In-Service-Inspections Non-Destructive Examination Weld management Equipment maintenance data Maintenance tasks Maintenance intervals Maintenance tools Lubricants & consumables Material management Spare parts Special tools Definition of welds in VPD Definition of Data/ data structure in VPRM Definition of Data/ data structure in VPRM Definition of equipment in VPE/ VPD AVEVA tools EPC data...and much more...  Involvement of equipment suppliers strongly required!

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 19 Information and Operation Management Since start of the EPR-project on Olkiluoto 3 site, AREVA NP implemented a fully integrated „Information Management System“ for Engineering and Project Management. The information generated by AREVA NP is being handed over to the Owner/ Operator in a continous process.

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 20 Enterprise Portals Enterprise Application, Process & Information Integration Material Management ERP DMS O&M Web-Portal O&M Data Integration DCS PI Inspection CMMS Other O&M Applications 3D Visualization Technical Data Hub Life Cycle Asset Management Solution – An Owners’ system Data Handover to the Owner/ Operator

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 21 Viewer Portal data repository intelligent documents intelligent documents 3D navigation XML EDB 1 EDB 2 3D 1 3D 2 O/O System EPC System format system app‘s Only data handover in a structured data model of neutral format provides maintainability of information beyond the life time of specific system applications over 60 years of plant operation Data Handover to the Owner/ Operator

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 22 Standardization of Data Handover Design Constr uct Comm iss. Operat e Servic e Mainta in Engineering Subcontracto r Supplier/ Manufacturer Operation of other plants EPC/ Plant Designer Supplier/ Manufacturer Handover EPC  O/O Standardized Data Model mapping

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 23 Plants Data Life Cycle Management A challenge for Operators and Plant Designers in Nuclear Power: Evolute ISO standard to the needs of the nuclear power industry Establish ISO as standard for data handover Enforce IT-solution providers to provide tools conform with ISO Enforce IT-solution providers to allow easy changes to the data without the need to implement the full original tool The benefit for the Owners & Operators: Limit Operators‘ costs for software licenses/ updates & staff qualification Ensure life-time maintainability of information independend from IT-tools Facilitate and accelerate data handover processes

> AREVA NP GmbH Frank-Peter Ritsche, RGP, May 2006 © all rights reserved 24 No questions ! Questions ?!?! You do not have any questions, do you? Contact: Frank-Peter Ritsche, PMP AREVA NP GmbH Project Management Initiative Contact: Frank-Peter Ritsche, PMP AREVA NP GmbH Project Management Initiative