Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.

Slides:



Advertisements
Similar presentations
Applying Floor Finish To Protect Floor Surfaces, and to Maintain Clean, Safe, Attractive Floors.
Advertisements

Mercury is a Hazardous Material
The students in the Freshman Academy & the Green School Initiative are proud to present the following on- line tutorial about biodiesel production at HPHS.
UMES Presented by Environmental Health and Safety Preston Cottman (410) Hazardous Material Spill Response Training.
Hazardous Chemical Spill Response and Containment Program
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
Best Practices for Environmental Cleaning
Tulane University - Office of Environmental Health & Safety (OEHS) HAZARDOUS MATERIAL SPILLS For Tulane Laboratory and Facilities Employees May 2012.
Mercury Spill Clean-up Procedures
IAEA International Atomic Energy Agency IAEA Seibersdorf Pu-240 incident, clean-up and lessons learnt John Hunt, Rudolf Hochmann, Hugo Eisenwagner, Tobias.
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
VACUUM TRUCK OPERATIONS CAER Safety Summit – June 2012.
Homework Assignment 01...is from Chapter 1. Problems assigned are: 4,5,9,10,12,15,22,29,31 (pages 29 ff) This assignment is due at class time Friday, Sept.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
ACADs (08-006) Covered Keywords Lab ware, glassware, balances, heating apparatus, separation apparatus, hydrometers, viscometers, pipettes, titrators,
/0403 Copyright © 2004 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Metalworking Fluids.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
MERIT Equipment Disposal Van Graves MERIT Video Conference September 1, 2010.
Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Managed by UT-Battelle for the Department of Energy Using Lead-Bismuth Eutectic in MERIT Syringe Pump Van Graves October, 2007.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Optics Cleaning Status 31 August 2011 MERIT Optics Cleaning Status V.B. Graves August 31,
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves NFMCC Friday Meeting Feb 29, 2008.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
NORTH AMERICA TECHNICAL SOLUTIONS Spill Response, Clean-Up, and Emergency Response.
Pesticide Spills Prevent…Prepare…React. Consequences of Spills Loss of time and money Loss of time and money –Man hours spent on spill clean up –Disposal.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
7. EMERGENCY RESPONSE RYERSON UNIVERSITY.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
The science that deals with the recognition, evaluation and control of hazards in workplaces in order to prevent illness among employees. ?
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
May 7 th,  There’s a direct link to it from the Shimizu Lab Website or go to  All personnel are responsible for.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Solutions & Solubility Solution Preparation by dilution.
Laboratory Procedures Chemical Management Emergency Laboratory Equipment m.inmagine.com CH5, CH6, CH10.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Status of the Design Study Richard Catherall EN-STI-RBS.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
Bellwork 1.List three items of Personal Protection Equipment (PPE) 2.In your own words, define “safety.”
Sampling Oil-Filled Transformers
Mercury is a Hazardous Material
Safe Handling and Use of Liquid Nitrogen
Hg System Decommissioning Activities
Neutrino Factory Mercury Catcher Concept
Science Safety.
Safety Moment Mercury.
Unit 1 Safety Power Mechanics.
Presentation transcript:

Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008

2Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Day 1 Activities  Optical fibers removed except for VP #2  Hg system draining preparations –Equipment in place (flasks, peristaltic pump, safety equipment, etc) –Extracted Hg system from solenoid  Radiation measurement center of snout ~70 µSv

3Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Day 2 Activities  Started Hg draining operations –Pumped into intermediate container 1 st time –Moved peristaltic pump to container exit to provide Hg sample per CERN request –During this operation, Hg continued to gravity-feed into container, overflowing it  Per procedure, sump tank drain valve should have been closed after pump into container

4Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Spill Conditions  Operators and monitoring personnel wearing respiratory protection at all times  Local ventilation in use  Estimate total overflow ~200 ml –Most contained within tray or within container bucket –~50 ml fell onto plastic or directly onto floor

5Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Spill Response  Drain valve immediately closed upon condition recognition  Pumped Hg into flask to remove overflow condition from intermediate container, then closed flask  Personnel not wearing PPE requested to leave area  Prepared Hg vacuum cleaner, started cleanup of larger Hg pools then entire local area  Wiped equipment with HgX solution and prepared to continue draining operations  CERN fire brigade responded as required, inspected area, then allowed us to continue cleanup  CERN Chemical Safety inspected operations, allowed draining operations to proceed

6Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 More Day 2 Activities  After drain operations continued, syringe pump drained of Hg without incident –Tilted Hg system as required to maximize fluid removed –Respirator use & local ventilation continued –Each full flask weighed and placed back into transport drums –Left Hg in vacuum cleaner storage canister and in plastic intermediate container  Vacuum cleaner and local ventilation exhaust monitored during cleanup – no vapors detected

7Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Day 3 Activities  Met with CERN Medical personnel  Removed Hg from vacuum cleaner and plastic container, poured into shipping flask  Cleaned floor with HgX solution, let dry ~4hrs, used vacuum to remove remaining liquid –Hg vapors ~200 µg/m^3 at floor level, ~0 a few cm above floor  Placed Hg-absorbing powder on floor, left overnight  Drained hydraulic fluid from HPU

8Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Hg Drained From System  Includes Hg added from vacuum cleaner and intermediate container  Includes CERN sample volume  Hg left in syringe < 0.5 liter

9Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Day 4 Activities  Blood sample taken by CERN Medical –Test results available in 2 weeks  Cleaned Hg powder from floor –Vapor levels decreased by factor of 2 or better  Reapplied powder to floor, will remove at 4pm  Tools monitored and removed from area  Hg system ready for transport

10Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Day 5 Activities  Performed final wipedown of spill area floor –Hg vapor readings ~20 µg/m^3 –Indications from CERN RP were they were satisfied with our efforts  Moved most of equipment out of ISR –Optical diagnostics crate to be shipped to BNL –Some large items need to be moved from ISR

11Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Lessons Learned  Don't deviate from procedure without careful consideration of possible consequences  Perform dry run of operational procedures before real Hg operations  Maximize amount of spill containment area

12Managed by UT-Battelle for the Department of Energy NFMCC Friday Meeting 29 Feb 2008 Future Plans  Equipment to be removed from experimental areas by CERN transport group Feb/Mar  One crate optical diagnostic equipment to be shipped to BNL soon  Remaining MERIT equipment stored at CERN through Dec 07 for radiation decay  Ship mercury and MERIT equipment to ORNL Jan 09 –Current plans call for engineering study to modify syringe pump for use with new target (Pb-Bi) –Considering possibility of continuing Hg R&D –Appears ORNL is capable of performing integrated systems testing (no beam)